Aug 2026

8Daily Excel covering new tenders and all published updates including corrigendum, amendment, addendum, clarification and status revisions, along with technical and financial bid opening, evaluation completion and final award actions including AOC and LOA issuance.
Click on Reports for more Details
8POWERGRID’s storage proposal has brought a basic commercial question before CERC: who is buying the charging electricity, selling the output and retaining the proceeds? The regulator has asked for that transaction model and its legal basis before the proposal moves further. Details
8Gujarat and Madhya Pradesh were over-drawing during a low-frequency episode, but the reasons extended beyond a simple shortage of installed capacity. The western grid review records thermal restart timing, weather-driven demand changes and linked hydro constraints behind the states’ response. Details
8Repeated flooding at Champa has moved the issue beyond a one-off restoration exercise. The latest review records generation and transmission effects despite earlier remedies, while the longer-term answer remains entangled with external drainage responsibilities and equipment design. Details
8A transmission line interrupted for a VVIP helipad in September 2024 remained unresolved in the latest western-region review. Its operator now says the outage is affecting project availability and incentives, while restoration still depends on payment, land-access and clearance issues. Details
8IEX’s day-ahead weighted price recovered sharply for Aug 31, 2026 after the previous day’s fall, but the exchange cleared less energy. Rising purchase bids and falling sell bids changed the auction balance without translating into higher traded volume. Details
8Adani’s claim for reactive-power equipment costs faces a question that goes beyond the size of the bill: what changed legally, and what was already required? CERC has asked for that distinction before deciding claims across three projects totalling 417 MW. Details
8Haryana’s transmission utility has not won a general escape from its declining loss targets. The regulator has instead kept any relief tied to audited annual facts, after the company’s own historical performance undercut an absolute claim that losses below 2% were infeasible. Details
8Haryana has withdrawn approval to procure 96 MW from Dikchu after years without an agreed PPA. The regulator also found that the procurement framework lacked the security provisions needed to hold a supplier to a capacity commitment. Details
8A proposed Rs 55 crore transformer at Talegaon is being tested against a demand increase that could nearly double the station’s loading. But another substation due in March 2027 may alter the need, leaving the investment dependent on a fuller network study. Details
8Two renewable-evacuation schemes at Solapur have exposed a mismatch between new connection-bay ratings and adjoining substation equipment. Proposed upgrades total about Rs 4.68 crore before GST, but the committee discussion leaves both approval and responsibility unresolved. Details
8SECI wants an already operating storage asset for a one-year contract, with up to 485 cycles and significant performance deductions. Its tender pairs a fixed monthly capacity payment with strict efficiency and availability obligations, while the standard agreement excludes contractual change-in-law relief. Details
8Meghalaya’s proposed service standards would give a rural utility up to 96 hours to restore certain line and transformer failures, against much shorter urban deadlines. Missing those particular standards would attract Rs 50 per default, while other service failures would generate daily compensation. Details
8APSPDCL’s first-quarter accounts show a much wider loss measure once collections are included. The gap is not evidence that a quarter of its electricity disappeared: it reflects the combined effect of billed-energy shortfalls and money collected against billing. Details
8Punjab’s proposed 250 MW solar purchase faces a broader price test than a comparison with other solar bids. The regulator has also asked the state utility to show solar-hour exchange prices and the prices realised from its own power sales before the procurement case is decided. Details
8Borosil Renewables secured shareholder approval for Ashok Jain’s FY27 remuneration even though a majority of the public institutional votes cast opposed it. The result shows how strongly an overwhelming overall approval can differ from the position of a particular shareholder category. Details
8Repeated faults on the Vadodara–Lakadia transmission line have put a much larger replacement job on the agenda. The operator says nearly 43,000 installed insulators need attention on a corridor expected to carry increasing renewable output, even after an earlier faulty batch was replaced. Details
8Uttar Pradesh utilities have completed refunds to more than 92,000 consumers over smart-meter connection charges. The regulator has also stopped fresh keypad-meter installations, but the next requirement is a replacement roadmap—not evidence that the old devices have already been removed. Details
8Renewable generators in Haryana have won a less cumbersome route to banking approvals, including concurrent processing and tighter limits on extra documentation. The relief has a firm boundary: it does not turn previously lapsed energy or disputed historical settlements into fresh entitlements. Details
8A 1 MW canal-based hydrokinetic pilot has secured a 40-year tariff approval, but not a unanimous one. CERC’s majority accepted the procurement despite the absence of technology-specific bidding guidelines; its dissenting member challenged the legal route, tender scrutiny and duration of the pilot arrangement. Details
8Gujarat’s renewable curtailment on Jul 28, 2026 coincided with net market purchases and substantial under-drawal, according to the Western Regional Load Despatch Centre. The state attributed the episode to extreme-weather demand swings and the timing of thermal and renewable recovery. Details
8New wind and solar projects will have to price a different imbalance-settlement exposure into their bids and operating plans. CERC has adopted general-seller treatment for specified future projects despite renewable-industry objections, while leaving an important pooled-project implementation question for a separate procedure. Details
8Datta’s disputed connectivity stays protected while CERC reserves its decision
8Saimaa’s 150 MW connectivity protection continues until CERC decides
8PSPCL brings DVC’s FGD-exemption consequences before CERC
8PSPCL seeks DVC refinancing savings from Bokaro and Raghunathpur
8CERC seeks tax records and state participation in NLC’s settlement-reimbursement case
8NLC’s Neyveli lignite price case faces land-tax and asset-data questions
8A 390 MW hybrid project seeks time and ISTS-waiver relief while awaiting GNA
8CERC asks CTUIL to correct a recommendation naming a different transmission project
8CERC asks how Rajasthan IV-A schemes will be staggered without losing their need
8Kishtwar delay claim must separate disruption from work already in the schedule
8Rajasthan Sun seeks Rs 8.48 crore back from NVVN shortfall deductions
8Khidrat’s 300 MW connectivity dispute moves to CTUIL’s reply stage
8Solarcraft’s 150 MW Solapur wind case awaits CTUIL’s response on commissioning relief
8Kallam change-in-law case gets another reply window after respondents fail to appear
8NHPC accepts admissibility argument in ABC Renewable case, but quantification remains contested
8TRN coal-allocation compensation case is reserved without a payment award
8Adani contests Rs 2.77 lakh in CTUIL bills; CERC admits the case
8Gadag-II sectionaliser works enter Khavda II-C licence-amendment scrutiny
8Rajgarh Neemuch seeks consent for security creation and refinancing arrangements
8Dhule transmission dispute requires an updated project-status filing
8JSW Renew Energy GST case proceeds to replies without a change-in-law award
8CERC gives Jhabua and KSEB a reply sequence for historical supply claims
8Tata Power Renewable’s GNA dispute moves through replies and rejoinder
8Aurum, KVK and Diwakar solar cases move to October after an unopposed adjournment
8ReNew bilateral-charge cases are adjourned to October without a merits ruling
8Hindustan Electricity must comply with earlier directions before the next access hearing Details
8Jharkhand approves a 10 MW increase in TSUISL’s DVC supply
8Bihar extends resource-adequacy consultation after receiving no comments
8Punjab gives PSPCL more time in a 220-kV consumer’s voltage-cost dispute
8Punjab reserves two biomass tariff-redetermination cases covering 16 MW
8OMSONS seeks a price for non-paddy-season surplus supply
8Haryana seeks utility replies on Avtar Steel’s green-open-access relaxation request Details
8CERC drops daily-average pricing proposal to preserve intraday deviation signals
8Standalone storage gets a Rs 2 ceiling for infirm injections-not a guaranteed tariff
8Cost-plus pumped storage gets an energy-charge reference for deviations in both modes
8DSM payment rule keeps ten days while allowing a CERC-approved alternative procedure
8West Bengal proposes timestamped photographs and itemised unauthorised-use assessments
8Meghalaya’s draft reliability measures use conflicting interruption thresholds Details
8APSPDCL’s farm-energy account relies on assessment for 94% of billed units
8POWERGRID seeks waiver after exchanges levy Rs 22.73 lakh in governance fines
8Surana Solar proposes AI and data-centre objects without committing investment
8Surana Solar approves Raviryala land-sale proposal; buyer and price remain open
8Patel Engineering completes Rs 55 crore exit from ACP Tollways stake
8Ola receives sanction for Rs 95.81 crore under auto PLI scheme
8Ola puts LFP-powered S1 Z deliveries on a December-to-March timetable
8Hitachi Energy India puts overseas related-party transactions to a postal ballot
8NHPC’s Jalpower merger hearing is postponed without a replacement date
8HCC schedules Mumbai investor meetings for Sept 3, 2026
8NHPC sets Sept 3, 2026 Mumbai appearance at Elara investor conference
8India Power creditors to consider bidder eligibility and expression-of-interest notice
8NALCO targets 20% more captive coal after FY26 supply reaches 40 lakh tonnes
8NALCO opens a 50-kg-a-day fly-ash recovery pilot, not a commercial metals plant
8NALCO’s CSR spending exceeds its stated FY26 obligation by Rs 1.64 crore
8Ola company secretary resigns; material-disclosure authority rests with chairman and CFO
8TARIL fixes dividend record date for Sept 18, 2026, with payment conditional on AGM vote
8Surana Solar appoints Buvankar Shekarnath for three-year whole-time role, subject to vote
8NTPC Green director vote passes with 99.36% support despite 9.42% institutional dissent Details
8Waaree wins 291 MWp solar-plus-storage EPC letter of award for FY28 delivery
8KPI adds 130 MW to its hybrid project during August
8KPI subsidiary signs GUVNL storage agreements for 565 MW and 1,130 MWh
8KP Green Engineering discloses Rs 258.02 crore of orders across six product lines
8NLC–NCRTC venture signs 25-year PPA for 110 MW of Uttar Pradesh solar
8ACME secures SECI letter of award for 300 MW of peak supply at Rs 6 a unit
8POWERGRID acquires Fatehgarh-II grid-strengthening vehicle for Rs 19.11 crore
8TARIL’s Kaiga transformer order falls in Rs 100–500 crore band
8Tata Power Renewable commissions 100 MW for three group-captive consumers
8NALCO and NLC plan 1,080 MW captive station for Angul smelter expansion
8SECI schedules renewable-sector cyber-auditor pre-bid meeting for Sept 7, 2026
8UPNEDA’s government-building solar tenders span on-grid, off-grid and hybrid systems
8Allied Blenders’ Moradabad expansion puts 9.5 MW of cogeneration in ToR proposal
8Odisha committee to consider clearance-validity extension for 120 MW coal project Details
8IEX real-time price falls 29%; previous evening’s four ceiling-price hours disappear
8PXIL real-time schedule finishes one-third below cleared volume on Aug 29, 2026
8IEX high-price day-ahead segment clears 68.4 MWh at Rs 20,000
8Western grid used only 239 of 599 approved July outages
8Mundra reverse-flow concern meets WRLDC’s finding that current loading is within limit
8Faulty Kawas meters lead to a one-off SCADA route for energy-charge calculations
8WRLDC says notice of Magarwada fire arrived over an hour after 133 MW loss
8Western region fixes four emergency-tower sites, with delivery expected in April
8Mumbai line faults persist after insulator replacement; root-cause report questioned
8Vapi-area flooding exposed an N-1 gap after 384 MW load loss
8Goa–Karnataka protection links await fibre-allocation concurrence
8Western states are asked for day-ahead reserve figures by 8 am Details
 For reference purposes the website carries here the following tenders:
 8Design, fabrication, supply, installation, testing, commissioning with remote monitoring system of total 453 kW grid connected SPV plant Details
 8Design, fabrication, supply, installation, testing, commissioning with remote monitoring system of total 258 kW grid connected SPV plant Details
 8Tender for civil works regarding switchyard extension 4 No. 132 kV bay at 132 kV sub-station Details
 8Tender for supply of LT single phase channel cross arm Details
 8Tender for supply of stay set complete Details
 8Tender for construction of retaining wall, gravel filling and formation for introduction of additional 100 MVA transformer Details
 8Tender for supply of 11 kV ,200A AB switch horizontal type with 11 kV post type insulators Details
 8Tender for supply and ETC of 12 No 30 M lighting mast Details
 8Tender for civil maintenance of S - 1, S-2 ash dyke and overflow lagoon Details
 8Tender for biennial work for maintenance of barrage and reservoir Details
 8Tender for supply, installation and commissioning of laboratory gas distribution system Details
 8Tender for installing 160 kVA transformer Details
 8Tender for supply of TLSA for 400 kV transmission lines Details
 8Tender for supply of 765 kV circuit breakers (With PIR) substation Details
 8Tender for supply of automatic contact resistance meter kit Details
 8Tender for estimate for the 33/11 kV new substation Details
 8Tender for procurement of 33kV vacuum circuit breaker alongwith Details
 8Tender for supply of hydrochloric acid Details
 8Tender for formation of new 110 kV yard at 66 kV substation Details
 8Tender for replacement of old and defective bay equipments C R panels and communication equipments of existing 220kV line bays along Details
 8Tender for setting up of 100 kW rooftop solar PV power project Details
 8Tender for utilization of 100 MWh (50 MW x 2 Hrs.) standalone energy storage system Details
 8Design, manufacture, testing, supply and delivery of 150W LED lighting along Details
 8Design, manufacture, testing, supply and delivery of 1561 nos. 11kV vacuum interrupters (Max. voltage 12KV, Normal amperes 2000A, Min. rupturing capacity 25KA) of various types suitable for various Details
 8Tender for repair of old U fencing at 220kV s/s Details
 8Tender for patch work with bituminous concrete 40 mm thick Details
 8Tender for construction of new 220kV substation Details
 8Tender for construction of 2 no. 220 kV bays for 220 kv DC line Details
 8Tender for Re development of yard, repair of broken trench and trench covers other civil works at 220 kV substation Details
 8Tender for civil and electrical repair works Details
 8Tender for day to day operation of pumps and valves installed Details
 8Tender for procurement of Hi-chrome grinding media balls Details
 8Tender for supply and painting of pipes, structures, equipments Details
 8Tender for supply, erection, testing and commissioning of firefighting pipe line Details
 8Tender for providing and laying 2.50 cm thick premix carpet surface Details
 8Tender for renovation of stores with earth filling Details
 8Tender for construction of new 33 kV underground crossing Details
 8Tender for preventive and break down maintenance works HP 803 bowl milling system Details
 8Tender for routine maintenance attending boiler tube puncture Details
 8Tender for civil estimates for deviation of 110 kV line Details
 8Tender for procurement of 22kV vertical type air break GOS switches Details
 8Tender for supply of LT three phase angle cross arm Details
 8Tender for attending preventive break down works in ACW pumps ASWB pumps Details
 8Tender for attending breakdown works in ESP and condition monitoring and attending minor repair works Details
 8Tender for attending breakdown preventive maintenance work in feed water system Details
 8Tender for procurement of telescopic earth rod Details
 8Tender for new 33 by 11 kV sub-stations augmentation or addition capacity including associated line and other works Details
 8Tender for supply and ETC of architectural fasade lighting system Details
 8Tender for SITC of electric submersible agitator slurry and sand pump and dewatering pump including hose pipe cable and their DOL control panel Details
 8Tender for work of supply, civil and ETC (excluding supply of 400kV ICT, CB & isolator Details
 8Tender for work of supply and ETC of 2nd ckt stringing work of 132 kV line Details
 8Tender for annual maintenance contract (AMC) for overhauling, repairing & servicing of 33 kV & 11kV circuit breakers Details
 8Tender for work of replacement of damaged/deteriorated old 0.5 ACSR quadruple bus conductor, jumpers, spacers Details
 8Tender for annual rate contract for providing expert services for troubleshooting of AC/DC equipments and control/ protection system Details
 8Tender for rate contract for the work of chemical cleaning of dust/bird shit contaminated insulator strings Details
 8Tender for supply of spares for 400kV ABB SF6 breaker Details
 8Tender for supply of 245kV AC filter CT & 145kV DC filter CT Details
 8Tender for work of PID testing of various tower various 132 kV, 220 kV & 400 kV lines Details
 8Tender for work of cold line cleaning (manually) of insulators strings of various 220/132/110kV EHV lines Details
 8Tender for rate contract for attending emergency breakdown and planned outage works on various 400 kV lines Details
 8Tender for supply of staircase step grills for crusher house Details
 8Tender for supply of lighting arrester for 220kV & 400kV switchyard Details
 8Tender for supply of various consumables, measuring instruments, tools tackles, CPVC and fasteners items Details
 8Tender for supply and repairing of various duct of ventilation system and overhauling of Various air centrifugal fan of ventilation & exhaust air system Details
 8Tender for supply of acid bulk tank for DM plant Details
 8Tender for work of complete overhauling of boilers with air pre heater Details
 8Tender for providing and laying NON shrink grouting material, yard work of micro levelling, yard Details
 8Tender for supplying, lowering, lying, jointing and testing of D.I.(K-9) pipeline shifting at 66kV S/S Details
 8Tender for supply of control panel spares of pump house Details
 8Tender for supply & application work of inside coating in pipelines Details
 8Tender for supply of various instruments for CHP & BOP Details
 8Tender for supply of various size of tool holders and its spares of vvarious lathe machines Details
 8Tender for work of replacement of CT/PT/CVT & LA of 220KV / 400kV switchyard Details
 8Tender for supply of EPR insulated flexible trailing power and control trailing cables Details
 8Tender for supply of flap gate assembly with motorized linier actuator for coal handling plant Details
 8Tender for supply of various fasteners and consumables Details
 8Tender for supply, erection, testing and commissioning of 220V DC, 510AH, KBH, Ni-Cd type battery set Details
 8Tender for supply, erection & commissioning of 11 kV lines with MVCC conductor & dismantling of existing open conductor 11 kV lines Details
 8Tender for supply of various types of contactors for LTMCC of 500 MW Details
 8Design, supply, installation, testing & commissioning of 220 V DC compartment type distribution board including Details
 8Tender for turnkey execution of design, supply, installation, testing & commissioning of RTCC panels of transformers Details
 
You can also click on Tenders for more
 
For reference purposes the website carries here the following newsclips:
 8
Global Power Demand To Cross 30,000 TWh By 2027, Renewables Set To Surpass Coal In 2026 Details
 
8Bengal coal-to-gas project moves ahead; global technology hunt begins Details
 
8India has a 46-GW nuclear gap. What will make private players invest Details
 
8CleanMax Signs Term Sheet With Envision Energy For 1.55 GW Wind Turbines Details
 
8EDF Power Solutions Signs PPA for 142.5 MW Diana Wind Farm Phase 1 in Brazil Details
 
8KP Green Engineering bags Rs 258 crore in fresh orders across segments Details
 
8Namo Bharat corridor to be powered by pioneering 110-MW captive solar plant Details
 
8AI, IoT Tech Drives $100M Energy Platform Details
 
8Renewable energy news: Amazon, Brookfield’s Lumara, Nala Renewables Details
 
8Rajasthan Launches 172-Unit Battery Project to Manage Solar Surplus Details
 
8India Gas Power Usage Jumps 340% on Record Grid Demand Details
 
8NTPC REL Wins 500 MW Renewable Energy Contract In SECI Auction At INR 6/kWh Details
 
8There’s a lot wrong in Indian RE sector Details
 
8ACME Solar Signs 130 MW RTC PPA With Northeast Frontier Railway At INR 4.35/kWh For 25 Years Details
 
8Oil India subsidiary signs MoU with four Municipalities of Haryana Details
 
8ACME Solar Commissions Phase III of 11.429 MW BESS Project in Rajasthan Details
 
8Gaurs Group buys 35 acre land parcels along Yamuna Expressway for Rs 700 crore Details
 
8India Renewable Energy Sector Hits 300 GW Mark Amid Grid Risks Details
 
8Transformers & Rectifiers stock jumps 7% on NPCIL order; firm enters nuclear power sector- key details to know Details
 
8Kashmir’s Power Paradox: Fix Losses before Raising Tariff Part-I Details
 
8Tata Power Renewables Commissions 190.5 MW FDRE Project in Rajasthan Details
 
8TARIL enters nuclear power sector with first transformer order from NPCIL Details
 
8NTPC Targets 244 GW Capacity By 2037 With INR 16.86 Lakh Crore Investment Plan Details
 
8Centre notifies rules mandating IST as single common time reference Details
 
8Scaling Wind: What rising capacity means for EPC, supply chains, and project execution Details
 
8Tata Power and Bhutan's DGPC Expand Clean Energy Partnership, Add 404 MW Nyera Amari Hydropower Project to Portfolio Details
 
8Adani Power posts record Rs 4,867 crore Q1FY27 profit on volume surge Details
 
8India Data Centres Enter A New Infrastructure Race Details
 
8NLC India Renewables Signs 25-Year PPA for 110 MW Solar Project with NCRTC Details
 
You can also click on Newsclips for more Details
8SECI's Ramagiri Wind Tender Extends 32 Days But Leaves the Portal Schedule Unsynchronised SECI's 45.6 MW ISTS-connected wind EPC package moved its bid deadline from 17 August to 18 September 2026, but the displayed document-procurement closure and tender-opening dates remain frozen at their original mid-August positions — creating three conflicting schedule signals on the same portal page. A Rs 8.4368 crore EMD locks in serious bidders even as turbine configuration, evacuation scope and performance guarantees remain undisclosed.

8NHPC's Link-3 Barrage Tender Raises Its Estimate 2.1% While Loosening Gate Qualification NHPC's Rs 2,301.20 crore Himachal Pradesh package increased its cost estimate and correspondingly raised turnover and bid-capacity thresholds, even as it simultaneously cut the vertical-lift-gate experience requirement by more than half and deleted a TRCM credential entirely. Eight deadline extensions totaling 110 days accompanied a shift from NATM to DBM tunneling terminology and a barrage-quantity rebalancing that favors concrete-intensive contractors over pure excavation specialists.

8JdVVNL's TNTW-796 Tender Swaps Its Own Geography Mid-Procurement JdVVNL's Rs 120.01 crore RDSS package originally assigned Bikaner's DD-I, DD-II and Khajuwala divisions to TNTW-796 in its NIT and first corrigendum, but the revised SBD, portal entry and BOQ now attribute Dungargarh and Nokha to the same tender number — with no explicit clause recording the swap. A 90.7% supply-weighted cost structure sits uneasily against an anti-front-loading rule that penalizes exactly that kind of allocation.

8NTPC's Pudimadaka WTP-GIS Tender Lets Old Contracts Inflate Their Way Into Qualification NTPC's lump-sum turnkey package bundling a water treatment plant, firefighting system and substation now allows bidders to escalate historical reference-contract values by 5% per year — potentially qualifying firms whose past projects fell short at nominal prices. The amendment doesn't clarify which of three possible reference dates (completion, execution, or commissioning) controls the calculation.

8GETCO's 495-Transformer Tender States Two Different Estimates 36.6% Apart GETCO's Rs 1,386.84 crore bulk transformer procurement lists that figure in its summary table while ITB Clause 1 independently states Rs 879.62 crore — a Rs 507.23 crore discrepancy that directly affects the mandatory 10% turnover-qualification threshold. Item-wise reverse bidding with pre-auction elimination of the highest qualified bidders adds another layer of price compression before contracts are even split among suppliers.

8APTRANSCO's MPLS-TP Network Tender Corrects a Zero-Value Estimate to Rs 139.44 Crore APTRANSCO's substation communication-network corrigendum fixed an originally blank estimated contract value while nearly tripling bid security from Rs 3 crore to Rs 8.79 crore, and introduced a turnkey EPC-plus-single-OEM route with joint and several liability between contractor and manufacturer. The payment clause still references 421 units even though the corrected total procurement — including mandatory spares — is 463.

8JdVVNL's TNTW-797 Tender Times Its Financial Openings by Which Package Bids Highest First JdVVNL's Rs 91.88 crore Bikaner package is one of eight RDSS tenders opened in descending order of estimated value, with each bidder's capacity reassessed after every prior L1 outcome — meaning winning one package can silently disqualify a bidder from financial consideration on another. A two-package participation ceiling includes an exception that preserves original bidding capacity if an earlier L1 result would otherwise push a bidder over the limit.

8NTPC's Darlipali Water-Ash Package Awards at an 11% Spread With Wildly Different Cost Allocations NTPC's Rs 261.71 crore award to Zuberi Engineering for Darlipali's make-up water and ash-disposal system beat the second-place bidder by 11.0%, but the real story sits in the BOQ line items — one competitor allocated just Rs 31 lakh to local transportation against the winner's Rs 11.19 crore, revealing radically different cost-loading strategies behind similar headline totals.

8NTPC's Mouda Ash Transport Tender Lets the Client Cut Volume to Zero With No Compensation NTPC's Rs 83.17 crore, 926,575-tonne ash-haulage package permits contract quantity reduction of up to 100% while explicitly excluding idle-equipment claims — meaning a contractor mobilizing a full fleet within 15 days could see the entire volume disappear. A bid more than 10% below NTPC's estimate triggers additional security equal to half the shortfall, discouraging aggressive undercutting on a package where GeM says "no arbitration" while the incorporated SCC names Delhi as the arbitration seat.

8NTPC's Lara Ash Tender Makes Bidders Prove They Own a Dump Site Before Opening Price Bids NTPC's corrigendum for its Lara ash-disposal package converts an existing site-control requirement into a hard techno-commercial gate — bidders must now formally declare ownership or a tie-up with an abandoned quarry or low-lying area before their price bid can even be opened. A 30-day post-award deadline for securing Gram Panchayat, Mining Department and pollution-board approvals treats any delay as contractor default, regardless of whether the delay originates with the authorities themselves.

8WCL's Bhatadi Overburden Tender Sets Output Targets Without Fixing Fleet Size WCL's Rs 1,307.45 crore, 72-month overburden removal package at Chandrapur specifies minimum daily production of 52,103 CUM in dry season and 20,841 CUM during monsoon but leaves the actual number of excavators and tippers entirely to the contractor — an output-based structure that excludes idle-equipment claims entirely. A one-week bid extension left the diesel-price-variation base date frozen at the original deadline, meaning the extra preparation time carries no corresponding escalation benefit.

8Mahagenco's Parli Fly Ash Sale Reviews Its "Three-Year" Contract Every Single Year Mahagenco's fly-ash offtake tender for Parli TPS advertises a three-year term but explicitly subjects it to annual review with continuation left entirely to the generator's discretion — meaning bidders committing to seven-year silo leases and monthly advance payments have no guaranteed multi-year revenue in return. A separate clause imports unrelated Nashik TPS litigation outcomes as grounds to amend or cancel this Parli-specific agreement.

8CCL's Chandragupta Coal Haulage Tender Leaves Zero Volume Cushion Over Two Years CCL's Rs 284.12 crore, 730-day coal transport package sets a daily target of exactly 12,000 tonnes that multiplies precisely to the full 87.60 lakh tonne contract quantity — leaving no buffer for disruption before shortfall penalties or termination become live risks. The GeM portal states no performance bank guarantee is required while the incorporated SLA mandates 5% security plus 3% retention, and a specimen work order banning all escalation contradicts the same document's monthly diesel-adjustment formula.

8GUVNL's 1,000 MW Battery Storage Tender Has a Security Clause With Nothing In It GUVNL's Rs 1,000 MW/4,000 MWh BESS procurement titles Clause 20 "Payment Security" but both its subclauses are marked "Not Used," leaving buyer-side payment protection entirely undefined despite demanding Rs 25 lakh/MW in developer-side PBG. A required 50-100 MW dispatch-group architecture doesn't obviously accommodate the tender's own 65 MW minimum bid size.

8GUVNL's Firm Renewable Power Tender Lets the Buyer Move Peak Hours Every Year GUVNL's 500 MW FDRE procurement replaced fixed 6-9am and 4-8pm delivery windows with movable bands — any three hours between 5-10am and any four hours between 4pm-midnight — reset annually at GUVNL's discretion, forcing developers to design storage for the worst-case combination rather than a known schedule. A revised third-party-sale penalty now uses whichever is higher between contract-tariff value and actual market revenue, closing a pricing loophole while sharpening downside risk for excess-power sales. Details
8UJVN's Lakhwar Hydro-Mechanical Design Tender Sets 20 BOQ Lines Against a 23-Item Scope UJVN's Rs 2.70 crore consultancy for pre-EPC design of Lakhwar's gates, penstocks and SCADA carries a price schedule that omits standalone billing for tender preparation and revised cost estimation — outputs Appendix III explicitly treats as separately payable. The same document simultaneously requires 120-day and six-month bid validity, and bars price adjustment in one clause while permitting it in another.

8TGGENCO's Naini-Yadadri Coal Logistics Tender Can't Decide If It's Moving 3 or 6 Million Tonnes TGGENCO's Rs 21 crore-EMD road-rail coal transport package states "3.0 million tonnes per annum for two years" in one clause and "approximately 3.0 million tonnes across two years" in another — a contradiction that could double or halve the real contracted volume. An exclusive-siding requirement demanding prior government-utility operating history, combined with a consortium ban, narrows the field to firms already embedded in the Khurda Road Division's coal network.

8ECL's RailTel Connectivity Award Closes 6.3% Above Its Own Displayed L1 Offer ECL's single-source, five-year Rs 145.47 crore managed-connectivity contract with RailTel shows a displayed offer of Rs 136.86 crore against an executed contract value Rs 8.61 crore higher — with no reconciliation supplied and no competing bid to benchmark against. GeM marks both EMD and ePBG as "No" even as the underlying conditions of contract require 5% performance security and 3% running-bill retention.

8UJVN's Second Lakhwar Design Tender Repeats the Same Radial-Gate Threshold Contradiction This companion filing on UJVN's hydro-mechanical design consultancy shows qualification clause 1.4.1(B)(iii) stating a 40% experience threshold while assigning it a rupee figure equal to 80% of the estimate — a discrepancy that could exclude or admit very different bidder pools depending on which figure controls. The tender also retains JV application forms despite explicitly barring joint-venture participation.

8NTPC REL's Nokhra Solar Tender Posts a Corrigendum 37 Minutes After Its Own Deadline NTPC Renewable Energy's 300 MW solar EPC package shows its first corrigendum timestamped at 15:37 on 22 June — just after the original 15:00 submission deadline on the same day — before seven total corrigenda and five addenda stretched the closing date by 60 days. A Rs 20 crore EMD locks in serious bidders even as land, evacuation and performance-guarantee terms remain undisclosed in the notice.

8NTPC's Farakka Pipeline-Bridge Assessment Is a Competitive Tender Wrapped Around a Named Consultant NTPC's structural-diagnostics assignment for ash-slurry pipeline bridges repeatedly identifies CSIR-SERC as the executing agency throughout its scope and payment clauses, despite running as a domestic competitive bid — and pays the entire preliminary-inspection fee in advance with no bank guarantee, no LD and no defect liability.

8WBSETCL's 22-Unit Transformer Tender Rebalances Delivery Without Extending Its Deadline WBSETCL's addendum cut the first delivery tranche from five transformers to three while pushing it 30 days later, keeping the 510-day completion date fixed — meaning later batches now carry a steeper production ramp. A pre-declared 14:8 split lets a second supplier win a share of the order, but only by matching the L1 price exactly.

8NHPC's Sawalkot Dam Tender Raises Its Estimate 5.6% and Moves Its Deadline 171 Days NHPC's Rs 5,416.94 crore Lot-1 package for the Sawalkot hydroelectric project quietly changed the plant's stated capacity from 1856 MW to 1800 MW mid-procurement while increasing turnover, working-capital and bid-capacity thresholds in step with the higher estimate. Thirty-four of 121 technical drawings were revised after original issue, and two separate documents both bear the label "Corrigendum No. 3."

8AEGCL's Umrangshu Financing EOI Attaches the Wrong Project's Supporting Documents AEGCL's EOI seeking a Rs 554 crore term loan for its 400/132 kV Umrangshu substation includes a prudential-norm attachment that actually belongs to an unrelated APDCL transformer-augmentation scheme, while the tender reference number itself alternates between "Tech-26" and "Tech-28" across different pages of the same notice.

8TNPGCL's North Chennai FGD Tender Keeps Extending a Procurement Its Own Notes Say Should Be Scrapped TNPGCL's seawater-FGD EPC package for two 600 MW units has moved its bid opening from April to August 2026 — a 143-day drift — even though an internal administrative note explicitly states that floated tenders "shall be revisited and fresh tenders shall be floated" after committee approval. The unchanged 24-month execution clock and deleted-escalation clause mean bidders keep refreshing offers for a process that may not survive in its current form.

8HPPTCL's World Bank Transformer Tender Ships With a Hidden Pricing Sheet From an Older Contract HPPTCL's ten-transformer procurement for Paonta Sahib, Kala Amb and Kunihar contains concealed spreadsheet tabs carrying historical rates and the name of a different contractor from an earlier turnkey package — a document-integrity failure sitting alongside an unresolved conflict over whether the current contractor's scope includes erection and commissioning or only supervision.

8BHEL's Darlipali Ash Handling Tender Locks Payment to Where Bidders Put Their Money BHEL's ash-handling EPC package for NTPC Darlipali penalizes bidders who price installation below 10% or civil work outside a 30-50% band by withholding that portion, non-interest-bearing, until physical milestones catch up — while a completeness clause makes any unlisted-but-necessary item the contractor's cost regardless of BOQ coverage.

8BHEL's Companion Darlipali Ash Tender Extends Three Times While Its Risk Stack Compounds A second BHEL filing for the same Darlipali ash-handling package shows three deadline extensions totaling 21 days against an unchanged 34-month delivery clock, with functional LD reaching 12% of contract price stacked atop a separate 5% delay-LD ceiling and layered security deposits — a cumulative exposure that may exceed what any single clause suggests.

8RECPDCL's Apta 765 kV Substation Tender Narrows to Two Bidders After a Documentation Rejection RECPDCL's Maharashtra transmission tender for the 765/400/220 kV Apta substation excluded Shivalaya Construction for failing to submit requested documents within the evaluation window — leaving only Adani Energy Solutions and Resonia to compete in a process that has already drifted 191 days past its original qualification-announcement date.

8SECI's One-Year Battery Storage Tender Threatens to Zero Out a Month's Entire Payment SECI's short-term 50 MW/100 MWh storage procurement requires an already-commissioned asset and imposes a sliding penalty scale where round-trip efficiency below 70% in any month eliminates that month's capacity payment entirely — on top of standard availability damages — while missing the 1 November 2026 start date triggers full PBG encashment and termination.

8SECI's NIWE Rooftop Tender Buries Its Core Technical Spec in a Separately Attached Annexure SECI's 100 kW hybrid rooftop replacement at NIWE's Chennai campus — requiring dismantling the existing plant and achieving seamless grid-to-island transition — defers the actual storage sizing, control architecture and performance-test methodology to an Annexure-B that isn't included in the main RfP, making bid comparability impossible without that missing document.

8POWERGRID's 765 kV Reactor Award Lands 11.3% Below Estimate With Freight Costs Still Unset POWERGRID's Rs 166.74 crore award to CG Power for 15 single-phase 765 kV reactors came in well under the Rs 187.90 crore indicative benchmark, but freight and insurance charges remain unpriced pending destination confirmation — meaning the apparent discount doesn't yet reflect the full delivered cost.

8POWERGRID's Bushing Tender Extended Ten Times Yet Still Contains Conflicting Delivery Dates POWERGRID's Rs 18.144 crore award to Hitachi Energy for 48 EHV bushings moved its closing date across ten separate extensions spanning 71 days while simultaneously cutting turnover and liquidity qualification thresholds by 25% each — yet the final award record still shows an 18-month consignee-table deadline alongside a corrigendum-amended 24-month schedule that were never formally reconciled. Details
8Daily Excel covering new tenders and all published updates including corrigendum, amendment, addendum, clarification and status revisions, along with technical and financial bid opening, evaluation completion and final award actions including AOC and LOA issuance.
Click on Reports for more Details
8CEA’s coal-stock reports show stocks at linked thermal power plants fell from 25.045 million tonnes on Aug 24, 2026 to 24.387 million tonnes on Aug 26, 2026, a two-day decline of 659,000 tonnes or about 2.6%. Details
8Pritika Engineering Components signed a memorandum of understanding with Spark Grid for solar-power supply over 25 years. Details
8GK Energy received a letter of empanelment from a state government-owned distribution utility for 100,000 one-kilowatt rooftop solar systems, aggregating to 100 MW. Details
8ICRA reaffirmed Radiance MH Solar Power’s BBB-plus rating and revised the outlook to Stable from Negative on Rs 11.66 crore of term loans. Details
8ICRA kept Southern Power Equipment Company’s Rs 10-crore bank facilities at B-minus with a Stable outlook and A4 in the issuer non-cooperating category. Details
8Rajasthan’s electricity regulator held that the cut in GST on renewable-energy equipment from 12% to 5%, effective Sept 22, 2025, is a change-in-law event under the state’s power-purchase agreements. Details
8SRPC’s meeting record says regional grid bodies are planning a 15-day shutdown of the ±500-kV Talcher–Kolar HVDC bipole in November for NHAI diversion work and maintenance. Details
8WRPC’s renewable-energy subcommittee recorded repeated evacuation trips linked to insulator failures, flashovers and protection problems at western renewable pooling stations. Details
8WRLDC says missing real-time telemetry prevents it from comparing the combined load on under-frequency-relay feeders with the load assumed when the automatic protection scheme was designed. Details
8Reports from the Uttarakhand State Load Despatch Centre recorded demand of 52.94 million units on Aug 26, 2026 against total availability of 52.39 million units, leaving a 0.55-million-unit gap. Details
8Southern Regional Load Despatch Centre (SRLDC) reports show the region met an evening peak of 57,266 MW on Aug 27, 2026 without recorded peak shortage and supplied 1,372.38 million units during the day. Details
8CEA’s July 2026 statement covers 224,157.51 MW of coal-fired capacity and shows all-India coal receipts rising to 73.2 million tonnes from 64.1 million tonnes a year earlier, an increase of about 14.2%. Details
8CERC directed Telangana’s distribution companies to pay Rs 62.83 crore of admitted late-payment surcharge within two weeks. Details
8NTPC told CERC that unit-shutdown events rose to 118 in FY26 from the usual 15–16 a year. It is seeking recovery of auxiliary power consumption and transmission charges incurred during shutdowns, along with relaxation of start-up-oil norms. Details
8WRLDC found the system N-1 compliant during the proposed 765-kV Kotra–Tamnar double-circuit outage for APL Raigarh’s railway diversion work. Details
8Jaipur Vidyut Vitran Nigam reported a Rs 282-crore profit after tax in the first quarter of FY27, reversing a Rs 541-crore loss a year earlier. Details
8The Ministry of New and Renewable Energy (MNRE) said India’s installed non-fossil capacity had reached about 302–303 GW by Aug 27, 2026, up from 80.3 GW twelve years earlier. Details
Current Central Electricity Regulatory Commission proceedings on payments, connectivity, project schedules and tariff claims

8CERC admits Angul transmission petition to create lender security
8Adani solar projects press for payment of GST change-in-law claims
8CERC reserves POWERGRID Bikaner delay-and-cost case for order
8CERC presses CTUIL to finish delayed KPS1 committee minutes
8CERC tells CTUIL to act on GRT Jewellers bank guarantees
8AMPIN pursues 199 MW of non-solar-hour access
8Interim protection continues for 300-MW Bikaner solar project
8CERC orders fuel-wise data in long-running Reliance dispute
8DB Power emission-control tariff cases move to November
8CERC adjourns ReNew financial-closure timeline dispute to October
8WRLDC and CTUIL claims against MPSEZ move to late October
8Vena Energy wind change-in-law case advances to October
8Teesta power-contract disputes get dedicated hearing date
8JSL’s Rs 19.05-crore payment claim enters fresh filing round
8CERC moves NTPC-KSEB review petition to October hearing Details