For reference purposes the website carries here the following tenders: 8Tender for Running and Maintenance of electrical installation and Power supply network Details 8Supply, Installation, Testing & Commissioning of 03 Nos. of Numerical Distance Protection Relays Details 8Tender for Procurement of ACI Bends and Laterals for Dry Ash Conveying Line Details 8Tender for supply of Battery bank Details 8Tender for Routine work of Repair & Maintenance of illumination System Details 8Purchase of Electrical Power Winches for maintenance off HM equipments Details 8Design, Engineering, Supply, Testing & Commissioning of 16 MVA Transformer Details 8Annual mechanical maintenance Contract of Coal Handling Plant Details 8Tender for Supply, Erection, Testing, Commissioning and Maintenance for 3 years of Roof top LT Grid connected solar plant Details 8Procurement of Butterfly valves & check valves and M.S.ERW pipes & fittings Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8India’s first lignite-fired power plant proposed by Neyveli Corporation gets green nod. Details 8Karnataka’s power sector: History, politics of development have consequences Details 8Macquarie eyeing Goldman Sachs’ ReNew Power stake Details 8Mid-year infrastructure outlook stable: Ind-Ra Details 8SBI seeks to resolve 7-8 stressed power assets Details 8Decision on power NPAs likely by 10 October Details 8China ready to start world's first AP1000 nuclear reactor Details 8Mahanadi Coalfields to double Jharsuguda-Sardega line, triple coal handling Details 8Primary aluminium producers are facing severe coal crisis: AAI Details 8MSEDCL plans to set up 500 electric vehicle charging stations Details 8Mahagenco in financial trouble as dues cross Rs 10,000 cr Details 8Power min skirts Rs 1k-cr coal scam; talks of HC stay order Details 8GE power CEO reveals problem with new turbine model, shares drop Details 8No deadline for 100% electrification of vehicles: Ananth Geete Details You can also click on Newsclips for moreDetails
An annual maintenance contract is coming up for the air preheater works in a 630 MW thermal power station. 8Find out more. Click on details for the key contacts.Details
Project Name: Thermal Power Station Maintenance Project 8Project Cost: 5 crores 8Project Description: Owner has planned a 35-day scheduled overhaul in the 1200 MW Thermal Power Plant. The major scope of work envisages maintenance works in the high-pressure turbine parts, low-pressure turbine parts, replacement of air preheater basket, replacement of boiler refractories, coal bends replacement, among others. 8Project Event: RFQ for the required overhaul works is expected by October 2018. Click here for more informationDetails
Project Name: Brownfield Thermal Power Project 8Project Cost: 8957 crores 8Project Description: The project proponent has been accorded environmental clearance in September 2018 for a 1600 MW brownfield ultra super-critical technology thermal power plant in the existing premises of old Thermal Power Station. The RFQs are getting delayed due to pending clearance from the state's high-level clearance committee. Further bids are expected soon. 8Project Event: RFQ for raw water, make-up water system, and associated civil works package are expected by November 2018, instead of June 2018. RFQ for the make-up water pipes package is expected by November 2018, instead of June 2018. 8Expenditure Approval: Q3:2018 8RFQ Date: Nov/2018 8Release Date: Nov/2018 8Start Date: 2019 8Completion Date: 2023 Click here for more informationDetails
For reference purposes the website carries here the following tenders: 8Tender for Annual maintenance work of all generating units & its auxiliaries Details 8Tender for Supply of Conveyor Belt of width 1600 mm Details 8Tender for the AMC for the work of fitting of missing/damaged/loose conductor Details 8Tender for Annual overhaul of Air Pre Heater – ‘B’ pass and its lube oil system Details 8Tender for Refurbishment of Vanes of Gas Turbine Details 8Tender for Procurement of Lighting Distribution Panel of CHP and main Plant Lighting Details 8Tender for Various Maintenance activity to be Carried out under planned and emergency outages at 220 KV and 400 KV s/s Details 8Tender for Supply of Safety Valve Spares Details 8Tender for Supply, Erection, Testing, Commissioning and Maintenance for 3 years of Roof top LT Grid connected solar plant Details 8Tender for Supply of Various sizes of Conveyor Belts Details 8Tender for Annual overhaul of Air Pre Heater – ‘A’ pass and its lube oil system Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Consumers upfront in tale of two reforms in Andhra Pradesh Details 8India banks to plan resolving $19 billion power sector debt on today Details 8Meghalaya babus allowing illegal coal mining: Wildlife group Details 8BSES energises 1000 solar rooftop connections, number likely to cross 2000 mark by year end Details 8Coal import scam: Adani group gets interim relief from DRI Details 8‘Upgrading India’s old power plants can offer 3,500 cr in savings’ Details 8Impose 50% of solar tariff as penalty for not buying power: Developers to MNRE Details 8India's solar PV installed capacity crosses 25 GW, says Mercom Details 8BHEL wins orders worth Rs 40,932 crore in FY'18, declares 91% dividend Details 8Germany to reach target of 1 million electric cars later than planned Details 8Patna: Government targets 24x7 power supply across state by 2022 Details 8Power demand in Gujarat hits record 17,652 Mw Details 8Government steps in to arrange funds for green projects Details 8Coal India supplies 30% more coal to Tamil Nadu for meeting demand Details 8Maharashtra: Power demand peaks to 20,000 MW Details 8Government may ask RBI to classify renewable energy projects under priority sector lending Details 8Tata Power, India Power Corp bid for Odisha discom Details You can also click on Newsclips for moreDetails
An owner has shortlisted two major EPC contractors for their small hydropower projects in the J&K state. 8Find out who are the contractors and what is going on in the project. 8Find out the schedule for price bidding. Click on detailsDetails
Project Name: Brownfield Super-Critical Thermal Power Project 8Project Cost: 5125 crores 8Project Description: Ownerhas issued a letter of award to the EPC contractor for a brownfield 800 MW super-critical plant at its thermal power station. The boundary wall preparation is done and piling works in the main plant are yet to start. The boiler auxiliaries and pre-heater requirements will be done in-house only. Further bids are expected soon. 8Project Event: RFQ for erection and commissioning of the fire fighting system is expected by November 2018. 8Expenditure Approval: May/2015 8RFQ Date: Nov/2018 8Release Date: Nov/2018 8Start Date: Aug/2018 8Completion Date: Q3:2023 Click here for more informationDetails
Project Name: Greenfield Hydroelectric Power Project 8Project Cost: 3500 crores 8Project Description: The project proponent is undertaking a private land acquisition for a 210 MW greenfield hydroelectric power station. The project envisages construction of a 16m high cofferdam, 716m FRL, a 453m length diversion tunnel, an 85m spillway, a 108.17m HRT-1, and 146.89m HRT-2. The forest clearance is still pending. An invitation for bids is expected soon. 8Project Event: RFQ for civil works and hydro-mechanical works are expected by the November 2018, instead of August 2018. 8Expenditure Approval: Q1:2019 8RFQ Date: Nov/2018 8Release Date: Nov/2018 8Start Date: Q3:2019 8Completion Date: Q2:2023 Click here for more informationDetails
Looks like the much talked about supply glut in the LNG industry, that was meant to kick in in 2018, is not really to be seen anywhere around. 8Every cargo seems to be finding a market. 8Winter demand is expected to be robust enough, despite higher supplier of gas through transnational pipelines to China, to keep prices high. 8There is perhaps a slight period of uncertainty between the winter of 2018 and the summer of 2021, when new capacities come on stream, but the market will tighten considerably from 2021 onwards, just when new gas from India's KG Basin begins to come in. 8High LNG prices is bad news for India, as it is a highly price sensitive market. Affordability in India is in the range of $5-7/mmbtu and not in the $9-11/mmbtu range. 8As prices stay high, gas marketing is where the challenge is going to be, both for domestic gas marketed by KG Basin suppliers and new LNG terminals which are coming up Click on Reports for more
Details
If you are the boss of a corporate entity and interested in promoting green power as a corporate principle, there is a lot you can do. 8You can use organizational tools to promote green power, and that means not just electricity but a range of other options 8How do you go about contracting for green power? 8How to set up your own green power, as this has now become a viable option, as the cost for doing so is getting to be lower than grid power. So how do you go about doing it? 8How do you screen for options? 8Where to obtain resources and assistance? 8How to create a project plan? 8Where to get commercial solar financing? Click on Reports for answers to these questions.
Details
Do not rule out nuclear power yet from the new low-cost energy paradigm. 8A new breed of small (less than 300 MW) modular nuclear plants are being readied in global laboratories, where the power plant is centrally built and shipped for installation anywhere in the world. 8The levelized cost of electricity from these plants are competitive to cost of renewable or gas-based power. 8What is more, these nuclear plants can be used for centralized cooling and thermal desalination plants 8The residual heat is usable for a variety of industrial applications, including the production of glass, plastics, steel, synthetic fuels, and chemicals. Click on Reports for more
Details
Which way is Indian electric vehicle revolution going from here? 8The all-electric by 2030 slogan has been dropped, but can we really go for 30% electric by 2030? 8The website carries here the views of automotive industry leaders on the looming electric vehicle revolution. 8Not everyone seems to be on the same page Click on Reports for more
Details
It is not just Bifacial solar that is going to be the reason why solar prices are expected to keep coming down. 8There are a bunch of technological developments that will see future prices plunging 8Find out more on what are the latest developments and how far further will prices slip Click on Reports for more
Details
What exactly is Bifacial solar? 8It is a simple and outstanding technology, though the point to note is that it is just one of many fascinating innovations in the solar field. 8Bifacial technology unveils the rear side of a PV module for sunlight absorption. 8The gain varies between 5 and 30%, depending on various aspects, such as device design, location and mounting conditions. 8With the new generation of high-efficiency cells being capable of bifacial power generation, this technology is expected to gain quickly market shares. Click on Reports for more
Details
Saudi Arabia had been able to get solar tariff rates down to 2.34US cents/kWh. 8Even more impressive is that in that tender was included one bid that was as low as 1.79 US cents, which was disqualified in the end. 8This bid reportedly wanted to deploy bifacial technology, which enables power generation on both sides of a solar module 8It promises yield improvements of 10 to 30%. Click on Reports for more
Details
Google has made commitments to invest nearly $2.5 billion in innovative, large-scale renewable energy projects 8Google sees this as an opportunity to help deploy renewable energy at a larger scale while at the same time making investments that have an attractive risk-adjusted return. 8The company is now on the lookout for opportunities around the globe. 8Including India Click on Reports for more
Details
There is a brownfield expansion of a captive power plant in India. 8It is a big expansion: An addition of 2 units of 660 MW each. 8Two consultants have been employed to prepare the DPR Click on Reports for more
Details
For reference purposes the website carries here the following tenders: 8Annual Maintenance of Unit-1 & 3 of 31.4 MW Turbines and Generator Assemblies Details 8Supply of Balance Materials and Complete Erection, Testing & Commissioning work for 33/11/0.4 KV Substation Details 8Design, Supply, Erection & Commissioning of Acoustic Steam Leak Detection System Details 8Supply, Erection, Testing & Commissioning of 1200kwp Grid Connected Solar PV Project Details 8Tender for Refurbishment, reconditioning, Supply, erection and commissioning of battery Banks Details 8Tender for supply of 66 kV Lightning Arrester Details 8Tender for Providing Emulsifier protection system to 25 Nos Generator Transformers Details 8Design, Engineering, Supply, Testing & Commissioning of 35 MVA Transformer Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8NLC to invest Rs 1,290 bn to ramp up mining, power generation capacity Details 8RInfra set to become debt-free by next year: Anil Ambani Details 8Solar Industry shining with job offers, ‘Green Jobs’ to be the next big thing Details 8RPower eyes stressed thermal coal-based assets to boost growth Details 8CIL likely to supply 16 rakes/day to Tamil Nadu Gen Co Details 8PFC files insolvency plea against Rattan India Power Details 8Centre denies favouring Adani firm AEL Details 8European countries back plan to use more hydrogen for energy Details 8India’s aggregate cooling requirement to increase by 8 times in 20 years Details 8Soon, energy projects may undergo green checks Details 8Russia to start building two nuclear reactors in Hungary soon - Putin Details 8SBI announces steps to go carbon neutral by 2030 Details You can also click on Newsclips for moreDetails
Project Name: Hydroelectric Power Plant: Maintenance Contractor Project 8Project Cost: 3 crores 8Project Description: Owner is getting delayed in coming out of bids for biennial maintenance contract of electrical works and 400 kV switchyard and its associated system due to approval pending from the high-level committee of the owner's hydro region headquarter in the 1000 MW hydropower station. Further bids are expected soon. 8Project Event: RFQ for an electrical maintenance job contract is expected by the third week of September 2018. RFQ for maintenance job contract of 400 kV switchyard and it's associated system is expected by the third week of September 2018. 8Expenditure Approval: Q1:2018 8RFQ Date: 20/Sep/2018 8Release Date: 24/Sep/2018 8Start Date: Q1:2019 8Completion Date: Q1:2021 Click here for more informationDetails
Project Name: Thermal Power Station: Installation of FGD Unit 8Project Cost: 500 crores 8Project Description: Owner is planning the installation of a wet flue gas desulphurization (WFGD) unit in a 500 MW thermal power station. Approval is pending at the high-level committee of the state. An invitation for bids is expected soon. 8Project Event: RFQ for design, engineering, manufacture, complete services of construction including erection, supervision, pre-commissioning, commissioning, performance testing of equipment and 3 years O&M of an FGD package is expected by November 2018. 8Expenditure Approval: Q2:2018 8RFQ Date: Nov/2018 8Release Date: Nov/2018 8Start Date: 2020 8Completion Date: 2022 Click here for more informationDetails
The major power sector companies in India is now moving to the renewable side for generation of electricity. 8Ministry of Power has already directed to install a renewable energy storage system at all existing thermal power stations. 8NTPC, a 53,651 MW capacity power company is going to invest Rs. 200 crores approx. in setting up of a 5 TPD Bio-CNG plant by using agriculture residues at its existing acquired land in the Dadri thermal power station. 8Click on details to know the future RFQs and the key contacts.Details
For reference purposes the website carries here the following tenders: 8Tender for Supply of 360V, 400AH Lead Acid Battery Details 8Tender for Procurement of Carrying Idlers & Return Idlers for CHP & ACHS conveyors Details 8Tender for Procurement of Dewatering Submersible Pumps Details 8Annual repair & maintenance of Electrical installations and Operation & maintenance of 11KV HT line/ 415V LT lines Details 8Tender for Rural Electricity Infrastructure work for connecting un-connected households Details 8Design, Supply, Erection, Testing & Commissioning of Online Energy Monitoring and Management System Details 8Construction of foundation for Transformers, Pile foundation for Container Control room, Cable Trench and oil pit for Containerized Substation Details 8Tender for the work of HP-HVOF Coating of thirty numbers of new Guide Vanes Details 8Procurement of Pneumatic Tools for fastening of machine components Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Stressed Power Units: ‘Banks have to take more than Rs 10K crore haircut’ Details 8BHEL flags off its first 6000HP electric locomotive Details 8Mytrah Energy signs PPA for 300 MW wind power with SECI in Tamil Nadu Details 8MSEDCL to set up 500 EV charging stations in 3-4 years Details 8Power prices surge to a record on higher demand Details 8States ready to pay to meet peak demand, but where are the power sellers? Details 8Congress accuses govt of favouring Gautam Adani in coal import case Details 8Lenders knock at NCLT door against GVK Power Details 8Thursday meet to take up stressed power projects resolution Details 8Japan's Marubeni to halve coal-fired power capacity by 2030 Details 8Lenders reluctant to fund renewable energy projects Details 8Solar project developers seek reversal of cap in tariffs Details 8Maharashtra: Power utility’s first solar power plant goes live Details 8Solar power tariffs hit record low once again Details 8Inox Wind looks to close FY19 in the green Details You can also click on Newsclips for moreDetails
Project Name: Greenfield Hydroelectric Power Project 8Project Cost: 3125 crores 8Project Description: Promoter is evaluating bids for engagement of a consultant for preparation of the detailed project report in a 400 MW greenfield hydroelectric power project. RFQ for consultancy services for the catchment area treatment plan is getting delayed due to administrative issues. Further bids are expected soon. 8Project Event: RFQ for consultancy services for catchment area treatment (CAT) plan is expected by November 2018, instead of Q3, 2018. 8Expenditure Approval: 2017 8RFQ Date: Nov/2018 8Release Date: Nov/2018 8Start Date: Q2:2020 8Completion Date: Q3:2025 Click here for more informationDetails
Project Name: Brownfield Supercritical Thermal Power Project 8Project Cost: 8264 crores 8Project Description: Owner has been accorded terms of reference for a 1320 super-critical thermal power expansion project at its existing ongoing facility of 1600 MW thermal power complex. The unit-1 has been commissioned. Moreover, another unit is in advanced stages of completion and is expected to get commissioned by November 2018. Currently, the owner is undertaking DPR activities for the expansion project by using in-house resources. Further bids are expected soon. 8Project Event: RFQ for the QCI-NABET consultant for conducting EIA studies is expected by October 2018. 8Expenditure Approval: Q1:2019 8RFQ Date: Oct/2018 8Release Date: Oct/2018 8Start Date: 2020 8Completion Date: 2024 Click here for more information Details
Spot LNG prices may crash going ahead 8And a supply glut is not the reason why that may happen 8There will be a variety of other factors Click on Reports for more
Details
Since its launch by students as a moral call to climate action in 2011, the fossil fuel divestment campaign has become a mainstream financial movement mobilizing trillions of dollars in support of the clean energy transition. 8Commitments to divest continue to grow rapidly: 8Today, nearly 1,000 institutional investors with $6.24 trillion in assets have committed to divest from fossil fuels, up from $52 billion four years ago—an increase of 11,900 percent. 8Find out how some Indian institutional investors have been roped in as well Click on Reports for more Details
Domestic gas prices are to be revised upwards for the October-March period. 8By how much will prices go up? 8How will impact the Indian gas sector Click on Reports for more
Details
India will find a substantial low-carbon energy and energy efficiency investment gap going ahead. 8The gap looks small now but it widens rapidly to unmanageable levels. The gap between what is needed and what is put on the ground could go up to as high as 81% for India. 8India's NDC pledge is a move in the right direction, but as his shown in this set of calculations, they are wholly insufficient for incentivizing the kind of deeper, structural changes in the energy investment portfolio required for reaching the low-temperature targets of the Paris Agreement. Click on Reports for more
Details
The electricity generation outlook for 2018-19 is expected to be in the range of 6-7%. 8Rural electrification led by “Power for All” is expected to drive demand for electricity. 8But if demand surges on account of high industrial demand, there should be shortages too as domestic availability of coal will come up as a big constraint. 8This in turn would lead to some plants switching to imported coal. 8With imported coal trading upward of $115-120 since May 2018, it would impact margins of electricity generation companies. Click on Reports for more
Details
Clearly, the government seems unable to cut AT&C losses. 8AT&C losses have widened instead of narrowing. 8Deterioration in AT&C losses highlights slippage in the implementation of the UDAY scheme. 8Another indicator is the status of completion of smart metering of lines, which stood at 3.82 lakh, less than 1.5% of the total target to be implemented. 8Smart metering was expected to improve collection efficiency by minimizing human intervention as well as help consumers optimize the use of electricity during peak demand hours. Click on Reports for more.
Details
The fact that 3.9GW of auctioned solar capacity was cancelled during the year is sending out the wrong signals to the market. 8SECI cancelled 2.4GW out of a total of 3GW Interstate Transmission System (ISTS) connected solar auction held in July 2018. 8Then again, Uttar Pradesh New and Renewable Energy Development Agency cancelled 1GW of grid-connected project in the same month. 8Gujarat Urja Vikas Nigam Ltd cancelled 500 MW of grid-connected solar capacity. 8Agencies stated high tariff and wide gap between winning bids for cancellation of auctions. 8But all of that is not sending the write message to potential investors. Click on Reports for more
Details
Gas based power plants are expecting a fillip for an increasing need for peaking power now that injection of renewable power into the grid is going up 8Coal-based power plants will never be able to compete in ramp-up speed with gas-based power plants 8But new technology is coming in that will make coal-based power plants more amenable to flexible generation. 8Another point to note is that coal-based power plant technology is making some rapid progress. 8The technology is moving beyond super critical from ultra super critical to advanced ultra super critical. From here on, the movement is towards Integrated Coal Gasification Combined Cycle and eventually to Integrated Coal Gasification Fuel Cell Combined Cycle. Some pilot plants are in the offing already. 8At this rapid rate of technological development coal based power plants are unlikely to be phased out soon Click on Reports to find out more
Details
A new report released in August 2018 by a prestigious science academy has claimed that earth may soon be warming up to a point where it may go beyond the point of no return. 8If a threshold is crossed, there will be continued warming even as human emissions are reduced. Crossing the threshold would 8The report examines the evidence that such a threshold might exist and where it might be. 8If the threshold is crossed, the resulting trajectory would likely cause serious disruptions to ecosystems, society, and economies. 8Collective human action has been suggested to steer the earth away from a potential disastrous situation. 8Such action entails stewardship of the entire Earth System — biosphere, climate, and societies — and could include decarbonisation of the global economy, enhancement of biosphere carbon sinks, behavioural changes, technological innovations, new governance arrangements, and transformed social values. Click on Reports for more
Details
For reference purposes the website carries here the following tenders: 8Supply of 11/.415 KV Step down Transformer Details 8Supply of 145 KV Current Transformer (CT) Details 8Manufacture and supply of Nylon Conveyor Belt for Coal Handling Plant Details 8Supply, installation, Testing & Commissioning of Telescopic Tilting tower lighting system Details 8Tender for the supply of Spares for HPMS System in XRP 803 Mills Details 8Procurement of 1.1 MMT of Imported Coal for Power Plants Details 8Procurement of 1.4 MMT of Imported Coal for Power Plants Details 8Tender for Operation & Routine maintenance of Power House and Switchyard Mechanical System Details 8Tender for work of replacement of old rusted tower of 132 kV Line Details 8Tender for Conversion of 132kV & 33kV single conductor bus to double conductor bus at various EHV substations Details 8Tender for the Work of Height Raising of 33KV Earth Electrode Line Details 8Supply of LT Mini Pillar boxes with tripping facility Details 8Construction of 220/132/33kV Substation with SAS on turn-key basis Details 8Supply of 309 Km of 11 kV XLPE UG Cable Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Bankruptcy cases: Foreign funds load up equity to buy companies Details 8Reform in electricity sector is all about getting the politics right Details 8RBI refuses to be part of a panel on power sector Details 8Coal India wants a coal export policy Details 8Revenue department withdraws circular on suspension of safeguard duty on solar cells Details 8SB Energy denies allegations of cartelisation Details 8Odisha blames Centre for power tariff burden Details 8Coal offtake rises 9.5% to 247 mn tonnes in April-August, production up 12% Details 8Banks to go ahead with power units’ resolution plans Details 8Electric vehicle makers face shortage of engineers Details 8Tata Power discom to use drones for faster network maintenance Details 8Centre pushes for new power plant at Talcher; Odisha seems not so keen Details 8Tepid response to NMC’s 3,450 solar water heater project Details 8How India's power story derailed, blowing a Rs 1.74 lakh crore NPA hole Details 8Maharashtra to get 57,000 solar farm pumps: Energy minister Bawankule Details 8PMO asks agencies to increase usage of fly ash by 10 times Details 8Germany's RWE says too early to exit coal in 2035 Details 8CDPQ set to buy 40 per cent in CLP’s India arm Details You can also click on Newsclips for moreDetails
For reference purposes the website carries here the following tenders: 8Procurement of Off Grid Solar (PV) Power Plant System Details 8Extension Notice- Construction of 220 KV D/C Transmission Line with twin moose Conductor Details 8Extension Notice- Tender for Reconductoring of 132 KV Transmission Line with HTLS Conductor Details 8Extension Notice- Construction of 132 KV D/C Transmission Line Details 8Corrigendum- Construction of220 KV D/C Transmission Line Details 8Tender for Procurement of LV components for TPP Details 8Tender for Rate contract for Overhauling/Repairing and replacement of Boiler Feed pump Details 8Tender for Repairing/ retubing of oil coolers of LGB and TGB of generating units Details 8Purchase of 04 Set Tube Bundle Set for Raw-Potable Water Heat Exchangers for Power Station Details 8Supply, Delivery and Erection of Galvanised Iron Structure Aluminium Pipe Bus and Different Connectors and Installation of Electrical Equipments Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Four states show interest in buying power sans PPAs Details 8Hindustan Power looking to acquire stressed thermal power plants Details 8IKEA targets home delivery by electric vehicle in five major cities by 2020 Details 8Wind and solar farms could double rainfall in Sahara, scientists say Details 8Andhra Pradesh government directs discoms to take wind power in full Details 8‘Power regulators need to be more market-oriented’ Details 8Hartek Solar bags rooftop solar projects in Chandigarh Details 8ChargePoint to grow global EV charging network to 2.5 million by 2025 Details 8Uttarakhand Jal Vidyut Nigam to produce power from sugar mills Details 8Government may auction power contracts with coal supplies Details 8NTPC power plant clearance: Odisha puts ball back in Centre’s court Details You can also click on Newsclips for moreDetails
Stakeholders are divided over what kind of incentives are to be given to generators to install FGDs A set of initiatives were deliberated and they were: 8Priority in scheduling to the TPPs which are environmentally compliant irrespective of their variable cost. 8Increased variable cost due to installation of FGD and other pollution control equipment may be subtracted from the tariff for Merit Order Dispatch for those plants installing pollution control equipment. 8EPO (Environment Power Obligation) may be introduced in line with RPO (Renewable Power Obligation) and should be made mandatory for DISCOM to purchase at least 10% power from plants which are norms compliant 8Excise & Custom duty/GST may be exempted for pollution control equipment like FGD etc. 8Present limit of 30% equity to be met by plants to be relaxed to 10% 8NCEF collected through coal cess may be utilized for funding utilities for installation of pollution control equipment. 8The amount of coal cess may be reduced for TPPs complying with new environmental norms. Click on Reports for more
Details
Quite a few new policy proposals which will have a direct impact on the Indian power sector is currently under formulation. As a stakeholder, this is the time to put in your comments on the following draft notes: 8Draft Concept note on Merit Order Operation: Flexibility in Generation and Scheduling of Thermal Power Stations to reduce the cost of power to the consumer 8Proposed amendments in Tariff Policy, 2016. 8Draft Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, Sixth Amendment, 2018. 8Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Fourth Amendment) Regulations, 2018. 8Draft procedure for grant of connectivity to projects based on renewable sources to inter-state transmission system. 8Invitation of comments/suggestions on staff paper on “Revised Methodology for Application of the Escalation Rates for Payment”. Click on Reports for more
Details
Did the Parliamentary Standing Committee in its much talked about report overlook the core issues around stressed power sector assets? 8Were obvious solutions overlooked? 8Was there a failure to point out who was responsible for the crisis? 8Did the Committee miss the woods for the trees? 8The answer seems to be a "yes". Click on Report for more
Details
Fresh data has been brought into play to project different sources of power in India's energy matrix in 2020, 2030, 2040 and 2050. 8The interesting point to note is that gas-based power contributes the biggest share to energy generation, more than solar and wind. 8From today's perspective, when most gas-based power plants do not do well under the Merit Order Dispatch system, that fact that gas-based units will play such an important role in the future seems a little incongruous. 8How are these projections worked out? Click on Reports for more
Details
The LNG shipping market seems to be tightening faster than was anticipated 8And new high in spot prices are being observed 8Typically, LNG freight rates make up a significant portion of the final LNG price 8Find out how end prices are going to be impacted by higher freight rates Click on Reports for more
Details
Neither projections of slow demand or stressed assets or units being forced to work at their technical minimum seem to be deterring promoters from seeking permissions to set up newer conventional power plants 8A host of hydel plants are also lined up for permissions 8Since the sector was unlicensed, there has been a surfeit of new projects promoted by private entrepreneurs coming up, perhaps without keeping the demand dynamics in mind 8And promoters continue to rush in even today to set up newer plants Click on Reports for more
Details
Best level cost estimates are now available for production of hydrogen for use in power generation and automotive vehicles 8While there is a lot of talk about using renewable energy to produce hydrogen through electrolysis, at present the economics of converting fossil fuel such as gas to carbon-free hydrogen by using the carbon capture route seems to be more attractive 8Prices will have to fall much more for hydrogen to become a competitive fuel of choice 8All projections show hydrogen usage becoming a big component of the total energy paradigm by 2050 Click on Reports for more
Details
Project Name: Brownfield Supercritical Thermal Power Project 8Project Cost: 4086 crores 8Project Description: Owner is evaluating the main plant package bids for an 800 MW super-critical thermal power expansion complex at its existing 1500 MW facility. Three big players are in the race. Also, the consultant is preparing the final EIA report. EC is likely to be elicited in the next 5-6 months. Further bids are expected soon. 8Project Event: RFQ for cooling tower package and twin flue chimney package is expected by the Q4 2018. 8Expenditure Approval: Q1:2017 8RFQ Date: Q4:2018 8Release Date: Q4:2018 8Start Date: 2020 8Completion Date: 2024 Click here for more information The owner is planning to come out with a breakdown maintenance works in the 1050 MW thermal power station. 8The work tenure is for the period of 90 days. 8A detailed bid document is expected soon. Click on detailsDetails Project Name: Thermal Power Station - AMC contractor 8Project Cost: 2 crores 8Project Description: A JV company has floated a bid for an annual maintenance job contract for a boiler and its auxiliaries and electrical and C&I equipment for a 2000 MW thermal power station. Currently, a tender document is getting prepared for an annual maintenance job of HT/LT transformer bus-ducts and rectiformers in the main plant and offsite area. Further bids are expected soon. 8Project Event: RFQ for an annual maintenance contractor of HT/LT transformer bus-ducts and rectiformers is expected by the end of September 2018. 8Expenditure Approval: Q1:2018 8RFQ Date: 25/Sep/2018 8Release Date: 28/Sep/2018 8Start Date: Nov/2018 8Completion Date: Nov/2019 Click here for more informationDetails
Nagarjuna Fertilizers is planning to restart its fertilizer plant shortly 8This will mean that a significant part of Nagarjuna's total gas consumption of 3.2 mmscmd of gas, which was diverted to the power sector when the plant shut down in the first week of July, will no longer be diverted 8Find out more about when Nagarjuna will go on stream? Click on Reports for more Details
For reference purposes the website carries here the following tenders: 8Tender for Procurement of Leakage Current Analyzer for Surge Arrestor Details 8Supply of Mill Classifier Outlet Box with Ceramic Lining for Coal Mills Details 8Tender for Procurement of Pipe Details 8Tender for Procurement of Pressure and DP Transmitter Details 8Tender for Conversion of HT & LT overhead networks into underground system Details 8Tender for Construction of earth pits, laying of earth mat etc. for ESP Details 8Tender for Round the clock preventive maintenance, up-keeping servicing and breakdown maintenance of Bowl mills Details 8Supply, Installation & Commissioning of spares for vibration measurement system Details 8Tender for work contract of Supply of Material, Erection, Testing and Commissioning for work of Additional line Bays Details 8Tender for Attending break down works in Bottom ash Hopper, Scrapper Feeders & Clinker Grinders Details 8Tender for Flue Gas Desulphurisation (FGD) System Package Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Engie ties up with STOA to set up 2 GW wind plants in India Details 8Coal India to invest Rs 4K crore, to shut 53 underground mines Details 8Consumers feel the heat as private power firms face coal shortage Details 8Panel on power mulls payment security mechanism for private players Details 8For solar projects, bona fide Himachalis to get preference Details 8India solar power target under cloud as agencies spike bids for 9,000 MW Details 8High Court flays Maharashtra power utility Details 8Google buys into new Finnish wind energy in renewables search Details 8MSEDCL and Tata Power tariffs go up, BEST’s drops Details 8McDonald's, Google strike wind power deals in Europe Details You can also click on Newsclips for moreDetails
The draft simplification of tariff categories notification is out. 8The new structure will do away with the multiplicity of tariffs now seen 8A maximum of 5 categories have been suggested 8Those with lower loads will be subsidized by those in higher load categories 8Under reporting of declared loads will be automatically corrected Click on Reports for more
Details
What happens when beneficiaries are suddenly loaded with surplus These are the options worked out with them 8Beneficiaries to sell surplus in the DAM and Contingency market as far as possible. 8If beneficiaries unable to sell surplus in the market, consent may be given to generators to sell in the market. 8All generating stations to comply with generation reduction instruction of 55% technical minimum. Click on Reports for more
Details
8NTPC's inability to take advantage of the customs duty exemption on import of materials for its mega power plants has cost the company a lot of money 8Then again, there was a disallowance of capital expenditure on spares because of delay in supply 8Then again, it lost money because of its optimize on its water supply plan for the Bhilai Expansion Project. Click on Reports for more
Details
The Northern region is expected to register surplus of 7% in November and December 2018 8The surplus figure is projected at around 3% 8But is expected to climb when temperatures cool in November and December Click on Reports for more
Details
High cost of thermal power is a negative for industries with high power and coal consumption, and those with captive power units 8International thermal coal prices (up 18% YoY to USD 117/t) to remain robust owing to production cuts (and CY18E deficit of ~115mt) in China and a limited production uptick elsewhere. 8Find out how the impact works through the captive power system Click on Reports for more
Details