Jun 2019

For reference purposes the website carries here the following tenders: 
8Tender for Supply of 600KVA, 11KV/415V LT Unit Auxiliary Transformer Details
8Tender for procurement of grinding balls for ball & tube mills Details
8Tender for routine preventive/breakdown maintenance of electrical equipment Details
8Tender for Supply of 110V /120AH battery Details
8Tender for Procurement of Bucket for Stacker Cum Re-claimer Machine Details
8Tender for Procurement of spares for High Pressure Valve of Boiler Details
8Tender for Supply of 110V/24A battery charger Details
8Supply of 11kV Pole Mounted Fast Acting Single Phase Smart Reclosers Details
8Tender for Round the clock Preventive / Routine maintenance of 20 nos. XRP 1003 Bowl Mills Details
8Tender for Supply of Stay Rod 20mm Dia GI (HT Stay Rod) Details
8Tender for Supply of I/D and O/D AC D.B. Details
8Tender for evacuation of ash from ash ponds of TPS Details
8Tender for Work of Annual Maintenance contract for attending preventive as well as emergency work of 220kV & 132kV EHV Transmission Lines Details
8Tender for replacement of 400kV pantograph bus isolators Details
8Tender for the Work of attending to resolving the Fuse-Off-Call Complaints & LT/HT line Breakdowns Details
You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips:
8Power Grid board meet next week to consider raising up to Rs 10,000 cr Details
8SECI floats new tender for 1,800 MW wind power projects in FY20 Details
8Coal imports: Directorate of Revenue Intelligence asks CBI to probe two Reliance ADAG firms Details
8NMDC terminates contract with BHEL for delay in Rs 1,395 cr project Details
8To become a global leader in renewable energy India needs to update its climate targets Details
8EV push may leave no tanks to fill at CNG pumps, burn gas companies Details
837,700 Mw power plants left with 1-5 days of coal stock Details
8Britain adopts 2050 net zero emissions target Details
8ENGIE's India renewable energy capacity now exceeds 1,500 MW Details
8World trade panel sides with India vs US in renewables tiff Details
8AISIA for raising export sops for solar module manufacturers Details
8Rajasthan: Wind power firms left in the lurch Details
8Jagan Mohan Reddy defies centre; to review green PPAs Details
8ReNew mops Rs 2,100 crore through rights issue to expand capacity Details
8Spot power prices dropped 29 per cent last month on higher coal inventory Details
8SJVN and NEEPCO sign pact to jointly explore projects Details
8Surplus power can help set up roadmap for industrialisation: Experts Details
8BSES partners TERI, Panasonic, CEEW for Demand Side Management Details
8Agra: Farmers protest against proposed hike in power tariff by UPERC Details
You can also click on Newsclips for more
Details
For reference purposes the website carries here the following reports: 
8Renewable energy in Bangladesh: Can there by an opportunity there for India? Details
8Renewal energy has two faces: One where companies are drowning in debt and receivables, another where massive capacities are being added by big and aggressive companies. Details
8Global nuclear power plants forecast up to 2050: A report
8Global energy transformation: A roadmap to 2050 Details
8Coal import by public sector TPP based on domestic coal will go down to zero. What is the raod map? Details
8Solex Energy Ltd: Growing quickly. Details
8Renewable energy and energy efficiency, coupled with deep electrification of end-users, could provide over 90% of the required reduction in energy related CO2 emissions.: An analysis Details
8India's plan to make use of nuclear wastes: Know more
You can also click on reports for more Details
For reference purposes the website carries here the following tenders: 
8Tender for Work contract for round the clock Complete Operation and Maintenance of Ash Handling System & its auxiliaries Details
8Tender for Biennial Rate Contract for collecting, loading transporting & unloading of reject coal from bowl mill area and R.C. Feeder Details
8Tender for Procurement of Conveyor belt textile-steel cord for coal handling plant Details
8Tender for Overhauling Work of ESP of TPP Details
8Tender for Procurement of Critical Spares of Gear Box of Coal Mill Details
8Tender for Supply, Erection, Testing and commissioning of220 V DC Battery set along with charger Details
8Design, Engineering, Manufacture, Supply, Erection, Testing and Commissioning of Generator Transformer Details
8Tender for Breakdown Maintenance work of Milling System Details
8Tender for Arrangement/shifting of 132/33kV Substation Details
8Tender for Repairing of 4Nos 132/33 KV Power Transformer at different sub-stations Details
8Tender for Procurement of FRP Blade Assembly ,Drive Shaft Assembly, Performance testing for CT Fan of Cooling Tower Details
8Tender for supply of Air pre-heater tubes Details
8Tender for Attending preventive maintenance and breakdown works etc. in air compressors Details
8Tender for Breakdown, preventive maintenance work in feed water system and its connected equipments Details
8Tender for the Supply of flue gas analyzer Details
8Tender for supply of bearing oil coolers Details
You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips:
8Power tariffs: Regulators delay new orders amid rising discom stress Details
8Rajasthan govt decides against divesting 2 power plants Details
8Falling LNG prices to revive prospects of stressed power units Details
8NTPC-Power Grid JV likely to be distribution sector operator Details
8Centre for N-plants in Punjab Details
8Domestic consumers to bear brunt as Kerala plans power tariff hike Details
8Chandigarh residents can now install solar plants till September 30 Details
8Ducon inks pact with Sterling & Wilson to bid for large FGD projects in India Details
8Fortum inks pact with Hindalco for NOx reduction at Mahan power plant Details
8Madhya Pradesh govt to bring e-vehicle policy soon Details
8G20 Summit: Indian banks 'invest' Rs 79,800 cr a year in coal Details
8Want to make Delhi e-vehicle capital: Gahlot Details
8Delhi govt announces pilot project for using electric vehicles for delivering online orders Details
8Madras HC: Can’t stop Tamil Nadu-Chhattisgarh power transmission project Details
8Slow pace of reforms spurring higher coal imports by Indian utilities Details
8Bombay HC disposes of 9-yr-old PIL against Adani’s mines near Tadoba Details
You can also click on Newsclips for more
Details
8Business opportunity in renewable energy: Indian Railways has plans to set up 500 MW of Land based Solar plants, including those on its unused land Details
8ABB has yet again come out with a unique solar solution that provides a clean and independent power supply Details
8Prolonged outage of power system elements (Thermal Generating, Hydro Generating & Transmission elements): An update: What happens then? Details
8Generator shutdown data for July 2019: An update Details
8Good going for Ecoren Energy India: Company has orders a pipeline of 525 MW of solar powers  Details
8Latest status of state ATC/TTC declared for the month of September 2019 Details
You can click on Reports for more Details
8An investment of around Rs 2.6 trillion is required in the transmission sector alone to meet the future peak load, which is expected to reach 234 GW by 2021-22
8The private sector is expected to play an important role in achieving the country's grid expansion targets as competitive bidding gains momentum at both the interstate and intrastate levels
8The competitive bidding process for interstate projects has resulted in the discovery of low tariffs and the faster execution of projects
8A key challenge in rolling out a robust transmission infrastructure is financing.
8The sector is expected to immensely benefit from major policy and regulatory reforms such as amendments to the electricity cct and the tariff policy.
You can click on Reports for more Details
8India has planned the use of large deposits of thorium available in the country as a long-term option.
8A three-stage nuclear power programme has been chalked out
8Will this work?
You can click on Reports for more Details
Project Name: Pumped Storage Hydro Power Greenfield Project
8Project Cost: Rs 6922 crore
8Project Description: The owner's 1000 MW (4x250 MW) greenfield pumped-storage project is held-up at the forest clearance (Stage-II) as it involved the diversion of 234 ha of forest land. But Compensatory Afforestation land of 234.0 ha has already been arranged. The process is on for obtaining EAP Loan assistance from Japan International Cooperation Agency .This project has obtained the requisite environment clearances and forest clearances
8
Project Event: RFQ for a project management consultancy services is expected by September 2019.
8Expenditure Approval: Q3:2019
8RFQ Date: Q3:Sept2019
8Release Date:Q3:Sept2019
8Start Date: 2020
8Completion Date: 2024
Click here for more details Details
8According to NITI Aayog study, the consumption of 8 to 10 LPG cylinders per year is equivalent to electricity consumption of nearly 4 units per day.
8Electricity-based cooking has the potential to reduce country’s import dependency for energy
8Is this going to be a new trend?
You can also click on Reports for more Details
8For 1.5 LMT coal from mine to TPS
8Loading of 0.6 LMT coal from Mine to TPS
8Transportation of 3,60,000 MT coal from stock and unloading the coal at siding for TPS
8Transportation of 85000 tonne coal by mechanical means from coal dump to diding
You can also click on Reports for more Details
8India has seen several cases of under contracting in renewal energy, and this was partly due to an attempt to beat down bidders after the auction in an effort to further reduce tariffs.
8A awarding mechanism, for example, whereby bidders could advance only if they were willing to match the lowest bidder, discouraged several winners, who decided not to build their projects because they were not economically feasible at the lowest price.
8This issue continues to be a problem in India, as policy makers have sought ever-more-competitive solar power contracts, leading them to set excessively low prices incommensurate with developers’ costs and the risks assumed.
You can also click on Reports for more Details
8It is not going well for GE Triveni Limited: Rating placed on watch with negative implications Details
8TBEA Energy (India) Pvt Ltd: The company has provisionally achieved a revenue of Rs. 1051.63 crore for FY19. Details
8Electric Vehicle into the grid: Battery degradation and ancillary services Details
8Thermal power stations: An analysis of the critical coal stock situation Details
You can also click on Reports for more Details
For reference purposes the website carries here the following tenders: 
8Supply, Erection, Testing & Commissioning of 5 MVA, 66/11 kV Transformer Details
8Supply, Installation, Testing and Commissioning of 02 Nos. of 110V DC, 1100AH or higher capacity Tubular Lead Acid Battery Bank Details
8Tender for Purchase of Slip Rings/Collector Assembly & Brush Gear Support Assembly Details
8Supply of 1000 KVA, 11/0.415 kV cast resign dry type transformer Details
8Tender for Supply of 1.1kV XLPE Cable Details
8Design, Engineering & Supply of 220kV and 132kV Current Transformers Details
8Tender for Procurement of Hydraulic Motor for Bucket Wheel Of Stacker Reclaimer in CHP Details
8Tender for Dismantling of 220/132 KV Power Transformer Details
8Tender for balance work of dry ash evacuation system Details
8Tender for supply of Economiser 83 Nos. top bank coil Details
8Tender for supply of 06 Nos. of refrigerant type hydrogen gas drier Details
8Tender for the Supply of Coal valve Details
8Tender for the Supply of 1800mm Width Nylon/Nylon Conveyor Belt for ICHS Details
8Tender for the Supply of Nylon/Nylon conveyor belt Details
8Tender for Breakdown Maintenance work of Milling System Details
8Annual Rate Contract for procurement of 4820 MT of Sulphuric Acid Details
8Tender for supply of Economiser 143 Nos. bottom bank coil Details
8Tender for Biennial Maintenance Contract for Coal Mill & Auxiliaries Details
8Annual maintenance contract of Generator Transformers Details
8Tender for supply of 33 kV Current Transformers Details
You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips:
8New tender for 2GW solar power equipment factories issued Details
8Uttar Pradesh plans to commission 1500 MW solar projects by next year Details
8India plans to add 500 GW renewable energy by 2030: Government Details
8Adani Power to acquire GMR Chhattisgarh Energy Details
8ICRA lowers Sasan Power rating citing deteriorating risk profile; company disagrees Details
8Asia's coal developers feeling left out by cold shoulder from banks Details
8Canada, US gain as India cuts dependence on Australian coking coal Details
8NTPC bags 40 MW solar projects in UPNEDA's auction Details
8Budget 2019: Solar industry body seeks raising export incentives to 10 per cent Details
8Cleanmax Solar to invest Rs 600 crore to set up solar farm in Haryana Details
8Government to float tender for gravity storage; foreign firms keen on prospects Details
8Singaji stn produces costliest power in MPSingaji stn produces costliest power in MP Details
8India to add 131.31 GW power generation capacity till 2022 Details
8Solar and wind to power 21 per cent of data centres’ electricity demand by 2025 Details
You can also click on Newsclips for more
Details
Project Name: Thermal Power Station - Dismantling Project
8Project Cost: 90Crores
8Project Description: The owner is planning to retire and dismantle the Units 1,2,3 and 4 (50 MW each) in the 440 MW (4x50 + 2x120 MW) thermal power.The Units 1, 2 and 4 have been shut since July 2017. Unit-3 is running with frequent outages. Approval from CEA has been obtained. Moreover, approval from the state government is pending. Further RFQs are expected soon.  The project requirements are:   cranes, dozers, excavators, drilling machine, scaffolding, elevators, among others.
8Project Event: RFQs for dismantling services are expected by Q4 2019.
8
Expenditure Approval: Q3: 2018
8RFQ Date: Q4:2019
8Release Date: Q4:2019
8Start Date: 2020
8Completion Date: 2021
Click here for more details  Details
82018 was critical for India’s coal-fired power sector, with 21% of capacity identified as ‘stressed’ and at risk of bankruptcy.
8The government intervened by providing short-term power purchase agreements and related coal supply linkages, despite risks of a wider systemic problem, where coal will become increasingly uncompetitive with renewables.
You can click on Reports for more Details
8The existing projects for which long term PPA are already in place, shall be allowed to participate in REC scheme after the expiry of their existing PPA Details
8State-owned companies carry out most coal mining and power production in India: This paradigm will not change soon Details
8India’s banking system provide around US$10.6 billion per year of public finance for coal mining and coal-fired power domestically: A report
8Country breakdown of the global installed coal-fired power generation capacity under a 1.5°C compatible pathway from 2018 to 2050: Find out where India figures Details
8In India, at current costs, renewables could replace between 25% and 50% of existing coal capacity, and the average gap in costs compared to solar and wind is expected to increase by three to five times, by 2030. Details
8International public finance for coal-fired power provided by G20 governments: It still amounts to a lot of money Details
8Change in law due relief under GST for new solar power projects: Is that allowed? Details Details
For reference purposes the website carries here the following tenders: 
8Annual mechanical, Electrical maintenance and Operation assistance of Ash handling plant Details
8Tender for Work of thermal Insulation for Boiler & its Various Auxiliaries Details
8Tender for Procurement of various spares of VFD system of ID fans Details
8Design, Engineering, Manufacture, Supply, Installation, Erection, Testing and Commissioning of 01 Number, 400kV Bus Reactor Bay Details
8Tender for Preventive / Breakdown Maintenance of Air Preheater Details
8AMC for work of attending various Regular Maintenance Work on 220kV/132kV Lines Details
8Tender for Supply of LT CT Details
8Tender for shifting of HT and LT poles Details
8Annual contract for Work of loading, unloading, winching and transportation of various capacity EHV Transformers along with/without oil and all accessories Details
8Annual Contract for attending emergency fault & annual maintenance work at various EHV Details
8Supply of spares for 70 MVA, 13.8 KV/400 KV, Single Phase Generator Transformer Details
8Tender for Supply and erection of 5 Nos. 415 V LT Indoor breaker with C&R Panel Details
8Tender for Reconditioning of defective coal nozzles Details
8Tender for Overhaul and load testing of FD & PA Fan hoists assembly Details
8Tender for two years contract for maintenance of various auxiliaries in CHP Details
You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips:
8Budget 2019: Electric vehicles to get host of tax sops Details
8Coal India supplies 491 MT coal to Tamil Nadu in 2018-19 Details
8Govt invites technical bids for 4,000 MW Deoghar UMPP Details
8National discoms signals depleting dependence on state-owned entities Details
8Why the government is pushing EVs to fight climate change Details
8CIL’s relaxed production target still looks stiff Details
8India's annual coal demand rises 9.1% to nearly 1 billion tonnes, says Coal Minister Pralhad Joshi Details
8Despite climate pledges, G20 coal subsidies rise over three years Details
8Indonesia's Bukit Asam aims coal gasification from new plants by 2024 Details
8Four dams to get floating solar power plants in Maharashtra Details
8Solar play: Vedanta to bid aggressively for government projects Details
8Electric vehicles up to 67% less emission intensive than conventional cars Details
8ICRA expects clarity on safeguard duty, funding for discoms and renewable parks from Budget Details
8Car trash to cash: U.S. firm aims to power European stadiums with old car batteries Details
8States may get regional power regulators Details
You can also click on Newsclips for more
Details
8Despite delays and environmental concerns, India raised its hydropower capacity by 0.5 GW last year, for a year-end total of 45.1 GW.
8India had a pipeline of 37 additional hydropower projects representing 12 GW of capacity
8Although 16 of those (6 GW) were stalled for various reasons, such as lack of funds as well as environmental concerns, there is progress to be made in the others
You can also click on Reports for more Details
8Policy coverage for renewables and energy efficiency in buildings and industry: Global template Details
8Global lithium battery diaphragm market insights, forecast up to 2025 Details
8NTPC to start biomass co-firing at all of its coal-based thermal power stations Details
8Wind power, different now than before: Characterised by stable installations, falling prices in a competitive industry and growing interest in offshore wind power Details
8Severe accident modelling and analysis for Kudankulam nuclear power plant: What can be the worse case scenario? Details
8Optimal sizing of battery energy storage for a grid-connected microgrid: An analysis Details
You can also click on Reports for more Details
For reference purposes the website carries here the following tenders: 
8Supply, Erection, Testing & Commissioning of 220kV S/C lines Details
8Tender for Annual Maintenance Contract of C&I system Details
8Appointment of consultant for providing project consultancy services for installation of super critical TPS Details
8Appointment of consultant for providing project consultancy services for installation of TPS Details
8Supply, erection testing & commissioning of 400kV bus reactor Details
8Tender for Procurement of Spares for spray system Details
8Tender for Procurement of Pneumatic Actuator Details
8Supply and Erection of Damper assembly full Unit with frame for FD Fan Details
8Annual overhaul of Air Pre Heater-‘A’ Pass and its lube oil system Details
8Annual overhaul of Air Pre Heater-‘B’ Pass and its lube oil system Details
8Tender for the Supply of Conveyor Belt Details
8Tender for Procurement of 11KV Solid Core type HG fuse set Details
8Tender for Round the clock running, preventive and breakdown maintenance of MAX- DCS/MAXDNA system Details
8Tender for Round the clock routine /preventive/ breakdown maintenance of C&I field equipments in Boiler and TG area Details
8Tender for survey, erection, testing and commissioning for re-conductoring of existing 11kV line by ACSR DOG conductor Details
8Supply and delivery of LT & HT AB cable accessories Details
8Tender for Erection, testing and commissioning for system strengthening through re-conductoring of existing 11kV line by ACSR DOG conductor, and LT line by AB cable Details
8Tender for survey, erection, testing and commissioning for system strengthening through re-conductoring of existing 11kV line by ACSR DOG conductor Details
8Tender for Replacement of Boiler Drain, Vent & Impulse Lines and various High Pressure Valves Details
8Tender for manufacture, Testing, Supply & Delivery of 400 nos. Isolators Details
8Supply, Erection, Testing & commissioning of 1 Nos. 33kV 3-Way RMU Details
8Tender for Work of rate contract attending routine maintenance work during outage & emergency work during breakdown/ occurrence at various 220/132/110KV S/S Details
You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips:
8India taking more US coking coal, pushing out Australia: Xcoal Details
8BHEL bags Rs 840 crore order for emission control equipment Details
8Inox Wind commissions Common Power Evacuation Systems with ISTS network at Dayapar,Gujarat Details
8Tata Power eyeing InvIT route for monetising renewable energy assets Details
8Hydel power producer NHPC comes to the aid of stressed thermal gencos Details
8NTPC: demand new challenge for India’s top power producer Details
8Nepal, Bangladesh agree for joint investment in hydropower projects Details
8Power Corpn meets record demand of 2,638L units Details
8Inox Wind up on commissioning project in Gujarat Details
8Lower for longer: Supply glut in focus as Asia's biggest coal meet begins Details
8Coal India targets stakes in overseas coke mines Details
8Suzlon offers to sell majority stake to Brookfield for settling loans Details
8Gujarat: Rooftop solar power generation scheme for slums soon Details
8‘Power discoms’ proposal to hit rural consumers the most’ Details
8Power ministry working on new norms for discoms to secure payment to gencos Details
8L&T bags 1,320-MW power project order in Bihar Details
8GST Council to consider reducing tax on electric vehicles: Anurag Thakur Details
820 e-buses await charging points to ply in Srinagar Details
8Power demand jumps by 10 per cent in Punjab Details
8ABB develops zero emission electric truck Details
You can also click on Newsclips for more
Details
Project Name: Greenfield Hydroelectric Project
8Project Cost: Rs 1397.28Crores
8Project Description: The owner has put a greenfield 120 MW (3x40 MW) hydropower project, the project is on survey and investigation stage . The issue of non-availability of techno-economic clearance from the CEA has been resolved. The project is located at Dharchula village, in the Pithoragarh district of Uttarakhand. The detailed project report was prepared by using in-house resources. Financial approval from the Ministry of Power is expected to come in Q4 2019.
8Project Event: RFQs are expected to come in Q4 2019.
8
Expenditure Approval: 2019
8RFQ Date: Q4:2019
8Release Date: 2019
8Start Date: 2020
8Completion Date: 2025
Click here for more details Details
8Total global capacity rose 8% in 2018
8Non hydro capacity grew 15%
8More renewable capacity added yearly than fossil fuel and nuclear
8181 gigawatts of renewable power added in 2018
Click on Reports for more Details
How robust are those renewal energy projects which have offtake guarantees from private sector companies?
8As this example shows, unless the purchase agreement is long enough, the risk factor will always be high, no matter how low the tariff is
Click on Reports for more Details
State governments are now evolving their electric vehicle policies in right earnest
8Residential properties and government office premises can also be used for charging, among a lot of other spaces
Click on Reports for more   Details
For reference purposes the website carries here the following reports: 
8Who were the renewable energy leaders at the end of 2018?: Know more
8Annual conference is coming on waste to energy and fuel: Know more
8Fossil fuel subsidies are still widespread: A report
8Biofuels and EVs growing but renewable share in transport remains low: An report
8Asia the main world market for solar PV for sixth consecutive year Details
8Pumped storage dominant for utility scale energy storage: 1.9 GW of pumped storage added in 2018 Details
8Electric passenger vehicle stock grew over 60%: More than 2 million electric cars were sold in 2018 Details
You can also click on Reports for more Details
Project Name: R&M in hydel power station
8Project Cost: 21.83 Crores
8Project Description: The owner has completed renovation and modernisation (R&M) works of unit-2 (23 MW) and Unit 3 (23 MW) of the 115 MW (5x23 MW) hydro power station.
8Project Event: RFQs for supply, installation, erection and commissioning of a new digital governor are expected by Sep 2019.
8Expenditure Approval: Q2:2017
8RFQ Date: Sep:2019
8Release Date: Sep:2019
8Start Date: Q4:2019
8Completion Date: Q3:2020
Click here for more details
Details
For reference purposes the website carries here the following tenders: 
8AMC for generator auxiliaries and DC system Details
8Tender for Work of replacement of damaged earthwire of 400 kV lines Details
8Tender for R & M of HT and LT Lines and substations Details
8Tender for Biennial Job Contract for Conveyor Belt & Pulley Lagging Maintenance in CHP Details
8Tender for Running and Maintenance of Electrical works Details
8Tender for Drawing 4.5 km 11 kV ABC Details
8Tender for Procurement of Static Intelligent Energy Meters Details
8Tender for supply of Porcelain 11 KV Post Insulator Details
8Tender for Work of LILO with guide tower & allied line works for 132 kV Ckt along with end bay Details
8Tender for turnkey works contract for Construction of 132kV SCDC line Details
8Supply of Hydrogen Gas required for TPS Details
8Tender for earthing, PCC and related works at 132/33kV S/S Details
8Tender for Supply and Erection of Super Heater Damper Flaps Details
8ARC for Maintenance of Refrigerant type Air Driers of Compressor Details
8Tender for supply of Distribution transformers Details
8Rate contract for Operation and Maintenance of ESP Plants Details
8Annual Rate contract for operation and maintenance of ESP Details
8Annual Rate Contract for Transportation of Coal from different Collieries/Coal Washeries to TPS Details
8Annual Rate Contract for Supply of Caustic Soda Flakes Details
You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips:
8Adani firm trying to impede our probe, DRI tells Bombay HC Details
8Bescom to use solar power for e-vehicles Details
8Tamil Nadu seeks more time to set up green energy corridor Details
8Tariffs Drop to 2.48/kWh in SECI’s Rajasthan 750 MW (Tranche-I) Auction Details
8After Tamil Nadu, NSEFI Writes to Karnataka About Solar Projects Facing Curtailment Details
8Andhra Pradesh government to introduce 350 electric buses in five cities Details
8Adani Green Energy arm bags 130-MW wind power project from SECI Details
8Avg power usage spikes by 25 per cent in Delhi this summer: Study Details
8JK terminates contracts for Lower Kalnai hydro-power project Details
8Srei Equipment gets $30 mn from Dutch bank for refinancing green projects Details
8Gujarat: Powerloom weavers up in arms against DGVCL over power cuts Details
8NHPC to finalise supply of 2.5 GW power through stressed thermal projects Details
8Jammu and Kashmir to run electric buses in Srinagar from next month Details
8Arunachal Pradesh: Mein pleads for power package from Centre Details
8Govt's stress on infrastructure and EVs: President Ram Nath Kovind Details
8Indians shifting to hybrids on green policies, carmakers’ push Details
You can also click on Newsclips for more
Details
For reference purposes the website carries here the following tenders: 
8Tender for Supply of LT Motors fo TPS Details
8Design, Engineering, Manufacture, Supply, Erection, Testing and Commissioning of Generator Transformer Details
8Tender for manufacture and supply of 2304Nos. of 7.50m PSC poles and 864Nos. of 8.00m PSC poles Details
8Tender for manufacture and supply of 3680 Nos 7.50m psc pole Details
8Tender for manufacture and supply of 3300 Nos 8.00m psc pole Details
8Tender for the Supply of Hastelloy C-276 Side and Bottom/ Rear seal assemblies for HP 803 Bowl Mills Details
8Annual Maintenance Contract for Preventive & Breakdown Maintenance work of 400kV & 220 kV S/Stn Details
8Tender for Up gradation of 66kV SC line to 110kV DC line Details
8Supply, erection & commissioning of medium voltage variable frequency drive for conveyors Details
8Tender for Work of Operation & Maintenance of MRHS Details
8Design, Manufacturing, Supply, Testing & Commissioning of complete DCS/SCADA based monitoring and control system Details
8Rate contract for coal mill overhauling Details
8Tender for BMC of ESP Maintenance Details
8Tender for Procurement for Spares of conductivity & PH Analyzers Details
8Tender for testing of metering equipments Details
8Tender for Routine and preventive maintenance (Mechanical) of CW/SACW/ACW Pumps Details
8Tender for Supply of Cooling Tower Blade Set Details
8Tender for Overhauling of HP Bypass system during medium overhauling of turbine Details
You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips:
8UPERC throws a spanner in move to hike power tariff Details
8Growth of renewable energy complicating the dynamics of trade & energy relations Details
8Report on high tariff charged by Adani Power soon: Minister Details
8JSW Energy on the lookout for stressed plants to grow power portfolio Details
8Power utility comes up with one-time settlement scheme Details
8NLC India Commissions 100 MW Solar Plant in Tamil Nadu Details
8BHEL commissions 84 MW unit at Chhukha hydro project in Bhutan Details
8Adani Green Energy arm bags 600 MW solar wind hybrid projects Details
8Solar industry needs to ensure efficient use of water: Bridge to India Details
8Tripura now exporting power to Nepal: Deputy CM Details
8Solar power tariff remains low at Rs 2.5 per unit in SECI auction Details
8Uttar Pradesh: Tweak the clause for rooftop solar power plants, directs govt Details
8Govt to invoke special powers, save renewable energy projects of Rs 40,000 crore Details
8Arunachal's deputy CM discusses Kameng hydropower project with Union power minister Details
8MNRE to set up Dispute Resolution Committee for solar, wind power developers Details
8EVs to get registration charge waiver Details
You can also click on Newsclips for more
Details
8Global hydroelectricity consumption: A full analysis of where India stands Details
8Business opportunity for new thermal power plant: Know more Details
8Indian EV revolution cannot take off anytime soon: An analysis Details
8Life cycle assessment of low-rank coal utilization for power generation and energy transportation: An analysis Details
8Climate crisis demands more government action as emissions rise Details
You can also click on Reports  for more Details
The situation with Reliance Power seems to be going from bad to worse
8The liquidity profile of its key operating subsidiaries namely Rosa Power Supply Company Ltd (RPSCL) and Vidarbha Industries Power Ltd continues to be weak
8There is a delay in debt servicing by one of its subsidiaries and that seems to be a dangerous sign
8The ratings also factor the high leveraging levels of the company at a standalone level along with the significantly high refinancing risk.
Click on Reports for more Details
Project Name: Koradi Thermal Power Station - Installation of FGD Rs. 800.00 Cr. 
8Project Cost: 800 Crores
8Project Description: A tender has been floated for the installation of two wet limestone flue gas desulphurization (FGD) plants at Unit 8 and 9 (660 MW each) in its 2400 MW (2x210 + 3x660 MW) thermal power complex. Technical evaluation of the bids are currently on.
8Project Event: Award of FGD is likely to be expected by August 2019.
8Expenditure Approval: Q1:2018
8RFQ Date: March:2019
8Release Date: March:2019
8Start Date: 2020
8Completion Date: 2022
Click here for more details
Details
Coal India Ltd seems to be still a long time away from achieving the 1 billion tonne production level
8Of late, output has been flat and the immediate task of achieving a 660 MT target may not seem feasible.
8Find out what kind of capex the company has in mind as of now and in which areas this money will be spent
8Big spending on washeries is also planned ahead by the company.
Click on Reports for more. Details
For reference purposes the website carries here the following reports: 
8Coal India: Management is planning to add mega projects with capacities of 30-40mtpa to augment supplies as older mines near end of reserves Details
8Update on recent progress in reform of inefficient fossil-fuel subsidies that encourage wasteful consumption Details
8Monthly summary for the cabinet in respect of Ministry of coal Details
8Bharat Aluminium Company Limited: With the increase in CPP capacity, which is currently at a significant surplus, the risk of having to source high-cost power for the smelting business reduces considerably. However, in the power sales business faces credit risks, given the weak financial health of one of its key customers. Details
8Global (Regional) electricity generation by fuel 2018. A full analysis of where India stands Details
8Power utility-wise status of fly ash generation & its utilization during the year 2018-19, and  state wise status of fly ash generation and utilization during the year 2018-19 Details
8Thermal power stations that have achieved fly ash utilization level of 100% or more during the year 2018-19: Get a full list here Details
You can also click on Reports  for more Details
Spot e-auction of coal is eliciting a much higher price than notified prices
8In some auctions, the price is 100% more
Click on Reports for more Details
8Aggressive government policies for wider usage of fly ash is now being suggested
8There is a lot that is still required to be done from the power plant owner's point of view
Click on Reports for more Details
For reference purposes the website carries here the following tenders: 
8Tender for Mechanical Maintenance of Equipment and Belt conveyors of Coal Handling Plant Details
8Tender for Shifting of 3 Nos. 33kV feeders Details
8Tender for the Work contract for complete Repairing/Servicing/Rewinding of Alternator Details
8Tender for Round the clock operation and maintenance of Ash handling plant and Coal Mill Reject Handling System Details
8Tender for supply of Porcelain 11kV Post Insulator Details
8Tender for supply of reheater rear panel coils Details
8Tender for purchase of spares of pump for generating units Details
8Tender for Supply of various LT cables Details
8Tender for imparting Training on Operation , Maintenance and Testing of Power Distribution System Details
8Tender for Supply and erection of 11KV line & pole shifting work Details
8Tender for Retrofitting of pH and Conductivity analyzer of dry panels Details
8Tender for Round the clock Routine/Preventive/Breakdown maintenance work of C&I field instruments Details
8Tender for replacement of 11kV XLPE copper cable Details
8Tender for Work Contract for Civil work, Supply, Erection, Testing and Commissioning of of 220kV Power supply Details
8Design, Engineering & Supply of 33kV bay terminal equipment Details
8Tender for Geotechnical Investigation for construction of Grid Substations Details
You can also click on Tenders  for more
For reference purposes the website carries here the following Newsclips:
8The world will get half its power from wind, solar by 2050. Details
8Wind capacity addition likely to improve to 3.5-4.0 GW in FY20: Icra Details
8State cancels 8 hydel projects Details
8N Chandrasekaran allays Tata Power shareholders concerns on debt, rules out rights issue Details
8Eight EU countries to phase out coal by 2030 Details
8Renewables to be the Primary Source of Energy by 2040 Surpassing Coal: BP Energy Outlook Details
8Germany needs to ease rules to hit 2030 renewables target Details
8NCLT orders liquidation of Moser Baer Solar Details
8MNRE to set up Dispute Resolution Committee for solar, wind power developers Details
8Impose green cess on polluting vehicles to support electric vehicles: SMEV Details
8New-age entrepreneurs back govt’s EV plan; old peers oppose it Details
8GST on electric vehicles may be reduced to 5% Details
8High-voltage power lines emitting electromagnetic waves: Erode MP Details
8Uttar Pradesh: Electric buses to operate in 9 cities Details
8No power tariff hike in Chandigarh, says JERC Details
8Germany's Siemens says to cut 2,700 jobs worldwide Details
You can also click on Newsclips for more
Details
Project Name: Thermal Power Station - FGD Addition
8Project Cost: 400 Crores
8Project Description: The tender for installation of the FGD system in the 2x500 MW and 1x210 MW thermal power station  has been delayed Cost estimates and tender specifications for the type of technology for the FGD to be implanted has been prepared but is waiting for clearance from Maharashtra Electricity Regulatory Commission. Further bids are expected soon.
8Project Event: RFQ for design, engineering, installation, erection, and commissioning of the FGD system is expected by Aug 2019.
8Expenditure Approval: Q1:2017
8RFQ Date: Aug:2019
8Release Date: Aug:2019
8Start Date: 2021
8Completion Date: 2023
Click here for more details
Details
Clearly solar and wind generation companies are facing a crisis of payment from government-owned utilities
8In most cases, the payment cycle has gone up by about four to five months over the past one year
8Only the strongest are in the position to generate adequate cash flows to service fixed costs
8Given the variable nature of wind or solar energy, the uncertainty factor is large
8Then again, those assets with relatively higher tariff than the average power purchase cost of the state distribution utilities, may remain exposed to grid curtailment risk in future as seen in few other states
8Also, single asset, single location entities are at bigger risk
Click on Reports for more Details
There is now an expectation of an addition of 10 GW of rooftop photovoltaic installations by fiscal 2023
8This will be driven by commercial & industrial buildings and phase II of grid-connected Roof Top Solar programme.
8The turning point in rooftop solar, combined with storage, has been reached, it seems
Click on Reports for more Details
Cloud based solutions (OPEX model) through capital grants of GoI is being examined through a Committee headed by CEA
8Utilities have been advised not to delay the already sanctioned projects
8The progress of works will be strictly monitored on fortnightly basis
Click on Reports for more   Details
8Status of energy storage projects pipeline in India: Business opportunities ahead Details
8Comparison between Large scale solar projects tariffs Vs NTPC average tariff (Annual) Some very interesting findings Details
8Business opportunity for a captive power plant: Know more
8The role of G20 supporting the global agenda on climate and infrastructure: An report
8Comparison of energy efficiency policy and practice ratings for the world’s largest energy users: An interesting analysis Details
8The world's first fuel: How energy efficiency is reshaping global energy systems Details
8Comparison of state-wise grid tariffs and LCOE solar PV plus battery storage: Surprising results Details
8How to tackle air pollution and grow the green economy Details
You can also click on Reports  for more  Details
The hydrogen economy is now upon us.
8What is in question is how fast it will catch up.
8Here is a full briefing on what is going on and what needs to be done to get the hydrogen economy up and running as soon as is possible
Click on Reports for more Details
For reference purposes the website carries here the following tenders: 
8Tender for Overhauling of boiler non-pressure parts Details
8Tender for work of operation of 220kV S/S Details
8Annual rate contract for maintenance of milling system, fans and Air preheaters Details
8Tender for Biennial Electrical Maintenance Contract for CHP Details
8Tender for Laying of LT Arial Bunch Cable with supply and erection of complete material on turnkey basis Details
8Tender for Work contract for Partial Repair of 11KV, 105 MW Hydro Generator Details
8Tender for Work contract for Breakdown maintenance of Coal Mills, Fans & APH Details
8Supply, installation & commissioning of 25 Mtr. High Mast Towers and Lighting System Details
8Supply & retrofitting of 11 kV Circuit Breakers  Details
8Supply of 02 nos. hydraulic oil filtration machine with contamination sensor for CHP Details
8Tender for Procurement of various Spares of Ash Handling Plant Details
8Tender for Installation of Ammonia dozing system Details
8Tender for Repairing & Reconditioning of Old, Used & Damaged conveyor belts of various length Details
8Tender for Establishment of 220/22 kV GIS Substation Details
8Design, manufacture, assemble, testing, supply, erection, testing and commissioning of automatic float & float cum boost battery chargers Details
8Annual Maintenance Contract for 09 Nos. Pneumatic Conveying Compressor Details
8Tender for Procurement of Low Nox coal Burner assembly Details
You can also click on Tenders  for more
For reference purposes the website carries here the following Newsclips:
8Kerala: KSEB to sign power purchase pact with private firm today Details
8Mumbai: Adani power puts steps in place to brace for monsoon Details
8South Korea fires up on renewables, to close more coal plants Details
8IITH improves solar cell efficiency using magnetic field Details
8As the sun shines, Dwarka societies reap cash benefits Details
8'Union Budget will be game changer; these 3 stocks could turn multibaggers in Modi 2.0' Details
8Uttar Pradesh Modifies Clauses in the 500 MW Solar Tender Details
8First pilot floating solar plant to be completed in next 2-3 months: Vedanta Details
8Pune firm develops solar-powered irrigation system Details
8Mayawati hits out at UP Govt on proposed increase in electricity tariffs for domestic consumers Details
8Delhi: Solar power can save you Rs 46,000 in yearly bill Details
8Essel Group in talks to sell solar assets, YO1 wellness centre in US Details
8Water level in Karnataka's hydropower dams dips to 14% of capacity, hits rock bottom in three Details
8Niti’s new road map: Only electric vehicles to be sold after 2030 Details
8Singapore's Sembcorp defers India energy IPO to inject capital Details
8Chhattisgarh: Villagers oppose public hearing for coal site awarded to Adani Details
You can also click on Newsclips for more
Details
Project Name: Thermal Power Station Addition Project Stage-II
8Project Cost: 250 Crores
8Project Description: The owner has floated a tender for an ash water recirculation package in a 2x195 MW thermal power project,and has completed the bid evaluation process and awarded the tender. RFQ for balance works- such as site infrastructure is getting delayed due to pending approval from management.
8Project Event: RFQ for the balance works- Site infrastructure is likely to be expected by August 2019.
8Expenditure Approval: Q1:2018
8RFQ Date: Aug:2019
8Release Date: Aug:2019
8Start Date: Q4:2019
8Completion Date: Q3:2020
Click here for more details

Project Name: Thermal Power Plant - Installation of FGD
8Project Cost: 1000 Crores
8Project Description: The owner is facing management issues in coming out with bids for installation of a Wet Flue Gas Desulphurisation system in the 1340 MW (4x210+1x500 MW) thermal power station due to the high cost of gas-gas heater based WFGD. 
8Project Event: RFQ for the design, engineering, supply, erection, and commissioning of WFGDs is expected by August 2019.
8Expenditure Approval: Q3:2018
8RFQ Date: Aug:2019
8Release Date: Aug:2019
8Start Date: 2020
8Completion Date: 2022
Click here for more details
Details
The government seems to be putting together a framework for a gas subsidy-based revival scheme for stranded gas-based capacity
8The CEA is reported to have finalized a proposal, and the power ministry is processing it with the help of the finance and petroleum ministries.
8But unless the framework is properly structured, including removing GAIL as the sole supplier or determinant of gas price, the scheme may meet the same fate as its earlier avatar.
Click on Details for more. Details
 For reference purposes the website carries here the following reports: 
 
8FGDs in generating units in India: A full progress report
 
8Comparison: How does power purchase agreement prices compare for coal, wind and solar between India and Indonesia Details
 
8Business opportunity available in a coal mining project: An update Details
 
8US-India clean energy finance: List of those who benefited from it Details
 
8The District Energy in Cities Initiative: Progress report in 2019 Details
 
8Performance assessment of renewable energy systems: A full analysis of how it is done Details
 
8Solar power generation, utilization and monitoring using internet of things: Big improvements possible Details
 
8Opportunities and challenges of integrating renewable energy sources in a smart grid: An analysis Details
 
8Three approaches to fossil fuel subsidy reform: Remove, target and swap Details
 
8A focus on large-scale opportunities to increase impact: on-grid renewable in emerging economies Details Details
For reference purposes the website carries here the following tenders: 
8Tender for Oil leakage attending and complete overhauling of Generator transformers Details
8Tender for Work of Various Routine, Preventive and Breakdown maintenance of Feeder Breakers of CHP Details
8Tender for Conducting Tube thickness survey in boiler first pass & inter pass Details
8Tender for Conducting Tube thickness survey in boiler second pass Details
8Tender for 02 years contract for handling of Coal Wagons, Oil Tankers & Allied Work in CHP Details
8Tender for 02 years contract for insulation work during overhaul, short shut down & routine maintenance of Boilers Details
8Tender Supply of Smart Electropneumatic Positioner at TPS Details
8Tender for Maintenance contract for 11kV Construction Power Network Details
8Tender for procurement of spares for ash handling system Details
8Design, Engineering & Supply of 33kV bay terminal equipment Details
8Supply and delivery of panther conductor for 132kV S/C line Details
8Supply of Testing & Measuring Instruments to Power House Details
8Tender for supply of valve spares Details
8Tender for Procurement of spares for ESP System Details
8Tender for supply of 2000 A Low tension Panel Details
8Tender for Purchase of 16 Nos RMUs with LBS and a remote control cubicle for 11kV outgoing feeders Details
8Design, engineering, testing & commissioning of 132/33kV Transformer Details
8ARC for operational support services for TPS Details
You can also click on Tenders  for more
For reference purposes the website carries here the following Newsclips:
8Budget 2019: New power projects may get investment-linked deductions Details
8US-based First Solar in talks to sell 45MW of solar assets in India Details
8Need to diversify rural energy: Official Details
8BHEL bags 200 MW solar energy orders worth Rs800 crore Details
8Tata Power's arm CGPL raises Rs 1,110 cr via NCDs for refinancing debt Details
8Uttar Pradesh power utility proposes 25% hike in electricity tariffs Details
8Power minister says India inching towards meeting Paris convention targets Details
8CERC allows Power Grid to offer towers to telecos for BTS installation Details
8Adani's Australian coal mine torches rationality Details
8Govt may push Coal India to merge or list subsidiaries Details
8Unhappy with few OEMs, wind power developers prefer own O&M Details
8U.N. chief calls on EU to raise 2030 climate goal to 55 per cent by 2030 Details
8PSPCL fires up thermal plants as demand shoots back to 10k MW Details
8Bescom plans 650 e-vehicle charging stations across Karnataka; 100 in Bengaluru Details
8Niti Aayog calls meeting to discuss electric vehicles timeline issue after industry furore Details
You can also click on Newsclips for more
Details
Project Name: Brownfield Super-Critical Thermal Power Project - FDG addition
8Project Cost: 7920 Crores
8Project Description: The owner. has floated tender for installation of FGD in its brownfield 1320 MW (2x660 MW) super-critical thermal power complex at its existing 1500 MW (6x250 MW) thermal power station. Technical evaluation of bids is currently on. It has hired BHEL as EPC contractor for operation of 1320 MW (2x660 MW) super-critical thermal power complex and BHEL has successfully powered one of the units of (660 MW) and other unit of 660MW is expected to be operational by August 2019. 
8Project Event: Award of FGD is likely to be expected by Oct 2019.
8Expenditure Approval: 2012
8RFQ Date: May:2019
8Release Date: May:2019
8Start Date: May:2013
8Completion Date: Nov:2019
Click here for more details
Project Name: Thermal Power Station: FGD Addition Project
8Project Cost: 500 Crores
8Project Description: The onwer has come out with the tender for installation of a wet flue gas desulphurization system in the operating 1200 MW (2x600 MW) Thermal Power Station Technical evaluation of bids is currently on. 
8Project Event: Award of FGD is likely to be expected by Sep 2019.
8Expenditure Approval: Q1:2018
8RFQ Date: May:2019
8Release Date: May:2019
8Start Date: 2021
8Completion Date: 2023
Click here for more details
Details
Yesterday for the first time, it was demonstrated live that a full charge of a two-wheel electric vehicle (EV) can be done in just five minutes.
8An electric scooter equipped with a new ultra-fast charging battery demonstrated that this technology can charge an electric vehicle in only five minutes.
8This proof-of-concept represents a major milestone for ultra-fast charging battery technology and its game-changing potential to accelerate the adoption of EVs.
Click on Reports for more Details
The website carries here a schedule of transmission line outages in India coming ahead
8The reason for the outage and the period of time are also documented
Click on Reports for more Details
The power minister has ordered resolution of all issues which have come in the way of a generating company procuring renewal energy from anywhere in the country against its own commitment to supply
8A timeline has been set to resolve all issues related to the subject so that such procurement can take off without any hurdle
Click on Reports for more Details
 1 2 > 

Showing 1–50 of 91 items