All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


May 2022

8India’s leadership in green hydrogen will be decided by its leadership in the electrolyser
8Know more
Click on Reports for more
Details
8Get the latest update on composition of members of Internal Scrutiny Commitee of mining plan and mine closure plan
Click on Reports for more
Details
8Here is an update on the capex plans for the hydro power projects
Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Design, engineering, procurement, construction & erection, testing, commissioning and comprehensive O&M of 25 MW (AC) SPV Power Plant Details
8Tender for survey, design, supply, installation, testing and commissioning with RMS of 9 Mtr. Solar Based LED High Mast Details
8Design, fabrication, supply, installation, testing, commissioning with RMS of cumulative total 132 kW GCRT Details
8Supply and installation of pump-motor sets and control panels Details
8Tender for transportation of coal from various mines to TPS through Rail and Road-Cum-Rail Mode Details
8Tender for supply of EFW Coal Discharge Pipes for coal mill Details
8Design, fabrication, supply, installation, testing and commissioning with five years CMC of On-Grid SPV power plants Details
8Tender for procurement of spares for Instrument Air Compressor Details
8Tender for supply of electrical spares parts for 125/30T EOT Crane of TPS Details
8Tender for transportation 6 LMT of Coal from mines to TPS Details
8Tender for construction of 132 kV S/C line Details
8Tender for construction of LILO of 220 kV S/C line Details
8Tender for procurement of 11kV CTPT sets Details
8Tender for procurement of MS ERW Pipes Details
8Tender for supply of 11kV AB cable with accessories Details
8Tender for procurement of stainless steel super boiler tubes Details
8Tender for procurement of 2400 KG SF6 Gas for breakers Details
8Tender for work of overhauling of 245 kV circuit breakers Details
8Tender for AMC of overhauling servicing and repairing of 220 kV Isolators Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Adani Green Energy signs MoU with AP for projects worth Rs 60,000 crore Details
8JSW Energy to seek shareholders' nod to raise up to Rs 5,000 crore Details
8Financing India’s Shift To EVs Details
8India eyes cooperation with France on green hydrogen Details
8India’s Hindustan Salts Tenders 1 Gigawatt Of Solar Capacity Details
8How India’s power crisis is self-made & why we could face another crunch during the monsoon Details
8Championing Energy Course Details
8Rs 12,000 crore sanctioned for revamping power infra in J&K: Minister Details
8Phasing out of coal plants can avoid over 14.5 mn premature deaths: Study Details
8Govt may invoke emergency powers to let power producers step out of PPAs Details
8Work on installing 100 public charging stations for EVs in Delhi nearing completion: officials Details
8OLECTRA bags biggest ever order Details
8India to be the leader of green hydrogen: Puri in Davos Details
Click on Newsclips for more
Details
Rs:30000 crore thermal power station

8 Absorber system package is expected soon.
Click here for more details

Details
Hydroelectric Power Greenfield Project (Stage-I)
8Modification of DPR is in progress.
8RFQ for the EPC package for civil, HM, works is likely to be floated in Q3 2022.
Click here for more details Details
Construction of 220 kV S/C Transmission Line
8RFQ for the ACSR Deer conductor package is likely to be floated in June 2022.
Click here for more details Details
8Tariff review petitions hardly ever pass muster
8This one from Damodar Valley Corporation did not as well
Click on Reports for more
Details
8Tariff revisions have been completed for the National Capital Thermal Power Station Stage-II (980 MW). Click on Reports for more
8Truing up was done for a PowerGrid transmission project. Click on Reports for more
8If you are looking to build a project report for a new generation power projects, here is where you can go. Click on Reports for more
8An analysts' conference on Triveni Turbines throws up interesting insights into the business and what the future holds in store. Click on Reports for more Details
8A nominee director has been changed in the board of Jaiprakash Power Ventures Ltd
Click on Report for more
Details
8New Chief financial officer (CFO) takes over at Jindal Steel & Power Ltd
Click on Report for more
Details
8Maharashtra can contribute significantly to Indian renewable target (500 GW upto 2020) by utilising its green energy potential
8Find out more
Click on Report for more
Details
8The expansion of the LNG industry as planned in the context of coal-to-gas switching is incompatible with the 1.5ºC temperature target of the Paris Agreement by 2050.
8The ability of LNG to reduce global emissions in the 1.5ºC pathway is limited by the availability of coal-based power generation
Click on Report for more
Details
8There are two projects in the world that claim to be hydrogen production with CCS. They both produce hydrogen with fossil gas
8Both project creates significantly more emissions than it sequesters
8Know the project details here
Click on Report for more
Details
8A joint inspection is being done by PGCIL and HPSEBL to explore alternate ways to lay OPGW on this line
8Here are issues faced in the process
Click on Report for more
Details
8Power Mech Projects Ltd seems to have successfully expanded its footprint to other segments of the economy
8It is now eyeing business abroad with greater diligence
Click on Reports for more
Details
8The solar power industry has been squeezed by the government to a corner
8The domestic industry makes up just 20 per cent of total solar module demand in India and yet it gets overriding protection to the detriment of the entire solar industry.
8We let you go deeper into why solar module costs, which makes up 65% of the overall cost of setting up a power plant, are going up rapidly
8Tight government policy will push many solar power producers to insolvency
Click on Reports on what needs to be done
Details
8What are the plans ahead for NTPC
8The focus is on renewables
8Find out more on capex estimates and what kind of IRR the company has set its targets on
Click on Reports for more
Details
8The Indian market is getting to be tough sailing for GE T&D.
8COIVD after effects and intense competition are the two major hallmarks of the busienss now
8It has a 100 years of presence of India but the going is tougher than before
Click on Reports for more
Details
8BHEL is back in the black after a couple of bleak years
8What has driven this turnaround and will it last?
Click on Reports for more
Details
8There are some very interesting fresh projections on renewable energy costs going forward, right up to the year 2050
8Then there is the levelized cost of solar and wind-produced hydrogen.
8This is global data but find out where India stands in all this
Click on Reports for more
Details
8LNG terminal capacity is low, and some of the new terminals are struggling to get off the ground on lack of deemand
8Yet this players is planning a new 5 MMTPA LNG terminal.
8And plants are at an advanced stage, and RFQs are out
Click on Reports for more
Details
8New directors takes over at Schneider Electric Infrastructure Ltd
Click on Report for more
Details
Rs 3000 crore greenfield hydroelectric project
8RFQ for the drilling and drifting works is likely to float in July 2022.
8Get key contacts here
Click here for more details Details
8220 kV D/C  Transmission Line
8RFQ for the 220 kV P/S package is likely to be floated in June 2022.
Click here for more details.
Details
This is a 12,000 crore greenfield thermal power plant
8Many contractors were involved, it is nearing commissioning
8But some RFQs are still left
Click here for more details Details
Rs 4000 crore greenfield Pump Storage Project
8Tender package preparation work is ongoing
8RFQ for the PMC package is likely to be floated in Q3 2022.
Click here for more details Details
For reference purposes the website carries here the following tenders:
8Tender for mechanical maintenance and operation assistance contract for ash handling system Details
8Tender for biennial contract for mechanical maintenance of CHP system Details
8Tender for construction of 132 kV Single Circuit transmission line on double circuit towers Details
8Tender for procurement of steel materials at CHP Details
8Design, supply, installation, testing and commissioning of Precision Air Cooling System, Ductable split Air Cooling System and associated work Details
8Tender for work of availing comprehensive technical services for hydraulic system at CHP Details
8Design, supply, installation, commissioning and O&M for 100 TPD Torrefied Biomass Pellets manufacturing plant project Details
8Tender for procurement of MS ERW Pipes Details
8Tender for overhauling contract for boiler pressure parts Details
8Tender for operation and maintenance works of 20 MW solar PV power plant Details
8Tender for Supply of 02 Nos. Tyre Mounted 40 MT Load capacity Rough Terrain Mobile Crane Details
8Design, supply, construction, testing and commissioning of Rooftop solar PV systems Details
8Tender for routine & breakdown maintenance of 6.6KV H.T. Motors Details
8Request for Quotation (RFQ) for overhauling of Boiler and Auxiliaries Details
8Tender for construction of 33kV line Details
8Tender for work of replacement of existing 33 kV ACSR Dog Conductor with 33 kV AAAC covered conductor Details
8Tender for supply of galvanized stay strand wire Details
8Design, Testing and supply of SF6 circuit breakers Details
8Tender for annual maintenance contract of cranes Details
8Tender for the works of repairing, vulcanizing, reinstalling, replacement, reconditioning and pulley lagging of various conveyor belts Details
8Tender for supply and delivery of primary bottom bank coil Details
8Tender for procurement of Re heater Inlet and Outlet coil assembly Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Tata Power, Tata Motors to develop 7MWp solar rooftop in passenger vehicles Details
8EVs, energy, tech feature in PM Modi’s meetings with Japanese business leaders Details
8Discoms unlocking Odisha's growth potential Details
8India’s coal crisis exposes power sector woes Details
8Metal stocks melt down as government imposes export duties Details
8Greenko Group to supply green power to ArcelorMittal, Ayana Renewable, 3 states Details
8IREDA sanctioned Rs 14,000 crore loans for renewable energy projects in Maharashtra Details
8How robots can help build offshore wind turbines more quickly Details
8China's coal imports from Russia nearly double amid Ukraine crisis: Report Details
8States, power companies seek coal imports aggregator Details
8No penalty on imported coal-based power plants for default: Government Details
8Delhi’s peak power demand clocks a record 7,070 MW Details
8Power Generation Doubles In May On Imported Coal Blending Details
8BEE tells Andhra government to tap investment potential in energy efficiency sector Details
8PGCIL Q4 net profit rises 18 pc to Rs 4,156 crore Details
Click on Newsclips for more
Details
Rs 900 crore Greenfield Hydroelectric Project
8Get key contacts here, also check when the RFQ for the Civil works package is likely to be floated.
 
Click here for more details Details

8RFQ for the 220 kV P/S works package is likely to be floated in Q3 2022.
Click here for more details Details
Rs 2000 crore Greenfield Pumped Storage Project
8Get the latest status update
8RFQ for the drilling and drifting work is likely to be floated soon.
Click here for more details   Details
A large thermal plant is under completion.
8Get the list of contractors here
Also, RFQ for the DeNOx system package is ahead.
Click here for more details Details
8Here is an update on the capex plans for the transmission projects
Click on Report for more
Details
For reference purposes the website carries here the following tenders:
8Tender for overhauling of boiler non-pressure parts Details
8Tender for routine, preventive, breakdown maintenance works activities of HPS Details
8Tender for transportation of coal from mine site to power plant through RcR Mode Details
8Tender for procurement of 14 Nos. of 2.2KW valve cooling tower fans Details
8Supply of spare rotor pole windings for 26.6 MVA Synchronous Hydro Generator Details
8Tender for supply of 415V DG set with accessories Details
8Tender for transportation of coal from mine site to power plant through RcR Mode Details
8Tender for repair & overhauling /servicing of 400KV Circuit Breaker Details
8Tender for the supply of Imported Non-Coking Coal Details
8Tender for overhauling of steam generator auxiliaries Details
8Tender for supply of spares of coal mill Details
8Tender for procurement of relay for TPP Details
8Tender for procurement of spare parts of Ring Granulator installed at CHP Details
8Annual maintenance contract of 220 V battery chargers Details
8Expression of interest (EOl) for setting up 10 MWh of grid- scale battery energy storage system Details
8Supply, installation, testing and commissioning of HP submersible water pumping system Details
8Tender for work of overhauling of Fans of 500 MW Unit Details
8Design, manufacture, supply, installation, testing and commissioning of 25 kW capacity grid connected solar PV power plant Details
8Tender for 33kV UG cable laying work Details
8Tender for work of overhauling of 245KV & 145KV circuit breakers Details
8Annual maintenance contract of Turbines, Generators and its associated equipments Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Government to use power sector infra for 5G deployment Details
8What does Mahindra’s new deal with VW mean for the EV ecosystem? Details
8UP to be biggest data storage centre in north India: State govt Details
8Industry Players To Discuss Energy Reduction Cost Measures Next Month Details
8India will influence world on renewable energy during G20 presidency: IRENA Details
8Uttarakhand government signs MoU with BPCL for renewable energy Details
8Stellantis bets big on India market; to launch first EV next year Details
8GMR Power And Urban Suffers Rs 274 Cr Loss In Q4 Details
8Okinawa Autotech To Form JV With Italian Electric Bike Maker Tacita Details
8Union ministry asks 6 states to clear dues to power stations, Coal India Details
Click on Newsclips for more
Details
8Mr Sumit Kumar Shaw has been appointed as Chief financial officer (CFO).
Click on Report for more
Details
8Plant availability factor (PAF) has decreased
8Here are the latest updates on the company
Click on Report for more
Details
8Find out what guidelines have been issued so that tripping is avoided 
Click on Report for more
Details
8New directors takes over at the DMR Hydroengineering & Infrastructures Ltd
Click on Report for more
Details
8Serious objections have been raised against the proposal of 765kV Narendra-Pune line
Click on Report for more
Details
8Construction of 400 kV Quad D/C Transmission Line
8RFQ for the P/S package is likely to be floated in July 2022.
Click here for more details Details
Rs 1580.38 crore hydroelectric project
8RFQ for the drilling and drifting works is likely to be floated in June 2022.
Click here for more details Details
Brownfield thermal power plant
8Find out who the other contractors are
8RFQ for the C&I system package is likely to be floated in July 2022.
Click here for more details Details
For reference purposes the website carries here the following tenders:
8Tender for overhauling of boiler pressure parts Details
8Tender for procurement of critical & consumable spares of air blower Details
8Tender for LILO work of 400kV S/C line Details
8Tender for overhauling of IP & LP Turbine Details
8Supply, installation & commissioning of Early Warning System (EWS) in HEP Details
8Annual plant maintenance of generating units and auxiliaries Details
8Tender for operation and maintenance of CHP Details
8Tender for attending emergency breakdown work & annual routine maintenance 220/132/110kV various EHV lines Details
8Tender for procurement of collecting electrodes for ESP Details
8Tender for supply and drawing of LT AB cable Details
8Tender for repairing, hot vulcanizing and cold jointing of conveyor belts and Lining on various conveyor pulleys Details
8Tender for major maintenance and repairing works of Primary and Secondary crushers Details
8Tender for design, engineering, supply, construction, erection, testing, commissioning and O&M of 22 MW Solar PV Power Plant Details
8Tender for BMC for routine & breakdown of milling system Details
8Tender for procurement of CHP Conveyor pulley Details
8Tender for procurement of Dry Type Transformer Details
8Tender for capital overhauling of turbine & LPT overhauling Details
8Tender for Residual life assessment (RLA) of boiler and its auxiliaries Details
8Tender for routine maintenance works on turbine lube oil system Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Solar PV module manufacturer Waaree Energies bags orders worth $2.37 bn Details
8Volkswagen, Mahindra & Mahindra sign agreement to collaborate on EVs Details
8New electric mobility strategies will help India combat global warming: Stellantis CEO Details
8Race for Mytrah Energy assets: JSW Group signs exclusivity pact Details
8Paying for electricity Details
8Why is India facing its worst power crisis in over six years? Details
8Climate change: India is a hotspot for climate tech funding Details
8Import coal in time or face penalty: govt to power generation firms Details
8Govt pushes states, gencos to import coal before monsoon to offset shortage Details
8Chhattisgarh CM defends Parsa coal mining; says country needs coal to generate power Details
8India's Power Grid Creaks Under Hybrid Work Model, Heatwave Details
8Magenta ChargeGrid partners with Ather Energy to install EV charging stations Details
8Restrictions on power supply to industries in Andhra Pradesh lifted Details
Click on Newsclips for more
Details
8Rs 5100 crore greenfield hydroelectric project
8RFQ for the EPC package for civil and HM works is likely to be floated in Q3 2022.
Click here for more details Details
8Despite holding the promise of flexibility and the green premium on renewable-based power generation, the REC mechanism in India has faltered since its launch in 2010–11.
8Here is a comprehensive look at which it failed to have the desired result
Click on Reports for more
Details
8There is a roadmap here for net zero for heavy industry sectors
 
8This is relevant for Europe but has implications for Indian planners too, on how electricity demand will be impacted if this happens here too
Click on Reports for more
Details
8Here is an update on the capex plans for the steel and metal sector
8These power-hungry sectors have big requirements for captive power plants
Click on Reports for more
Details
8CESC Ltd posted an indifferent performance as gains in some segments were balanced by losses in others
 
8But yet there is a "buy" order out on the scrip
 Click on Reports for more
Details
 < 1 2 3 4 >  Last ›

Showing 51–100 of 245 items