All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


Jun 2021

8RFQs for the civil, architectural, and design, supply, installation, testing, and commissioning of FGD units are likely to be floated in Q1 2022.
Click here for more details
Details
8RFQs for design, supply, erection, installation, testing, and commissioning of WFGD are likely to be floated in Q1 2022.
Click here for more details
Details
8RFQ for the CW system and switchyard package for all units is likely to be floated in Q4 2021.
Click here for more details
Details
For reference purposes the website carries here the following reports:
8OPG Power Ventures: power generation declined to 2.11bn units Details
8Sai Regency Power Corporation Private Limited: Non-Cooperating category for rating agency Details
8New ERA Enviro Ventures Pvt. Ltd:  Rating withdrawn Details
Click on reports for more Details
8NTPC has indicated not to take up any Greenfield coal-based power projects and would go for brownfield only if there is enough demand
8A majority of private players have already indicated that they will not add any incremental coal power plants.
8Only some state government and central PSUs are presently undertaking the execution of coal projects
Click on reports for more
Details
8Bids are invited for EPC contract for 50 MW Floating Solar PV Power Project
8Also including O&M of the Plant for 10 years
8Know more about date details and contacts
Click on reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for AMC for the work of repairing, overhauling & servicing of various type of Air Compressors Details
8Tender for procurement of spares and complete assembly to be used in Ash Handling System Details
8Tender for work of overhauling of Coal Burner Details
8Tender for Bi-Annual Rate Contract for operation and maintenance of Air Washery System Details
8Tender for work of Overhauling of Boiler Pressure & Non Pressure parts Details
8Tender for work of interconnection between 22kV indoor & outdoor bus Details
8Tender for Design, Manufacturing and Supply of 96 Core Optical Guard Wire (OPGW) and accessories Details
8Tender for Work of Online, routine, preventive, breakdown, AOH & COH maintenance of Ash Handling Plant silo system Details
8Tender for the Procurement of 530 Km ACSR Dog Details
8Tender for Design, Manufacture, Testing & Delivery of 1,60,000 Nos. HT Guy Strain Insulators Details
8Tender for inspection and rectification work of coal bunker conical portions Details
8Tender for Maintenance of Railway track of railway siding Details
8Tender for Procurement of grinding element for Coal Mill XRP 1003 Details
8Tender for Rate Contract of Repair & Maintenance Jobs and Operation (Mech, Elect & C&I) and Removal of Technological Waste & Up-keepment of CHP Details
8Design, Engineering, Manufacture, Testing at Works, Supply, testing and commissioning of 220KV Switchyard Equipment Details
8Tender for Repair/ Refurbishment of 05 Nos Eroded 30X Francis Runners Details
8Tender for work of Protection of exposed portion of Silt Flushing Tunnel (SFT) cut & cover Details
Click on tenders for more
For reference purposes the website carries here the following newsclips:
8Administrative hurdles delay annual revision of power tariffs in Delhi Details
8Electricity derivatives are set to transform India's power sector Details
8Green hydrogen purchase to be mandatory for some sectors: R K Singh Details
8Actis to buy Fortum’ 500 MW solar projects for Euro 280 million Details
8Gujarat announces EV policy; to give up to Rs 1.5 lakh subsidy on electric cars Details
8Government, industry need to ensure regulations don't hamper investment: Power Secretary Alok Kumar Details
8Tamil Nadu minister says squirrels running on power cables led to outages, gets trolled Details
8Falling renewables costs undercut new and some existing coal plants - study Details
8GE Power India posts 8 per cent rise in March quarter profit to Rs 16 crore Details
Click on Newsclips for more
Details
8The waiver of Inter- State transmission system (ISTS) charges has been allowed for Hydro Pumped Storage Plant (PSP) and Battery Energy Storage System (BESS) projects
8This will promote the Hydro PSP and BESS projects for meet the balancing requirement of the grid caused due to large scale integration of Renewables in the Electricity Grid
Click on reports for more
Details
8Investment in renewable energy and growing power demand would continue to drive the need for transmission works
8India’s vision to reach 450GW of RE capacity by CY30 would necessitate incremental investments of INR2.8t within transmission
Click on reports for more
Details
8IFB for EPC package to install a Waste to Energy Plant is coming up
8Including Two year Operation and Maintenance works on turnkey basis
8The plant shall be designed in modular/unit wise fashion
8The Plant including Waste Segregation & Torrefaction must be designed to dispose off the 600 + 33% TPD of MSW
Click on reports for more
Details
Project Name: Sagardighi Thermal Power Station - FGD Addition Project
8Project Cost: Rs 303.0 Crores
8RFQ for the civil and architectural work at the same sites is likely to be floated in Q3 2021. RFQs for the supply, erection, installation, testing and commissioning of the FGD units are likely to be floated in Q1 2021
Click here for more details
Guru Hargobind Thermal Power Plant - Installation of FGD
8Project Cost: Rs 460.00 Crores
8RFQs for design, supply, erection, installation, testing, and commissioning of FGD are likely to be floated in Q4 2021.
Click here for more details
Project Name: Guru Hargobind Thermal Power Plant - Installation of FGD
8Project Cost: 460.00 Crores
8RFQs for the civil, architectural, and design, supply, installation, testing, and commissioning of FGD units are likely to be floated in Q1 2022.
Click here for more details. Details
8Bids are invited for the EPC package for setting up 250 MWp Floating solar PV power project
8Also including O&M of the Plant for 10 years
Click on reports for more
Details
8PWGR’s order book has declined to INR410b at the end of FY21
8A declining order book and capitalization schedule could result in a growth slowdown
Click on reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for the procurement of 33 KV & 11 KV Lightening Arrestor Details
8Tender for work of height extension at various locations of 220 kV D/C Line Details
8Tender for the Supply of collecting electrodes for ESP Details
8Tender for work of AMC servicing & overhauling of 33kV & 11kV circuit breakers Details
8Tender for Supply of compressor end and turbine end hollow shaft Details
8Tender for the works for Online PD testing of 400KV XLPE cable joints and termination bushing Details
8Tender for the work of SITC of cooling towers Details
8Tender for the work of repair & HP-HVOF coating of guide Vanes Details
8Tender for the Procurement of 220/66kV Power transformers Details
8Tender for Job Contract for Maintenance & Repair of Conveyor Belts in CHP Details
8Tender for Annual Maintenance Contract for work of repairing, overhauling, servicing and alignment of various Isolators Details
8Tender for work of replacement of existing old Damaged/Broken 0.2 ACSR Panther conductor by new 0.2 ACSR Panther conductor Details
8Tender for the work of Overhauling of ESP Details
8Tender for Supply, erection, testing & commissioning of DC Float Cum Boost Charger Details
8Tender for the Supply of Geared motor Details
8Tender for supply of Various sizes of Bearings Details
Click on tenders for more
For reference purposes the website carries here the following newsclips:
8India's NTPC plans no coal imports again in 2021-22 Details
8NTPC doubles 2032 renewables target to 60 GW Details
8Sri Lanka To Purchase 75% Equipment from India For India-funded Projects Details
8Power ministry extends timeline for transmission charges waiver for RE Details
8High-flying battery makers have much to win and lose: S&P Global Ratings Details
8Premier Energies starts production of solar cells at new plant Details
8JinkoSolar subsidiary to invest RMB 315 million in Polysilicon production project Details
8Volvo, Northvolt team up for electric battery factory Details
8Overseas participants on Indian power exchanges to rise soon Details
8Karnataka: Costly fuel pushes up demand for more EV charging stations on highways Details
8India EV sales to grow at 26 per cent by FY23: Fitch Details
Click on newsclips for more
Details
8RFQs for the EPC package for the installation of FGD is likely to be floated in Q2 2022.
Click here for more details
Details
8RFQ for the ash handling plant and chimney package is likely to be floated in Q3 2021.
Click here for more details Details
8Contract for handling of Coal Wagons, Oil Tankers & Allied work in CHP
8Rectification work of Top Tadpole at Ash Handling Plant
8Know more about the supply/procurement of materials/equipments for this
Click on reports for more
Details
For reference purposes the website carries here the following Reports:
8Coal India Ltd: Higher than expected off take can lead to better than expected financial performance Details
8What are the world’s major energy challenges? Details
8What policies can be implemented to address the world’s energy challenges? Details
8Sungaze Power Private Limited: Tariff competitiveness remains exposed to levy of additional surcharge in future years Details
Click on reports for more
Details
8Captive Power Plant- 87 MW
8Based on WHRB- 108MW
8Based on Coal and Dolochar mix- 45MW
Click on reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for supply, installation & commissioning of continuous ambient air quality monitoring system Details
8Tender for Routine/Preventive/Breakdown maintenance work of C&I field instruments installed of boiler side and its auxiliaries Details
8Tender for Annual work contract for round the clock running, preventive & breakdown maintenance of MAX DNA DCS Details
8Tender for annual routine maintenance of Electro-Mechanical and Hydro Mechanical equipment Details
8Tender for Annual/Capital maintenance of machine of power house Details
8Tender for Design, Supply, Installation, Testing, Commissioning, Reading, Analysis and 8 year O&M of Static Intelligent Energy Meter Details
8Tender for the Long term maintenance contract for C&I Details
8Tender for Supply, Erection, Testing and Commissioning of 48 volt Battery set for switchyard Details
8Tender for Procurement of Forged Ring Hammer for Ring Granulator Details
8Tender for design, fabrication and supply of double tube type shell Details
8Tender for Annual rate contract for maintenance work of various 132kV, 220kV EHV Substations Details
8Tender for Work of providing & fixing of Winding Temperature Indicator/ Oil Temperature Indicator Details
8Tender for Work of street lightning & 400kV switchyard lightning Details
8Tender for AMC for breakdown and planned outage on bi-pole HVDC line Details
8Tender for procurement of different types of measuring instruments Details
8Tender for work of AMC of Milling System Details
Click on tenders for more
For reference purposes the website carries here the following newsclips:
8Increased incentives for electric 2-wheelers will help India meet targets faster Details
8Power load: Smart AC in works for post-Covid era Details
8Ikea, Rockefeller to donate $1 bn for clean energy in developing nations Details
8India may open derivatives market for power sector next financial year Details
8Adani Power to acquire 1,200 MW Essar Power's Mahan project Details
8Vedanta emerges as successful bidder for coal block for mining in Odisha Details
8GMR Infra Q4 loss lowers to Rs 725 crore; gross revenue at Rs 2,321 Cr Details
8Repowering India’s top wind sites could add 30 GW of capacity Details
8Australia rejects $36 billion wind, solar, hydrogen energy project Details
8Despite SC order, work on laying overhead power lines ‘continues’ in GIB habitats Details
8Companies line up affordable electric bikes post FAME II subsidy hike Details
8Ensure staff to clear power bills to get salary: APDCL to Assam govt Details
8India may open derivatives market for power sector next fiscal Details
8Europe powers up electric car battery drive Details
8NTPC Barauni unit 9 all set to generate 250 MW more power Details
8BEE to prepare action plan to meet commitments in Paris Agreement Details
8Coal to remain vital source for power generation for at least 20 yrs: Minister Pralhad Joshi Details
Click on newsclips for more
Details
8India is all set to host a two day summit on Green Hydrogen initiatives involving the BRICS nations
8The event offers a platform to share their respective Green Hydrogen initiatives and views on how to take it to the next level in their own countries.
8The summit will bring the best brains, policy makers and major stakeholders from the BRICS nations deliberating and discussing at length the future of Hydrogen in the energy mix
8The event will be anchored by NTPC Ltd
Click on reports for more
Details
The government has evolved an interesting system of addressing public grievances about local content adherence in purchase preferences by power companies.
8The complainant will have to pay up 1% of the value of the local content or a minimum of Rs 2 lakh along with his complaint, and if the complaint is found to be incorrect, then the money will be forfeited.
8Or else returned.
Click on Reports for more Details
This is a  Rs 12778 crore hydel project
8And what we have here is a future Request for Quotation
8RFQ for the EOT crane package is likely to be floated in Q4 2021
Click here for more details Details
This is a big Rs 4949.24 crore hydroelectric project
8RFQs for transformer and HVAC transmission line works are likely to be floated in Q1 2022
Click on Details for more
Click here for more details Details
8EOI for OEM Empanelment for Supply of Electric two-wheeler Vehicles
8Know more about date details and contacts
Click on reports for more
Details
8POWERGRID has posted total Income of Rs 40,824 crore and Profit After Tax of Rs 12,036 crore on consolidated basis
8In Q4 2021, the Total Income and Profit After Tax on consolidated basis are Rs 10,816 crore and Rs 3,526 crore respectively
8During FY 2020-21, the company incurred a capital expenditure of Rs 11,284 crore and capitalized assets worth Rs 21,467 crore
Click on reports for more
Details
8Indian resources and technologies are still lagging far behind when compared to other developed countries.
8In most of the advanced countries, Utilities have made major achievements in terms of productivity, reliability, and efficiency
 through the utilization of Smart Grid technology
8So the utilities will get to invest heavily in new hardware, software, business process development, and staff training.
8It would help the country to achieve bigger goals in the upcoming years
Click on reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for procurement of 33kV potential transformers Details
8Tender for ARC for chemical supply and service on turnkey basis for Cooling Water Treatment Details
8Tender for overhauling of boiler pressure parts Details
8Tender for supply of bladders for hydraulic accumulators of control fluid system Details
8Tender for the Procurement of spares of the LT & CT Gearboxes Details
8Tender for Biennial Rate Contract for Electrical maintenance Details
8Tender for Annual Rate Contract for Different Type Of Maintenance Jobs Details
8Tender for Procurement, Erection and Commissioning of 415V E6A Panel with ACBs Details
8Tender for the work of Diversion of existing 11 KV OH line Details
8Tender for procurement of 245kV current transformer Details
8Tender for supply of special type of 400kV current transformer Details
8Tender for the Procurement of Spares for Apron Feeder Details
8Tender for Rate contract for Electrical and C&I Routine, Preventive & Breakdown maintenance activities for CHP Details
8Tender for Supply of Coal Compartment Assemblies for Boiler Details
8Tender for the work of online preventive & breakdown maintenance for Boiler rotary parts Details
Click on tenders for more
For reference purposes the website carries here the following newsclips:
8From RPOs to PDOs: Time to think of Power Decarbonisation Obligations for discoms Details
8Coal India gives go-ahead to domestic firm for coal bed methane extraction Details
8Electrification of 19 Siachen villages to help Ladakh achieve carbon-neutrality target, says officials Details
8New plan worth Rs 20,000 cr to solarise agricultural feeders: R K Singh Details
8Andhra Pradesh high court cancels APGECL’s solar power plant tenders Details
8It’s too early to focus on electric cars only: Toyota Details
8EVs with green plates get more common on Ahmedabad roads Details
8CIL contemplating to hike coal price Details
Click on newsclips for more
Details
The government has evolved an interesting system of addressing public grievances about local content adherence in purchase preferences by power companies.
8The complainant will have to pay up 1% of the value of the local content or a minimum of Rs 2 lakh along with his complaint, and if the complaint is found to be incorrect, then the money will be forfeited.
8Or else returned.
Click on Reports for more Details
8Shirdi Sai Electricals is a power transformer manufacturer as well as a turnkey contractor, and it seems to be doing well, going by an assessment made by a rating agency.
8Ratings however have been withdrawn for Vijay Transformers and SVR Electricals as they refused to cooperate with the rating agency
Click on Reports for more Details
Carbon emission is one problem that the globe faces
8But intensity of carbon emission industry-wise is another more important issue
8Here is a great analysis covering intensity, both industry as well as company wise
 Click on Reports for more Details
8This is one company that has diversified out of the power T&D business and into other technology-enabled businesses
8And done well
Find out more
Details
How much could Maharashtra gain out of the energy transition business
8A lot of money, according to this analysis
8Get a detailed preview here
Click on Reports for more
Details
Petitioner attempt to clear deviations for medium-term power purchase from the standard bidding document can set the cat among the pigeons.
8These are power stations set up on Finance, Own and Operate basis.
8And the petitioner is getting a patient hearing
Click on Reports for more
Details
8For lithium cell manufacturing, it is targeting 8-10GW capacity to attain global competitiveness
8This would entail investments of USD0.8-1 billion over 5-10 years
8It can fund this capex through free cash flows of the core business and debt
Click on Reports for more
Details
8There is still another hydel project, worth Rs 1700 crore for which we have a comprehensive update
8Here too what we know is that RFQ for the electro-mechanical package is likely to be floated in Q1 2022.
Click here for more details for full project details Details
It is a Rs 5000 crore hydel project
8And get all the details on the project here
8RFQ for the civil works package -1 is likely to be floated in Q2 2022.
Click here for more details for full project parameters as also key contacts Details
There is another Rs 3000 crore hydel project
8Here too RFQ for the civil works package -1 is likely to be floated in Q2 2022.
Click here for more details to get into our comprehensive project monitoring software for all hydel projects. Details
8EOI for setting Up Standalone Fuel-Cell based Backup power system with hydrogen production
8Also for setting Up Standalone Fuel-Cell based Micro-grid with hydrogen production using electrolyser
Click on Reports for more
Details
8An average of Rs 24.75 crore allowed as annual fixed charges for 2021-24 for 400 kV transmission line associated with HEP
Click on Reports for more
Details
8During Q4FY21, order inflow came in at Rs 4375 crore, down 31.7% YoY.
8For FY21, order inflows declined 42.8% YoY to Rs 13472 crore.
8Few Power projects are getting deferred for awarding/tendering thereby impacting overall visibility
Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for maintenance contract for ESP & electrical maintenance work of entire Ash Handling Plant Details
8Tender for the work contract for replacement of existing Old C&R panels by New BCU based C&R panels Details
8Tender for design, supply, erection & commissioning of dust suppression system Details
8Tender for overhauling contract of duct system of boilers Details
8Tender for annual maintenance contract for breakdown and planned outage on 400kV lines Details
8Tender for the Work of testing of EHV Grade transformer oil Details
8Tender for the supply of DPC Aluminium Conductors and strips for the repair of faulty transformers Details
8Tender for Supply of LV Bushings Assembly 24KV, 10000A for Generator Transformers Details
8Tender for Engineering, supply, erection, testing and commissioning of 110kV AIS SS along with LILO of 110kV OH Lines Details
8Tender for work of Converting Single Bus to Double bus bar Details
8Tender for Procurement of 132 KV Lightening Arrestor Details
8Tender for AMC of ash dyke pond Details
8Tender for ARC for unloading of coal and oil rakes of CHP Details
8Tender for Supply, retrofitting and commissioning of Air Circuit Breakers Details
8Tender for Maintenance Contract for Electrical Maintenance jobs Details
Click on tenders for more
For reference purposes the website carries here the following newsclips:
8Rising solar PV module prices near term headwind: ICRA Details
8Power ministry disagrees with coal ministry's proposal to offer coal through e-auction to all sectors Details
8India’s renewable energy sector requires over $500-bn investments in next decade: Experts Details
8Gujarat: Waste-to-energy plant to be ready in Ahmedabad by end of the year Details
8Sterlite Power secures INR 580 crore funding from REC for Udupi Kasargode Transmission Project Details
8For a greener, cleaner future Details
8Foreign investors keen on funding Indian renewable projects: Scatec Details
8GE Renewable Energy to set up 148.5 MW wind capacity for Continuum Green Energy Details
8GM, Ford outdo each other with electric vehicle investments Details
811 thermal plants in NCR accounted for 7% of Delhi air pollution in Oct-Jan: Study Details
Click on newsclips for more
Details
Run of River Schemes are now going out of fashion
8This is what this particular unit is arguing, while asking for a slew of concessions
 Click on Details for more 
Details
Greenfield Super Thermal Power Project
8Project Cost: Rs 12778 Crores
8Project Event: RFQ for the BOP package-2 is likely to be floated in Q4 2021
Click here for more details Details
FGD Addition
8Project Cost: Rs 215.00 Crores
8Project Description: The SEB has planned for the installation of a flue gas desulphurization system in the 500 MW (2x250 MW) Sikka TPS in the Jamnagar district of Gujarat. Funds for the FGD project were sanctioned by the state government.
 Earlier the contract was canceled due to some unavoidable circumstances. Re-tender was floated on EPC basis for supply, installation, commissioning, and testing of the FGD system for units - 3 and 4 2x250 MW) with a comprehensive operation and maintenance contract. Bidding is in progress for the same. Tender is likely to be awarded in the first half of Q4 2021. 
Click here for more details
Details
8An average of Rs 50 crore allowed as annual fixed charges for 2021-23 for 400 kV D/C Gorakhpur-Lucknow transmission line
8But for 2023-24, only Rs 33 crore has been allowed
Click on Reports for more
Details
8Change of law costs allowed for Levy of Swachha Bharat Cess and Krishi Kalyan Cess
8 Also allowed Increase in effective customs duty on primary aluminium products
8Further allowed Increase in compensation towards damages for transmission lines
8But Carrying Cost has been disallowed
Click on Reports for more
Details
8PFC’s net worth for FY 21 is up by 16% to Rs 52393 cr. and has crossed the fifty thousand mark
8PFC records highest ever net profit of Rs 8444 cr for FY 21, up 49% on year on year (Y-o-Y) basis
Click on reports for more
Details
8The recent surge in COVID-19 cases across the country has pushed several states under curfews and lockdowns,
8Which is expected to result in project commissioning delays for solar projects
8If the government grants solar developers another three-to four-month extension, an estimated 4GW of solar and wind projects with planned commissioning in 2021 will be delayed
8And It will be expected to get commissioned in 2022
Click on reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for Routine & breakdown maintenance of coal mill reject system Details
8Tender for procurement of 11/3.3/1.1 KV Grade Power/Control Cables Details
8Tender for Supply of 390 KV 10 KA O/D Lightning Arrestors Details
8Tender for Supply of Conventional Inner Cone for coal mill Details
8Tender for Annual Rate Contract for maintenance of lightning system Details
8Tender for Procurement of Cast Resin Dry Type Transformer Details
8Tender for manufacture, testing, supply and delivery of SCADA Compatible 11 KV Outdoor Non-extensible 4 Way RMU Details
8Tender for supply and installation of high voltage distribution system (HVDS) Details
8Tender for the Service contract for overhauling of boiler pressure parts Details
8Tender for Procurement, Installation & Commissioning of 25 Meter LED Based High Mast with Luminaries Details
8Tender for supply and installation of high voltage distribution system Details
8Tender for Supply of Power Supply Boards for Direct Current Measuring Device Details
8Tender for work of Supply & replacement of 110kV Isolators Details
8Tender for the work of arresting oil leakages from various joints of ICT’s and Transformers Details
Click on tenders for more
For reference purposes the website carries here the following newsclips:
8Ashok Leyland arm fully acquires EV maker Switch Mobility Automotive Details
8Assam will try to replicate Gujarat model in power sector: CM Details
8Tata Power has a CapEx of Rs 7,000 for this year: Praveer Sinha, CEO & MD Details
8Coal India to reduce manpower by 5% every year over next 5-10 years Details
8Sembcorp on prowl for renewable projects acquisitions in India Details
8GM to supply electric batteries, hydrogen fuel cell systems for Wabtec locomotive Details
8Ford-backed battery maker Solid Power to go public via $1.2 billion SPAC deal Details
8JLR developing prototype hydrogen fuel cell electric vehicle based on Land Rover Defender Details
8Volkswagen seeks partners for battery materials race Details
8Thermal power plants performance set to improve; Excess capacity could decline over FY22-FY24 Details
8Siemens to supply digitalised switchgear to 3 steel makers Details
Click on newsclips for more
Details
 < 1 2 3 4 > 

Showing 51–100 of 181 items