All content in this website is sourced legitimately

Page No: 1
Briefs
Oct 05: For reference purposes the website carries here full reports on the performance of:
-- REC Transmission Project Company Ltd Click on Reports for more  
-- REC Power Distribution Company Ltd Click on Reports for more  
-- Ghatampur Transmission Ltd, a subsidiary of REC Transmission Project Company Ltd Click on Reports for more  
-- Dinchang Transmission Ltd, again a subsidiary of REC Transmission Project Company Ltd Click on Reports for more  
8Water usage policy of NTPC Click on Reports for more 
8The 2017-18 MOU of the GOI with NTPC Click on Reports for more 
8A business development opportunity for a captive 17 MW power requirement (12 MW through Waste Heat Recovery Boiler (WHRB) and 5 MW through Fluidized bed combustion (FBC) Boiler) Click on Reports for more 
8Business Responsibility Report of JSW Energy Ltd Click on Reports for more 
8At an all India level, demand for power is estimated to remain tepid at ~6% over FY18-22 owing to reducing electricity intensity in GDP, rising efficiency and reducing technical losses. This will mean that stressed coal based assets of around 46 GW will find it difficult to go through a revival process Click on Reports for more 
8No long term PPAs are likely to be signed by discoms till 2020 on account of a host of structural factors Click on Reports for more 
8New fluidized bed combustion boilers will go a long way to resolve India's carbon emission problems as will  retrofitting of conventional boilers pave the way for more efficient power   Click on Reports for more 

**********************************

Back  |  Top