All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


Sep 2022

8An Indian generator has issued Letter of Intent (LoI) to an EPC firm for 1200 MW Pooling Sub Station under a single EPC basis
Click on Reports for more
Details
8A discom gets approval to revoke or cancel the source approval granted to GMR Bajoli (60 MW)
8Find out more
Click on Reports for more
Details
8Voice over Internet Protocol (VoIP) is the reliable mode of voice communication
 
8NLCIL are requested to fall in line with VoIP protocol instead of using wireless sets
 Click on Details for more
Details
8A constituents are required to update the healthiness of batteries regularly and properly
 Click on Details for more
Details
8NOC from the Inland Waterway Authority of India has been granted.
8Forest clearance stage -1 and stage 2 have been granted by the DFO.
8Engineering works are in progress for the S/S works.
8Approval from civil aviation, defense, and PTCC have been granted.
8Fabrication, erection and installation works for P/S is yet to be started.
8RFQ for the ACSR moose conductor works package is likely to be floated in October 2022.
Click here for more details Details
8Hydrology report has been approved by CWC.
8PPA has been signed with State Government.
8Biddings under progress for the Civil works package. Major civil works contractors have qualified for technical bids.
8RFQ for the HM works package is likely to be floated in November 2022.
Click here for more details Details
8Mechanical completion is in progress for BTG.
8Erection and installation of ESP have been completed and the PG test is about to conduct.
8Sub-contractor has been selected for the chlorine dosing system.
8Civil and structural works have been completed for the ball mill and absorber system.
8RFQ for the limestone and gypsum handling plant package is likely to be floated in Q4 2022.
 Click here for more details Details
For reference purposes the website carries here the following tenders:
 
8Tender for supply and installation of 44 nos 5 star 2TR (copper) inverter split type air conditioner with voltage Details
 
8Tender for the supply of 25 KVA distribution transformer Details
 
8Tender for  procurement of 3 phase 11KV/433-250V, 63 kVA  distribution transformers Details
 
8Tender for the supply of LT XLPE arn cable of size 4CX25 sq. mm Details
 
8Tender for annual maintenance contract for hotline works of 400kV, 220kV and 132kV transmission lines Details
 
8Tender for development of distribution infrastructure Details
 
8Tender for loading, transportation, unloading of coal from surface coal yard of tubed coal mines Details
 
8Tender for installation and commissioning of different types of new led light fittings Details
 
8Tender for design,manufacture, testing, supply, delivery, erection & commissioning of control & relay panels Details
 
8Tender for complete cleaning, collection of garbage, rubbish, ash, coal dust Details
 
8Tender for work of consultancy for establishing DFAES (dryf fly ash extraction system) Details
 
8Tender for overhauling of different rating pumps, breakdown maintenance of different size of water pipe line Details
 
8Tender for procurement of different size of valves, pipe Details
 
8Tender for ARC for metalizing of motor bearing housing, rotor shaft journal and trueness checking along with dynamic balancing of rotor Details
 
8Tender for design works for foundation strengthening of 132kV ND type towers and design validation of 400 kV double circuit towers Details
 
8Tender for providing and fixing of 22/33kV porcelain/polymer type LAs Details
 
8Tender for supply, laying, fabrication, fitting and fixing of concertina coil/barbed wire and lighting poles with fixtures at 132/33 kV Details
 
8Tender for AMC for routine maintenance work of Refilling & Providing New spares of existing fire extinguishers Details
 
8Tender for proposal for placement of fresh biennial maintenance contract for maintenance job Details

8Tender for construction work of rain harvesting system Details
 
8Tender for providing and erecting W metal beam crush Details
 
8Tender for salvaging of P and M items installed Details
 
8Tender for transport of 1.5 L Te coal from main coal stock yard Details
 
8Tender for supply of AC spares for CAT 992K payloader Details
 
8Tender for supply of swing transmission Details
 
8Tender for stone dusting / spreading along travelling / haulage route and belt roadway in underground Details
 
8Tender for procurement of forged hammers for ring granulators Details
 
8Tender for repairs and maintenance for inner surface of clarifloculator at DM plant Details
 
8Tender for purchase of spares of make vacuum pump Details
 
8Tender for procurement of spare parts of ring granulators Details
 
8Tender for shifting of pipeline Details
 
8Tender for engagement of agency for carrying out operation and maintenance of 33 kV network excluding 33 KV sub-station Details
 
8Tender for secial repairs and renovation of existing 33 11 KV substation Details
 
8Tender for procurement of 1100V, 4x25 sqmm LT UG PVC armourd aluminium power cable Details
 
8Tender for procurement of 43000 nos. of 8.0m 200Kg WL PSC poles Details
 
8Tender for procurement of street light junction box Details
 
8Tender for provide technical and non technical resources under electric supply Details
 
8Tender for transportation of 1500000 MT coal Details
 
8Tender for procurement of 6.6 kV motor Details
 
8Tender for procurement of ferrous items Details
 
You can also click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Electric planes are coming: Short-hop regional flights could be running on batteries in a few years Details
8Adani, Tata, Mahindra, Hero rake in close to $4 billion for their renewables businesses Details
8Mizoram to switch to smart prepaid power meters from December Details
8Punjab extends deadline to apply for tube well electricity load enhancement till October 23 Details
8Karnataka: CAG report cites discrepancies for delay in electrification of 204 villages Details
8GE Appoints Repsol's Zingoni as CEO of Power Business Details
8Hertz Plans to Order Up to 175,000 Electric Vehicles From GM in Next 5 Years Details
8PSPCL revenue dips after 0-bill scheme Details
8EU Countries Want Option to Claw Back Coal Plants' Revenues - Draft Details
8BHP coal mine workers in Australian state set to vote on industrial action Details
8California regulator sees 2035 EV mandate as 'candy spot' Details
8Energy war likely to singe the economy Details
8A tool that identifies gaps, makes energy access a reality Details
8EVolt India, Indian Oil Corporation tie up for installation of 75 EV charging stations Details
8Coal smuggling scam: Two key Bengal IPS officers again summoned to Delhi by ED - Kolkata News Details
8Hero MotoCorp, HPCL partner to set up EV charging infrastructure Details
8EV maker Altigreen launches first retail dealership in Bengaluru Details
8Ola Electric Cuts 200 Jobs; Plans To Hire 3,000 To Focus On Non-Software Engineering Domains Details
87 Years Since India’s Renewable Energy Push, Where Does The Country Stand? Details
You can also click on Newsclips for more

 

Details
8Government proposes to bring out a quality control manual for small grid connected Rooftop Solar PV System to ensure quality of installation and a structured mechanism for monitoring of installations
8The quality control manual will serve as the guide to ascertain compliance in quality of design, manufacturing, installation operation & maintenance of Rooftop Solar PV system.
8Find out the silent feature of this mechanism
Click on Reports for more
Details
8Powergrid had sought a shutdown extension at its HVDC Kolar station
8Find out the new schedule
Click on Details for more
Details
For reference purposes the website carries here the following reports: 
8Get the updated AFC for 2022-24 tariff period for transmission asset under “Conversion of Fixed Line Reactors into Switchable Line Reactors in the Northern Region” Click on Reports for more
8Get the review of the tariff for the Indira Gandhi Super Thermal Power Project (1500 MW) Click on Reports for more
8Get an update of capex plans for Cogeneration Power Plants: Business opportunities ahead for vendors. Click on Reports for more
8Renewable Energy in Smart Cities: Find out the challenges and opportunities ahead. Click on Reports for more Details
8The Grid operation during August saw a massive variation in wind generation
8It was a wake-up call of sorts for everyone
Click on Details for more
Details
8The N-1 violation of Jindal ICTs was observed during high generation at Yeramarus TPS and Pavagada solar power complex
8The flow on 400/230kV NNTPS ICTs and 400/230kV NLC ICTs were heavily loaded upto their N-1 Limit due to delay in the commissioning of the Ariyalur S/s and its associated transmission system
8Find out what is being done deal with it
Click on Details for more
Details
8State needs to plan the LGB without leaning more on market and leaning on ISTS
8Find out the way to manage of power deficit
Click on Details for more
Details
8Solar generation at Pavagada has been reduced from 1700 MW to 992 MW due to the tripping of the 400 kV Pavagada-Tumkur line.
830% of the generation loss was through trippings rather than a ride-through, and this is a matter of serious concern
8So, a proper analysis is needed to be carried out, and developers kept in the loop.
Click on Details for more
Details
8The regulator had sought 15 minute time-block wise generation data from wind generators
8But wind generators are unable to provide block wise generation data as the ABT meters were sealed by PGVCL
8Find out more
Click on Reports for more
Details
8Get the update of capex plans for coal mining projects
8For vendors, there are business opportunities ahead.
Click on Reports for more
Details
8JMC Projects (India) Ltd gets approval to raise funds of up to Rs 200 crore on private placement basis
Click on Reports for more
Details
8A global EPC company has secured new orders of Rs. 1100 crores
8Find out more
Click on Reports for more
Details
8The past 10 years have seen successful and smooth energy collaboration between Bangladesh and India
8New horizons are now opening up
Click on Reports for more
Details
8The detailed survey and investigation have been completed for the T/L.
8Approval from PTCC, civil aviation, and defense is in the process.
8Several meetings have been conducted with the landowner for land acquisitions.
8RFQ for the EPC package for transmission line works is likely to be floated in October 2022.
Click here for more details Details
8Hydrology report has been approved by CWC.
8Forest clearance stage -1 is pending at the regional office.
8Drilling works at the site are in progress and drifting works are yet to be started.
8RFQ for the PMC works package is likely to be floated in November 2022.
Click here for more details Details
8Forest clearance stage -1 has been accorded by the DFO but stage -2 is pending at the nodal office.
8EC for the same has been granted by the MoEF.
8Pre-bid meetings for the same are yet to be conducted for the civil works package.
8RFQ for the HM works package is likely to be floated in Q4 2022.
Click here for more details Details
8Civil and structural works of SG are in the advanced stage for completion.
8Slow progress of civil works by the sub-contractor.
8EPC has de-scoped certain works from the sub-contractor.
8NDCT contract has been terminated and its work is at a standstill condition.
8Detailed design of FGD works has been approved.
8RFQ for the Absorber system package is likely to be floated in October 2022.
 Click here for more details Details
For reference purposes the website carries here the following reports: 
8UPPCL gets extension to clear outstanding dues Click on Reports for more
8Get the review of the tariff for the Mauda Super Thermal Power Station-I (1000 MW) Click on Reports for more
8MPSEZ Utilities Ltd: New owner ahead Click on Reports for more Details
 Annual fixed charges are allowed for 2022-24 tariff period for following assets under "Sub-station Works Associated with Strengthening of Transmission System beyond Vemagiri" in the Southern Region
8400 kV line bays and 50 MVAR Switchable line reactors
8765 kV line bays and 240 MVAR Switchable line reactors
Click on Reports for more
Details
8The original LOA for AMR phase-3 was awarded to M/S TCS in Oct-2016.
 
8But the comprehensive AMC has been completed on 31-Aug-2022
 
8So region need renewal of AMC support to continue the AMR operation
 Click on Details for more
Details
8Here is an update of capex plans for captive power projects in grain-based plants
 Click on Reports for more
Details
8Parampujya Solar Energy Pvt Ltd had sought relief on account of force majeure events leading to the delay in commissioning of its solar power project
 
8But regulator has set aside the request of the generator
 
8Find out why?
 Click on Reports for more
Details
8A Discom has decided to invite bids to install a Battery Energy Storage System (BESS)
 
8But the regulator has imposed some conditions
 
8Find out more
 Click on Reports for more
Details
8The RPO targets may be met by way of purchasing RE Power or REC
 
8Find out more
 Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
 
8Tender for civil & architectural worksfor FGD project Details
 
8Tender for erection & commissioning of power cycle piping Details
 
8Tender for planned service maintenance during annual shut down and emergency service during breakdown of digital static excitation system Details
 
8Tender for procurement of 1,21,000 nos. of PSC poles Details
 
8Tender for design, manufacture, supply, testing, laying and commissioning of 132kV single core 630mm2 XLPE copper UG cable Details
 
8Tender for running and maintenance of sewerage treatment plants Details
 
8Tender for estimate for providing 22 KV HT Line to proposed 63 KVA , 22/0.4 KV s/stn Details
 
8Tender for retrofitting/ upgradation of existing CO2 based fire protection system Details
 
8Tender for supply, installation and commissioning of non-contact radar level sensor Details
 
8Tender for damp proofing of the lift shafts by providing and fixing of ACP-FR Sheet (3 mm thick) Details
 
8Tender for supply installation and commissioning of automatic continuous drum composter with integrated crusher Details
 
8Tender for design, supply, installation, testing and commissioning including 5 years operation, comprehensive warranty and maintenance of semi integrated led based solar street lighting systems Details
 
8Tender for supply of solar light  Details
 
8Tender for procurement of 50MVAR 400KV line reactor and 145KV neutral grounding with oil Details
 
8Tender for rate contract for maintenance of cooling tower  Details
 
8Tender for hot line maintenance of various equipments installed in 400 and 132 KV switchyard Details
 
8Tender for supply of 02 nos. transformer oil filter machine Details
 
8Tender for supply of ION exchange resins   Details
 
8Tender for round the clock work of assitance in various operation of ETP plant Details
 
8Tender for supply,installation testing and commissioning of dual channel static excitation system Details
 
8Tender for fabrication of various lengths of 11kV A poles and 14m 33 kV A poles Details
 
8Tender for annual overhauling of boiler  Details

8Tender for supply of 220KV single-core 1200Sqmm copper XLPE insulated power cable Details
 
8Tender for procurement of slag crusher and clinker grinder Details
 
8Tender for balance civil works of wagon tippler and conveying plant Details
 
8Tender for supply of economiser I and II coil for stage-I boiler Details
 
8Tender for replacement of metallic expansion joints of different sizes of flue gas duct Details
 
8Tender for replacement of slew ring assembly of stacker re-claimer and associated work in CHP plant Details
 
8Tender for operation and maintenance of weighbridge, other associated work and management of supply / sale of dry fly ash generated Details
 
8Tender for procurement of light diesel oil LDO for various power plants Details
 
8Tender for breakdown and routine maintenance of HP / LP valves, soot blowers Details
 
8Tender for supply of RAH /APH (rotary air pre heater) Details
 
8Tender for supply of gear box for vibrating grizzly feeder Details
 
8Tender for work of providing & fixing of high voltage insulating mat Details
 
8Tender for the work of providing and fixing of oil temperature indicator & winding temperature indicator for power transformers Details
 
8Tender for work of repairing of ABT PC monitor, installation of ABT meter software and resolving various communication related issue Details
 
8Tender for manufacturing, testing and supply of 25/31.5 MVA, 66/11 KV power transformer Details
 
8Tender for procurement of digital weighing machines Details
 
8Tender for supply, erection and commissioning works for electrification in entire ash pipe rack Details
 
8Tender for work of annual maintenance contract (AMC) & attending emergency breakdown work of various 220 KV & 132 KV EHV transmission lines Details
 
8Tender for supply, erection and commissioning of 220V, 500AH battery set at 400KV Details
 
8Tender for work of cold line washing (manually) of disc/PLR insulators of various tower locations of 400KV transmission line Details
 
You can also click on Tenders for more
For reference purposes the website carries here the following newsclips:
 
8Mahindra Group's Susten deal spotlights India's renewable energy opportunity Details
 
8Electric Vehicles Row Overshadows S.Korean President's First U.S. Visit Details
 
8Sri Lanka to seek Indian or Chinese credit line for solar panel imports: Energy Minister Kanchana Wijesekara Details
 
8KKR invests in Hero Future Energies in $450 mn transaction Details
 
8Olectra bags order for 123 electric buses from Thane transport body Details
 
8What has happened to Puerto Rico's power grid since Hurricane Maria? Details
 
8Vikram Solar signs 350 MW module supply deal with US customer Details
 
8Global climate goals threatened by lack of clean tech collaboration – IEA Details
 
8Midwestern partnership backs hydrogen as clean energy source Details
 
8Faraday Future Shareholder Sues EV Startup for Removal of Two Directors Details
 
8Iveco showcases prototype of large hydrogen van developed with Hyundai Details
 
8Oil Min for review of windfall tax; wants some fields exempt Details
 
8Govt to pool wind energy bids to diversify projects Details
 
8Power for All Distributed Renewable Energy Job Report Sees Strong Post-Pandemic Growth Details
 
8Coal India to sell around 90 mt coal through e-auction route Details
 
8Pass Electricity Bill now Details
 
8Tata Power's Solar Energy Solutions are set to Power Rural India into the Future Details
 
8Adani Green commissions 325-MW wind power project in Dhar district of MP Details
 
8Azure Power signs agreement for 600 MW of First Solar’s high-performance modules Details
 
8Government to exchange as much as 30,000 previous buses in electrification drive Details
 
8Delhi govt planning to install over 5,000 kerbside EV charging points in next 3 years Details
 
8Assam: Three workers die in illegally operated coal mine mishap Details
 
You can also click Newsclips for more

Details
8The North Karanpura unit of NTPC was planned to be synchronized by March 2022
 
8But the unit synchronization has been delayed
 
8Find out why?
 Click on Details for more
Details
8A Land acquisitions have been completed. Erection and installation works are in progress for the S/S.
8Fabrication of the lattice tower has been completed and stringing works are yet to be started.
8RFQ for the P/S works package is likely to be floated in Q4 2022.
Click here for more details Details
8Forest clearance stage -1 and stage -2 have been approved by DFO.
8EC has been granted by the MoEF.
8PMC has been selected.
8Civil works package-1 contractor has completed the mobilization of equipment at the site.
8RFQ for the civil works package (Lot- 2) is likely to be floated in December 2022.
Click here for more details Details
8The forest clearance stage -1 has been granted by the DFO and stage 2 is pending at the nodal office.
8The PMC has been selected for the project.
8The preparation of DPR has been approved by the CEA.
8RFQ for the civil works package(Lot-1) is likely to be floated in Q4 2022.
Click here for more details Details
8Erection of TG for units -1 and 2 have been completed and the PG test is yet to be conducted.
8 Stacker reclaimer works have been completed.
8The erection of the absorber system and ball mill work is in the advanced stage for completion.
8RFQ for the DeNOx system package is likely to be floated in October 2022.
 Click here for more details Details
For reference purposes the website carries here the following tenders:
 
8Tender for removal and repair of trash rack panel Details
 
8Tender for supply of vacuum circuit breaker Details
 
8Tender for procurement of different types of welding electrodes Details
 
8Tender for procurement of splicing machine along with other fiber tool kit Details
 
8Tender for bearings inspection, overhaul of LPT and other turbine components, overhaul of generator Details
 
8Tender for refractory repair works in FGRS ducts of unit 1&2 boiler Details
 
8Tender for annual maintentanance contract for operation of HVAC system & air washer Details
 
8Tender for overhauling works in air-preheaters and fans Details
 
8Tender for EPC package of biomass pelleting facility Details
 
8Tender for consultancy service for preparation of feasibility report for installation of a new multi- fuel fired boiler Details
 
8Tender for consultancy service for preparation of feasibility report for erection and commissioning of a new turbo-generator Details
 
8Tender for development of 02 nos. reject coal yard Details
 
8Tender for works contract for erection and transportation of poles paving of HT/LT lines Details
 
8Tender for siemens make westronic based electronic interlocking system Details
 
8Tender for construction of rcc road at 132kv Details
 
8Tender for work contract for operation and mantenance of ash handing plant Details
 
8Tender for loading and transportation of coal Details
 
8Tender for supply of heavy duty fiber glass Details
 
8Tender for supply of thermo vision camera Details
 
8Tender for supply of insulating mats Details
 
8Tender for supply of pole mounted meter box for housing of energy meters Details
 
8Tender for supply of timer based VCB trip relay Details
 
8Tender for award of contract for up gradation of existing33 11kV outdoor substation Details
 
8Tender for work contract for routine maintenance and operational work of dam filling pumps Details
 
8Tender for supply of industrial and protective rubber Details
 
8Tender for repairing of damaged column of 170Te work shop along with supporting structure and EOT crane Details
 
8Tender for providing chain link fencing around coal stock yard Details
 
8Tender for carrying out structural stability tests on conveyor belt structure, RC feeder, feeder breaker Details
 
8Tender for design, manufacture, supply, installation and commissioning of brake gear for hydraulic power Details
 
8Tender for auction dispose off the various type of scrap materials vehicles as is where is bases lying at divisional store of sr. executive engineers electrical Details
 
8Tender for biennial contract for upkeeping and deweeding of switchyard Details
 
8Tender for biennial operation & mechanical maintenance (O&MM) of ash handling system Details
 
8Tender for procurement of soft iron and graphite seal rings for boiler Details
 
8Tender for procurement of CPVC fitting pipe Details
 
8Tender for procurement of APH tubes for stage-I boiler Details
 
8Tender for SITC of nitrogen injection fire protection system Details
 
8Tender for annual rate contract for maintenance as and when required basis for rubber Details
 
8Tender for procurement of grinding roller & bullring segment for coal Details
 
8Tender for engagement of coal liaisoning agency for loading supervision and third party sample witnessing at loading point for coal Details
 
8Tender for procurement of boiler tube Details
 
8Tender for annual work contract for the work of supply and application of insulation in boiler and turbine Details
 
8Tender for annual contract for routine breakdown annual maintenance work of roller coal mill type MVM 32R coal burner panel gravimetric coal feeder coal pipe Details
 
8Tender for annual rate contract for servicing & overhauling of 22 & 33 KV VCB of ABB make with required spares at various substations Details
 
You can also click on Tenders for more

For reference purposes the website carries here the following newsclips:
 
8Haryana bags award in energy sector Details
 
8Triveni Engineering, Hercules Hoists soar up to 20% on heavy volumes Details
 
8Rajasthan gears up meet power demand amid coal supply disruption from Chhattisgarh Details
 
8Honda expected to launch its first electric scooter in India soon, To cost less than Activa Details
 
8Resurgent Power completes acquisition of South East UP Power Transmission Company via insolvency process Details
 
8Engineers Power Sector to protest against Electricity Amendment Bill on Nov 23 Details
 
8No highway tax, registration price on native EVs: Policy Details
 
8Andhra Pradesh: Energy demand may touch 250 MUs per day by March 2023, says APERC chief Details
 
8Amara Raja bets on EV sector; expects turnover to touch Rs 3,000 cr by 2025 Details
 
8E-vehicle sales see sharp uptick in Rajasthan Details
 
8AIPEF gives call to protest against Electricity Amendment Bill on Nov 23 Details
 
8Discoms outstanding late payment surcharge dues dip sharply to Rs 713 cr Details
 
8Inox Green Energy plans to launch Rs 740-cr IPO in next 30-45 days: CEO Kailash Tarachandani Details
 
8Ontario pension fund to buy 30% in Mahindra’s renewable arm Details
 
8Jitendra Singh to lead delegation for Global Clean Energy Action forum Details
 
8Most hydel, thermal power projects wallowing in time overruns Details
 
8Almost 50% coal blocks allotted to power PSUs face delay in prodn: Report Details
 
8Coal Power Plants get extra life, 12 of them may impact public health in Delhi Details
 
8Govt action against discoms yields results; outstanding dues towards gencos fall to Rs 713 crore from Rs 5,058 crore Details
 
8CIL may flare up coal prices energy war singe economy Details
 
8Telangana’s power sector sees remarkable progress, has installed capacity of 17,305 MW Details
 
8Centre, states tussle over a centralised market for electricity Details
 
You can also click on 
Newsclips for more

Details
8The generation performance of wind assets has witnessed a significant decline over FY20-FY22, in contrast to the steady performance put up by solar assets
 
8Wind power generation for only 11% and 17% portfolio was above the designed estimate in FY21 and FY22 respectively
 
8The operational performance of solar projects has been relatively stable as compared to wind projects
 
8Solar power capacity for around 50% of the portfolio was above the designed estimate in the last three years
 
8Find out the issue faced by wind generator
 Click on Reports for more
Details
8The company is undertaking a greenfield capacity expansion in LT, HT, and EHV cables with capex of Rs. 800 crore over 3-4 years
 
8Overhead electric transmission networks continue to move underground in large cities, which would induce demand for cables
 
8Find out more
 Click on Reports for mor
Details
8EC should be obtained for all the mining related activities within a mining block/ project as per the approved DPR
 
8Baseline for EC can be prepared well in advance by CMPDIL to save time. This should be done across all projects
 
8The time between opening of tender and issuance of LoA can be squeezed and the norms can be set at 150 days in place of the presently considered 180 days for all tenders
 
8Find out more
 Click on Reports for more
Details
For reference purposes the website carries here the following reports: 
 
8Indian generator commissions 325 MW Wind Power Plant Click on Reports for more
 
8Smart Grid in India: Get updates on policy, regulations & standards here Click on Reports for more
 
8Olectra Greentech Ltd gets LOA to supply of Electric Bus Click on Reports for more
 
8SmartCity (Kochi) Infrastructure gets relief Click on Reports for more
 
8REC Ltd gets new director Click on Reports for more
 
8Regulator step-down the request of Rajasthan Discoms Click on Reports for more Details
8An EPC firm has orders worth Rs. 531 crores for developing various solar power projects with cumulative capacity of over 121 MWp
 
8Find out more about this company and projects
 Click on Reports for more
Details
8The amalgamation will result in consolidation of generation of power business
 
8The amalgamation will also result in better leveraging of facilities, infrastructure and resources
 
8Find out more
 Click on Reports for more
Details
8A three tier Quality Control Mechanism (QCM) has been developed
 
8These can be used by stakeholders to ensure quality and performance of the Solar PV Water Pumping Systems installed beyond MNRE Schemes
 
8Find out the silent feature of this mechanism
 Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for works contract to carry out HVDS work in 11KV Details
8Tender for procurement and retrofit of 245 KV, 3150 Amp SF6 circuit breaker Details
8Tender for 3D seismic and resistivity imaging survey for coal Details
8Tender for procurement of spares for pump Details
8Tender for work of hot spot scanning of various transmission line & sub-station Details
8Tender for work of fabricaton of platform for 400KV circuit breaker of 400KV switchyard Details
8Tender for vulnerability assessment and penetration testing audit Details
8Tender for supply, erection/installation and commissioning of submersible pumps Details
8Tender for job contract for fabrication and erection of ventilation ducts Details
8Tender for running contract for repair maintenance and replacement of G I distribution pipe lines Details
8Tender for purchasing of centrifugal filtering machine for the filtration of ISO VG-46 lubricating oil including trolley, feed discharge pump, heater and control panel Delete
8Tender for works contract for supply and erection of new mirror bay by laying 33KV UG cable Details
8Tender for supply of HP IP LP turbine spares Details
8Tender for running works contract for implementation of HVDS, agri feeder Details
8Tender for comprehensive AMC of HI- path 4000 EPABX system Details
8Tender for work of operation of railway yard, maintenance of railway track and electrical, mechanical maintenance Details
8Tender for logistics contract for transportation of coal Details
8Tender for construction of 132 KV single core XLPE cable for 132 KV single circuit transmission line Details
8Tender for construction of 33/11kV S/S Details
8Tender for work of installation and commissioning of DC voltage monitoring system Details
8Tender for work of AMC for attending emergency breakdown, scheduled works and other urgent works on various EHV lines Details
8Tender for AMC for work of repairing, servicing and alingnment of various make 2201132/33kV isolators Details
8Tender for work of providing/fixing special type maintenance free earthing with extra high current carrying capacity earth pits for various 132 kV lines Details
8Tender for work of providing & fixing of advanced cable transit system at 400/220 KV substation Details
8Tender for comprehensive AMC of air conditioning system Details
8Tender for work of renovation & additional pit of earthing system in 220KV switchyard Details
8Tender for design, engineering, supply & procurement, erection, testing, commissioning and O&M for 5 (five) years of grid connected solar PV power plant Details
8Tender for design, testing, manufacture, supply & stringing of high temperature low sag (HTLS) Details
8Tender for balance civil works for addl. 160 MVA 220/66 KV T/F plinth and allied civil works Details
8Tender for work of sewerage treatment plant in electrical section Details
8Tender for prov. SOP to WSS 11 KV HT line Details
8Tender for development of distribution infrastructure for loss reduction Details
8Tender for the work of augmentation of 33/11 KV,1x6.3 MVA s/stn   Details
8Tender for work of construction of control room & chain link mesh fencing other civil work Details
8Tender for award of contract for up gradation of existing 33/11kV outdoor substation Details
8Tender for procurement of various plates for ring granulator Details
8Tender for supply of 11KV & 22KV oil filled DTs Details
8Tender for procurement of submersible pumps for slurry Details
8Tender for deployment of service personnel for air pre-heater Details
8Tender for job contract for maintenance overhauling of CHP electrical system Details
You can also click on Tenders for more
For reference purposes the website carries here the following newsclips:
8BCG bets on hydrogen, says EVs alone not adequate, need to cut emission across ecosystem Details
 8Shell to install over 10,000 EV charging points in India by 2030 Details
 8Renewable Energy India Expo To Bring Rs 800 Crores Investment Opportunity For Biogas Details
 8Valuations factor in multiple positives for Power Grid Corporation Details
 8Nepal’s skewed hydropower ambitions   Details
 8PM to inaugurate NE's biggest power plant and only greenfield airport in Arunachal Details
 8Spike in solar, decline in coal, India witness transition in renewable energy Details
 8Sanitation workers get free electric two-wheelers from Karnataka CM | Bengaluru Details
 885 EV charging stations installed in 82 areas; 92 more to be up by Dec: MCD Details
 8PM Modi to visit Arunachal; dedicate airport, hydro electric power project Details
 8Electric vehicle battery makers likely to get more time to meet safety norms Details
 8Hero MotoCorp all set to launch first EV model Vida next month Details
 You can also click on Newsclips for more
Details
8The forest clearance (FC) stage-1 was accorded but the stage-2 is pending at the DFO
8Preparation of DPR has been completed and it is yet to be approved by the CEA.
8The public hearing for the project has been completed.
8PMC has been selected for the project.
8RFQ for the EPC package for the civil and HM works package is likely to be floated in the second half of December 2022.
Click here for more details Details
8The EAC has rejected the additional ash dyke for the Stage-II project.
8Pilling and foundation work at the BTG sites have been completed.
8Civil and structural works at the BOP sites are in progress.
8Sub-contractor selected for stacker reclaimer package
8RFQ for the PT Plant package is likely to be floated in Q4 2022.
Click here for more details Details
8The main access tunnel and ventilation tunnel works have been completed.
8The project got delayed due to inter-state boundary issues with states.
8HM works contractors have started the construction of the surge shaft and erection of penstock.
8Boring works for TRT have been completed and civil works are in progress
8Land acquisition of transmission line works was completed.
8RFQ for the 440 kV GIS S/S works packages is likely to be floated in October 2022.
 Click here for more details Details
The generator has sought long term coal linkage for the following:
 
8Telangana TPS Ph-I (2x800 MW)
 
8Kudgi TPS (3x800 MW)
 
8Find out more
 Click on Reports for more
Details
 < 1 2 3 4 5 >  Last ›

Showing 101–150 of 314 items