All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


Jun 2021

Project Name:  Thermal Power Station - FGD Addition
8
Project Cost: Rs 321.3 crore
8Project EventRFQ for the EPC package for supply, erection, installation, testing, and commissioning of FGD is likely to be floated in Q4 2021.
Click here for more details Details
The auction was held in February for this transmission system and Power Grid Corporation of India Ltd came out the L-1 bidder
8But the tariff differential so high between the L-1 and L-2 bider that eyebrows were raised on how exactly would the company get away with such a low tariff rate
8The fact that it sought a higher rate immediately afterward went to show that PGCIL may have under-bid for the project
Click on Reports for more Details
For reference purposes the website carries here the following reports:
8Esmart Energy Solutions Limited: Profitability of EESL is exposed to fluctuations in foreign currency Details
8Arka Carbon Fuels Private Limited: Non-cooperating with rating agency Details
8Yajur Commodities Limited: The company is exposed to raw material price fluctuation risk Details
8Swastik Coal Corporation Private Limited: Non-cooperatiion with rating agency Details
Click on reports for more
Details
8RFQ for the EPC package for the installation of FGD is likely to be floated in Q4 2021.
8Rs 225 crores.
Click here for more details.
Details
It is an R&M project
8Cost Rs 323 crore
8RFQ for R&M of the boiler and turbine for Unit-3(200MW0 and Unit-5(210 MW) units is expected by Q1 2022.
Click here for more details. Details
8The company is planning to increase captive power capacity from 227MW to 357MW
8It is expected to be operational between FY22-25
Click on reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for running and maintenance of DG sets and electrical works Details
8Tender for day to day maintenance like repairing of coal pipe hanger Details
8Tender for RLA study of 500MW KWU design steam turbine Details
8Tender for procurement of spares for 400kV circuit breakers Details
8Tender for the Supply of 6000 Nos of 9.00m PSC poles Details
8Tender for the Supply of 3000 Nos of 9.00m RCC Square Section poles Details
8Tender for Purchase of 25 KVA Metal LT Distribution Boxes Details
8Tender for the Work of repair of relays Details
8Tender for Work of Counter Poise Earthing for various 220KV Lines Details
8Tender for Bi-Annual Maintenance Rate contract for Servicing, Overhauling of OLTC of various capacities ICT & Power T/F Details
8Tender for AMC for providing and installation of maintenance free earthing dedicated earthing for transformer Details
8Tender for Providing Insurance coverage on reinstatement value to the assets of 216MW Combined Cycle Power Plant Details
8Tender for procurement of 145 kV Isolators Details
8Tender for Service contract for erection of new LOW NOX BURNER and new OFA DUCT Details
8Tender for Procurement of MS ERW pipes for Up gradation of Ash Slurry System Details
8Tender for Rate contract for two years for mechanical maintenance & operation support services of turbine and generator associated equipments & auxiliaries Details
8Tender for Hiring of Services for Preparation, Submission and Approval of Revised Initial Environmental Examination Report of 400KV Transmission Line Details
Click on tenders for more
For reference purposes the website carries here the following newsclips:
8Coal India's FY21 profit tumbles 24% as power, metal sector demand dwindles Details
8Amara Raja Batteries to diversify into emerging energy opportunities Details
8RattanIndia Power pares Rs 1,219 crore debt in last 15 months Details
8Reliance Power to raise Rs 1,325 cr from R-Infra via preferential allotment Details
8Coal India Ltd final dividend to enrich govt by Rs 1,426 crore Details
8Global fossil fuel use similar to decade ago in energy mix, report says Details
8Goldi Solar plans to expand manufacturing capacity to 2.5 GW Details
 
8SJVN inks pact with National Institute of Wind Energy for energy projects Details
8 NHPC, BSHPC sign pact to set up 130.1-MW hydro power project in Bihar Details
8India to require 4,00,000 charging stations for 2 million EVs by 2026: Report Details
8New pooled power mechanism to reduce cost for debt ridden Discoms Details
8Delhi govt approves single-window facility to facilitate expansion of EV charging infrastructure Details
8Industries in Madhya Pradesh want proposed power hike dropped Details
8 Wartsila to set up 30-MW power plant for Oil India in Assam Details
Click on newsclips for more
Details
Installation of FGD
8Cost: Rs 215 crores
8RFQ for the civil architectural works for the FGD addition projects is likely to be floated in Q1 2022 and RFQ for the supply, erection, installation, testing, and commissioning of FGD is likely to be floated in Q2 2022.
Click here for more details.
Details
We are glad to announce the reactivation of our project monitoring software for the energy sector.
8Here is a Rs 720 crore FGD Installation and Ash Handling Plant modernization Project
8Project Event: RFQ for design, engineering, supply, transportation, installation, erection, and completion of an FGD package is expected by Q1 2022. RFQ for modernization and up-gradation of ash handling plant for units 3-6 and boiler fuel firing system for unit 1-6 is likely to be floated by end of Q4 2021.
Click here for more details
Details
8Bids are invited from EPC contractors for a 5MW Grid Connected Floating SPV power plant
8Bids for EPC contract with 05 Years comprehensive maintenance contract of (5kW to 35kW) On-grid SPV power plants
Click on reports for more
Details
8Are you interested in  hydro electric power projects? There are two small ones you can put your money in
8Hydro Electric Project (2 x 1 MW)
8Hydro Electric Project (2 x 0.2 MW)
Click on reports for more
Details
Here is this hydel project
8Project Cost: Rs1061.21 crores
8Project Description: New contractors had to be organized as the project suffered several years of delay.
The civil works of the project are being executed by Moshvaraya Infrastructure Ltd. The contract for Electro-Mechanical works for Turbine and its Auxiliaries has been awarded to M/s Litostroj Power d.o.o., Slovenia and for Generator and its Auxiliaries to M/s CG Electric Systems Hungary Zrt., Hungary. The hydro-mechanical works have been awarded to M/S Texmaco Rail & Engineering Limited and M/s Chhattisgarh Metaliks & Alloys Pvt. Further bids are expected soon.
Click here for more details Details
This is a Rs 5747 crore hydel project
8Project Event: RFQ for the civil works package -1 is likely to be floated in Q1 2022.
Click here for more details Details
For reference purposes the website carries here the following reports:
8
Sprng Transform Sun Energy Private Limited: STSEPL remains exposed to the risk of grid curtailment by TSSPDCL Details
8Durga Infra Mining Pvt. Ltd: Exposed to regulatory risks associated with mining Details
8Transmission Corporation of Andhra Pradesh Limited: Delays in servicing of Vidyut Bonds Details
8Tamil Nadu Generation and Distribution Corporation Limited: The corporation is expecting that the tariff revision may be revised in the next six to nine months Details
8Sprng Solren Private Limited: SSPL remain exposed to interest rate movement, given the single part and fixed tariff under the PPA Details
8East Coast Energy Private Limited: Non-Cooperating category Details
Click on reports for more
Details
For reference purposes the website carries here the following tenders: 
8Tender for procurement of 65,000 Nos. Male-Female contact sets Details
8Tender for overhauling of 200MW generator and attending the rise of seal babbit metal temperature fault Details
8Tender for the procurement of metering equipments Details
8Tender for the supply of 5100 Nos. 110KV 120KN polymer composite insulators Details
8Tender for Procurement of economizer tube and tubes Bend Details
8Tender for round the clock running, preventive and breakdown maintenance of MAX-DCS system and main plant C&I system Details
8Tender for the Overhauling of LP Turbine Details
8Tender for the supply of 9200 Nos. 110KV 90KN Polymer Composite Insulators Details
8Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of complete Chlorine Di-oxide plant Details
8Tender for Operation Support Services on round the clock basis for TPS Details
8Tender for Annual Rate Contract for Operation & Maintenance of Sewage Treatment Plant (STP) Details
8Tender for Design, supply, erection, testing & commissioning of hydro-mechanical components Details
8Tender for Design, supply, erection, testing & commissioning of E-Flow Gates, Screw Hoists & Butterfly Valves and Associated Equipment Details
8Design, supply, installation, testing, commissioning with remote monitoring system of 35 kW and 5 kW solar PV power plant Details
8Tender for manufacture, testing, supply and delivery of energy meter fitted with pilfer proof meter box Details
8Tender for AMC for work of repairing, overhauling, servicing and alignment of isolators Details
8Tender for supply of portable electronic reference energy meter Details
8Tender for Work of replacement of existing old Damaged / Broken 0.2 ACSR Panther conductor by new 0.2 ACSR Panther conductor Details
8Tender for Supply and Delivery of 132kV and 33kV Surge Arresters Details
8Design & Engineering, Supply, Erection, Testing and Commissioning of 5MW Solar Photovoltaic Power Plant Details
Click on tenders for more
For reference purposes the website carries here the following newsclips:
8Solar equipment manufacturing: More clarity is needed on the agenda Details
8Godawari Power trades higher for seventh straight day; zooms 51% in 3 days Details
8GE T&D India Q4 PAT at Rs16.1cr, revenue up 36.2% yoy; Stock trades flat Details
8Discoms' outstanding dues to gencos fall 11.2% to Rs 81,628 cr in April Details
8CG Power lines up Rs 135 cr capital expenditure in current financial year Details
8Coal India's 114 mining projects under different stages of implementation Details
8Board of Rel Infra approves subscription to preferential issue of RPower Details
8Sterling and Wilson Solar appoints Amit Jain as Global CEO Details
8Coal India amends policy, allows export of fuel bought via e-auction Details
8Clean energy investment in developing economies top global priority: IEA Details
8Maharashtra can save Rs75,000 crore on power generation in 10 years: Report Details
8Goa industrial development corporation's coal block plans in limbo Details
8Maharashtra moots mega solar projects in Marathwada, Vidarbha Details
8Directed power dept to ensure early completion of Darbar Sahib solar power project: Punjab CM Details
8Odisha approves Rs 1,637 cr investment projects; Power sector in focus Details
8Godhna project in Chhattisgarh turns white elephant for Karnataka Details
8Revision in FAME-II norms to boost electric 2-wheeler demand: Hero Electric Details
Click on newsclips for more
Details
8The setting of the FGDs for a whole lot of generating stations as per central government provisions are considered a change of law
8But no mechanism has yet been established to compensate the generating stations for the consequences of this change in law
Click on Reports for more Details
Losses are mounting
8And conditions are deteriorating
Click on Reports for more Details
8NTPC has set up two large scale solar power plants in its thermal generation
8And it is now facing problems in integrating the power into the grid as it comes under the government's flexible generations scheme
Click on Reports for more Details
The company is involved in the overburden removal in mines
8And in the mining business
8The outlook is healthy, and while debts are high, the ability to service is getting better
Click on Reports for more Details
8Clearly, things aren't going as well as they should for this transmission company.
8There are delays in debt servicing
Click on Reports for more Details
8Get all the technical information on the auctioning of coal blocks here
8In case you are interested
Click on Reports for more. Details
8Chinese hardware and software in IT systems are not encouraged it seems in the power sector
 Find out more   Details
The ministry of coal is trying to clear the cobwebs by doing away with archaic regulations
8It is turning out to be a big and complicated task
8Here is an example
Click on Reports for more Details
What is the due process for auctioning of coal mines as of now
8The last date for submission of bids for the mines is June 26.
8Is acquiring a coal mine now, when energy economics is transforming rapidly, too risky? Or is it?
 Know all about it Details
How much money does a regional load dispatch centre spend every year
8Quite a bit it seems
8And the HR component is the most significant bit by any yardstick
Click on Reports for more Details
8WHRB based-10MW
8AFBC based-10MW
8Expansion Captive Power project from 75MW to 285MW
8Captive Power Plant-295MW
8Co-generation power plant-40MW
Click on reports for more
Details
For reference purposes the website carries here the following tenders: 
8Tender for procurement of complete gear box (Rotation Right) of APH Details
8Tender for procurement, erection, commissioning & testing of 400KG Rack & Pinion type elevator at AHP Details
8Tender for procurement of vibration monitoring system for HT Drives Details
8Tender for supply, erection & commissioning of emulsifier system for transformers Details
8Tender for coal handling plant run-off water treatment system Package Details
8Tender for Short term Service Contract for maintenance of mechanical equipments of main plant boiler and its auxiliaries Details
8Tender for biennial maintenance contract for boiler & auxiliary Details
8Tender for Design, manufacturing, supply, retrofitting, testing and commissioning of numerical relay based Bus-Bar differential protection Details
8Tender for annual rate contract for unloading of coal Details
8Tender for Electrical Protection Audit at gas based Power Plant Details
8Tender for annual maintenance contract for boiler & its auxiliary system Details
8Tender for Work of Installation, Testing & Commissioning of 125 MVAR, 420kV, 3 Phase Shunt Bus Reactor Details
8Tender for work of renovation of existing earth mat and augmentation of earthing arrangement Details
8Tender for work of shifting/height rising of 220kV D/C transmission line Details
8Tender for Work of Supply, Erection, Testing and Commissioning of 22kV Feeder along Civil works Details
Click on tenders for more
For reference purposes the website carries here the following newsclips
8NHPC plans to expand solar and wind power portfolio Details
8PLI to help India catch up with storage manufacturing race: Rahul Walawalkar Details
8IKEA To Help India Suppliers Go Green By Enabling Shift To Renewable Energy Details
8India's wind power sector wants rival solar to help drive growth Details
8ALMM Effect: Solar Developers Worried About Supply, Module Makers Unconcerned Details
8TN well placed for clean energy transition Details
8Clean energy transition could save Maharashtra Rs75K-crore in 10 years: Study Details
8Electric mobility startup Cell Propulsion raises $2 million Details
8Tata Power arm CGPL raises Rs 570 cr via NCDs Details
8Schlumberger announces collaboration with Panasonic for sustainable lithium production Details
8At 6,499 MW, Delhi sees highest power demand this summer Details
8Australia government needs to help coal-fired power - Alinta CEO Details
8Retiring old coal plants can help Maharashtra save Rs 16,000 cr in five years: Report Details
8Rajasthan to Centre: Don’t end waiver on solar transmission charges Details
8China to end subsidies for new solar, onshore wind projects in 2021 Details
Click on newsclips for more
Details
8Allowing cost of leasing of flats over what is entitled
8How should that be treated?
Click on reports for more
Details
8FDG-invested power plants seek fresh power market access concessions
Find out what the regulator has to say.
Details
8COVID impacts data collection and tariff revision of 1600 MW power plant
Click on Reports for more Details
8Bagasse based cogeneration projects would require a new tariff structure
8What should it be?
Click on reports for more
Details
8What is the track record of inter-state generators for ramping up capacity as per new government guidelines?
8Poor, at best.
Click on Reports for more.
Details
8Power system stabilizer tuning is still a problem.
8And stakeholders are still grappling with it
Click on report for more
Details
8A very valid argument is being made to unshackle distribution companies from expensive long-term PPAs with old, inefficient plants.
8And India now needs to transition towards development of financial products in the derivative (or financial) electricity market that developers could utilise to hedge risk without requiring the signing of long-term PPAs for the financial closure of projects
Click on Reports for more
Details
For reference purposes the website carries here the following reports:
8What might be the economic Impact of a Global shift to EVs in Australia? Details
8Is It possible to make money on investing in Companies manufacturing Solar Components? 
Details
8Energy transitions will need more debt financing by companies and consumers 
Details
Click on Reports for more
Details
8Many emerging and developing economies do not yet have a clear vision or the supportive policy and regulatory environment that can drive rapid energy transitions
8The financial performance of utilities can also be a major constraint, as they underpin investment in networks and serve in many instances as the buyer of renewable output.
8An international catalyst is needed to boost clean energy investment in emerging and developing economies
Click on Reports for more
Details
8An average of Rs 2800 crore allowed as annual fixed charges for 2021-24 for 400 kV D/C Neemrana-Sikar Transmission Line
Click on Reports for more
Details
For reference purposes the website carries here the following tenders: 
8Tender for routine, breakdown, preventive maintenance and annual overhauling of Boiler auxiliaries Details
8Tender for work of Laying of 800 mtr XLPE cable Details
8Tender for ARC for C&I maintenance (CHP, Boiler and FOPH) Details
8Tender for Procurement of Heat Shrinkable Cable Joint Kits of Flexible Trailing cables Details
8Tender for manufacturing, testing and supply of power transformer Details
8Tender for Procurement, Erection & Commissioning of latest IGBT Technology based 2x60 KVA UPS Details
8Tender for AMC/ARC work for providing infrastructural support for mechanical & electrical operation and maintenance Details
8Tender for Overhauling/Servicing Contract of HPBP Hydraulic Actuators Details
8Tender for Supply of Energy Meter and CT/ PT Metering Set Details
8Tender for Replacement of boiler pressure parts tubes & bends Details
8Tender for Supply, erection and commissioning of battery bank and battery charger Details
8Tender for Supply, erection and commissioning of battery bank, battery charger and DCDB Details
8Notice inviting bids for sourcing of 50 Million MT of Coal Details
8Tender for reconductoring of 132kV transmission line Details
Click on tenders for more
For reference purposes the website carries here the following newsclips: 
8India can save fuel worth Rs 3.11 lakh crore till 2050; here's how Details
8NEW HIGHS on Adani Power share price! Stock rises 10% today - details HERE Details
8India’s Wind Power Sector Wants Rival Solar To Help Drive Growth Details
8Reliance Power to seek board nod to raise funds via equity issuance Details
8Developing nations need $1-trillion clean energy investment to reach carbon neutrality: IEA Details
8Moody's highlights negative credit impact of ESG risks on metals, mining and coal companies Details
8NLC India raises Rs 500 crore by issuing commercial paper Details
8Wind could produce affordable green hydrogen by 2030, Siemens Gamesa says Details
8EU and U.S. eye more collaboration on climate change, summit draft says Details
8GAIL to bid for solar foray with 400 MW capacity Details
8Soaring crucial metal prices to result in increased component, project costs: Analysts Details
8Renault aims to produce 400,000 vehicles a year at new electric hub Details
8Spanish EV charger maker Wallbox to go public in $1.5 billion New York SPAC deal Details
8Volkswagen invests $620 million in Northvolt to secure battery supply Details
8Greece to seek investors for 700 megawatt battery storage in autumn-minister Details
Click on newsclips for more
Details
8Two-part tariff could be challenged by both RE generators and by discoms as it would mean an increase in tariff
Click on reports for more
Details
8Phasing in renewable energy sources and phasing out conventional sources such as coal and natural gas rapidly could lead to instability in the electricity grid, potentially causing blackouts
So this has to be done gingerly, and here is a template for it.
Click on reports for more
Details
8India can become a true global superpower in the fight against climate change if it expedites its shift from fossil fuels to RE
8In India, 50 percent of coal production will become uncompetitive by 2022, reaching 85 percent by 2025
8If subsidies enhancing the competitiveness of coal production are phased out, this figure will be much higher.
8Investments in RE have the potential to create thrice as many jobs ascompared to investments in fossil fuels such as coal.
Click on reports for more
Details
For reference purposes the website carries here the following reports: 
8Kapco Electric Private Limited: Decline in scale of operations Details
8Alfanar Energy Private Limited: Company remains exposed to interest rate risk Details
Click on reports for more
Details
8The Collaboration will focus initially on large scale battery performance in India
8The collaboration will assist ReNew in optimizing its storage solutions
Click on reports for more
Details
For reference purposes the website carries here the following tenders: 
8Tender for Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of complete Chlorine di-oxide plant Details
8Tender for the work biennial maintenance contract for 220/400 kV Switchyard Details
8Tender for maintenance work (PM & BD) of CHP Details
8Tender for Erection, Testing & Commissioning work on High / Low Voltage electrical equipments Details
8Tender for balance electrical E&C Works of WT Details
8Tender for work of Minor overhauling of 23 MW STG Details
8Tender for Round the clock preventive maintenance, up-keeping servicing and breakdown maintenance of Bowl mills Details
8Tender for Round the clock running/ preventive/ breakdown maintenance of field instruments of Main plant Details
8Tender for Work of Round the clock shift maintenance of HT LT line system Details
8Tender for rewinding of 11/0.4 KV distribution transformers Details
8Tender for supply of different size of Al. wire Details
8Tender for supply, erection, testing & commissioning of plante type lead acid battery bank Details
8Tender for Work of Overhauling/repairing of 33KV Circuit Breakers Details
8Tender for work of establishment of 220kV Traction Substation switchyard Details
8Tender for the Procurement of the 33 kV & 22 kV CTs Details
Click on tenders for more
For reference purposes the website carries here the following newsclips: 
8Energy Efficiency Measures In India Saving Substantial Amount Of CO2 Emissions Details
8Tata Power shares hit 52-week high after CCI clears acquisition of stakes in 3 Odisha power utilities Details
8Raghuram Rajan moots global credit incentive fund to reduce carbon emissions Details
8Opinion: Second life of batteries Details
8U’khand HC notifies Centre, state on PIL seeking stay on Himalayan power projects with no safety nets Details
8U.S. must work with allies to secure electric vehicle metals -White House Details
8Tesla's China-made vehicle sales surge 29% in May - auto association Details
8ReNew Power joins hands with Precourt Institute for Energy Details
8OPINION: Ironing out policy hurdles for electric buses Details
8Power Grid Corporation acquires Sikar-II Aligarh Transmission Details
8Adani Enterprises incorporates manufacturing firm for wind turbine generators Details
8Green Energy firms plan to move Supreme Court to seek revision of endangered bird order Details
8Sustainibility: McCain India ups renewable energy use, lowers sodium content in products Details
8Gujarat tally of firms with $5bn-plus m-cap up 3 times since pandemic Details
8Global supply chain squeeze, soaring costs threaten solar energy boom Details
Click on newsclips for more
Details
8Tariff for Kankroli-Jodhpur Transmission Line (400 kV) along with associated bays revised through truing up process.
Click on Details for more
Details
8Tariff for line bays at Fatehpur 400/220 kV Sub-station (400 kV) along with associated bays revised through truing up process.
Click on Details for more
Details
For reference purposes the website carries here the following reports: 
8Transitioning to a net zero economy would require investment flows to be geared towards mass deployment of green electricity and electricity storage: A report
8Why the Energy Industry needs to build its own carbon offset exchange to get to Net Zero? Details
8Can Rooftop Solar come out of Ground Mount’s shadow and be the next big thing? Details
8Gujarat State Petronet Limited: Lower-than-expected gas demand from power due to spike in LNG prices Details
8Business opportunity in Coal mining projects Details
8Business opportunity in Captive power projects Details
Click on reports for more
Details
8Tariff for Ranganadi Hydro Electric Project (405 MW) revised through truing up process, allowing for the following fixed cost.
8Click on Details for more
Details
As India builds new import and distribution infrastructure for gas, is there the threat of a second phase of redundancy as energy economics transform.
8The first phase happened when gas-based power capacity became redundant.
Click on Details for more Details
Here is a counter-argument to gas that is gaining ground that we cannot ignore beyond a point as our policy makers talk of transiting into a gas-dependent world. For, gas advocates have long argued that gas can serve as a “bridge fuel” until renewable energy can be developed at a larger scale.
8Today, this idea is obsolete for three reasons.
8First, the climate crisis is now urgent: remaining atmospheric space is so limited that there is no room for any additional fossil fuels.
8Second, since wind, solar, and energy storage and other supporting technologies have fallen rapidly in cost and are deployable at a large scale, there is no longer a need for a bridge. Third, recent findings on the extent of methane leakage from gas infrastructure undermine claims of environmental benefits over other fossil fuels.
8Furthermore, now that renewables are competitive, additional gas tends to displace renewable energy as well as coal.
8Gas starts to look more like a wall than a bridge, impeding rather than enabling the energy transition.
8There is more heft in these arguments now more than ever before, and it is always good to listen to the other side carefully.
Click on Reports for more on a very extensive study that calls out all advocates of gas.   Details
 < 1 2 3 4 > 

Showing 101–150 of 181 items