All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


Sep 2021

For reference purposes the website carries here the following tenders:
8Tender for rate contract for regular and shift maintenance of electrical system & equipment Details
8Tender for detailed engineering, fabrication and erection of structural steel Items for 150 meter high reinforced concrete single steel flue chimney for FGD system Details
8Tender for the work of repair, overhauling & servicing, maintenance of 220/132/33KV Isolator Details
8Tender for design, manufacture, testing, supply and delivery of 158 Nos. 60 KV, 10KA Station type Heavy Duty, Zinc Oxide Lightning Arresters Details
8Tender for design, manufacture, testing, supply and delivery of battery chargers Details
8Tender for a biennial maintenance contract for milling system Details
8Tender for Procurement of push-fit type tamper-evident poly-carbonate security seals Details
8Tender for balance work of Electrostatic precipitator (ESP) internals Details
8Tender for Overhauling, Servicing & Supply of spare of required types of various types of 145 kV Circuit Breaker Details
8Tender for supply, erection, testing & commissioning of 40KVA diesel generator sets Details
8Tender for procurement of Hub for PA fan & FD fan Details
8Tender for the supply of Hi chrome liners for coal mills Details
8Annual Rate Contract for C&I system of the main plant along with its auxiliaries including works related to the C&I works of AHP & ETP Details
8Tender for annual rate contract for mechanical maintenance work of TG & TG auxiliary Details
8Tender for ARC for repairing of large AC LT Motors and DC motors Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Coal India to ramp up fuel supply to power plants. Details
8Govt approves amendments of REC mechanism, floor and forbearance price limits removed Details
8SJVN’s plan to buy PTC wind assets hits hurdle Details
8China's end to overseas coal financing could free $130 bn for clean energy Details
8Adani Green to acquire 40 MW operational Solar Asset in Odisha Details
8NTPC REL signs first green-term loan pact of Rs 500 cr for 670 MW solar projects Details
8Power Minister approves dispute avoidance mechanism for hydropower contracts Details
8Alstom eyes over Rs 8,600 cr revenue in next fiscal Details
8SJVNL first-quarter net profit up 13 per cent at Rs 339 crore Details
8PM Modi reviews projects worth Rs 50,000 crore at 'Pragati' meeting Details
895% of Mumbai’s power comes from coal, GHG big concern Details
Click on Newsclips for more
Details
8Chinese financing makes up about 56% of public funding for coal power projects around the world
 8Over the last decade, the largest funders of coal fired power stations have been China, South Korea and Japan
8China will step up support for other developing countries in developing green and low-carbon energy, and will not build new coal-fired power projects abroad
Click on Reports for more Details
8First Solar plans to invest INR 50.3 billion (bn)) in a fully vertically integrated PV thin-film solar module manufacturing facility of 3.3 GW capacity in Tamil Nadu
8The facility is expected to commence operations in the second half of 2023
Click on Reports for more
Details
8China commissioned 38.4 GW of new plants last year, representing 76% of the world’s total new coal plant starts.
8Overall, China accounts for 55% of coal consumption, followed by India with a share of 12% and the US with 6%.
8While China is moving away from coal financing abroad, the country has not made commitments to curb coal consumption domestically
Click on Reports for more
Details
8NTPC has doubled its RE portfolio in the last 18 months, with 7GW of projects currently either commissioned, under implementation or bid successfully
 8Comonay aims to achieve 15GW/60GW of RE capacity by FY24/FY32
 8Company has signed an MoU with ONGC to form a joint venture for the development of offshore wind projects.
 8It has also inked a pact with DVC to develop solar plants
 Click on Reports for more
Details
8An average of Rs 102.50 crore is allowed as AFC for the 2021-24 tariff period for the following transmission assets under Northern Region System Strengthening Scheme-I in Northern Region
8Meerut-Moga 765 kV S/C Transmission Line along with associated bays at Meerut
8765/400 kV Moga Sub-stations with 02 Numbers 240 MVAR line reactors
Click on Reports for more
Details
8A generator seeking the approval of Additional Capital Expenditure (ACE) on account of installation of various Emission Control Systems (ECS) at 2x250 MW TPP
8Know more about regulator's order
Click on Reports for more
Details
8The annual transmission charges allowed for 2019-24 tariff period for 400 kV Mandaula-Bawana D/C Transmission Line and 400 kV Ballabhgarh-Bamnauli D/C Transmission Line
Click on Reports for more
Details
8The proposed changes will provide some flexibility to the players, additional avenues, rationalization and also addressing the RECs validity period uncertainty issues
8Know more about the features of changes proposed in revamped REC mechanism
Click on Reports for more
Details
8The company has sizeable capital expenditure plans related to investments on infrastructure improvement, feeder separation programme, consumer and feeder metering etc., which will be funded through a mix of debt, equity, consumer contribution and capital grants
8Any delays in implementation would increase the project cost, which is exposed to risk of disallowance by the KERC
Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for supply & delivery of 765KV clamps & connectors Details
8Tender for supply & delivery of 400KV & below clamps & connectors Details
8Tender for work of erection of 33KV link line Details
8Tender for AMC job regarding non-comprehensive Bi-annual operation & maintenance contract of HT & LT electrical system Details
8Tender for round the clock preventive/ routine maintenance of Mill Reject System Details
8Tender for Supply, Installation and Commissioning of various Testing equipments Details
8Tender for design, engineering, erection, testing and commissioning of complete chlorine dioxide dozing system Details
8Tender for AMC for part of C&I System including Pneumatic actuators, Servicing /cleaning of Igniters & Scanners, Station C&I instrumentation etc Details
8Tender for design, erection testing and commissioning for Ring Main Units Details
8Tender for work of Laying of 33kV UG Cable Details
8Tender for construction of 33kV GSS & erection of 33kV S/C O/H line Details
8Tender for purchase and installation of distributed type numerical busbar protection schemes Details
8Tender for procurement of 36kV circuit breakers Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Coal India soars 12%, re-enters list of top-50 most valued firms by m-cap Details
8India must make ‘green’ hydrogen a priority Details
8Thriving domestic green bonds market key to India’s energy transition Details
8KKR-backed firm raises Rs 460 crore in India's first renewable InvIT Details
8Coal price volatility won’t affect Indian power cos much; positive on Tata Power, NTPC: IIFL Details
8Ola's EV entry gives spark to price war Details
8Why aren’t energy PSUs at the forefront of India’s energy transition? Details
Click on Newsclips for more
Details
AFC allowed for 2019-24 tariff period for following transmission assets
8220 kV S/C Jassure- Ranjitsagar transmission line
8220 kV D/C Majri- Khodri transmission line
8220 kV D/C Kunihar- Panchkula transmission line
8Know more about the trued-up AFC allowed in respect of the transmission asset for the 2014-19 tariff period
Click on Reports for more
Details
8AFC allowed for 2019-24 tariff period for 400 kV Single circuit at NNTPS generation switchyard
 Click on Reports for more
Details
8An average of Rs 185 crore is allowed as AFC for the 2021-24 tariff period for the following transmission assets under the Transmission System associated with System Strengthening-XVII in Southern Region
8Narendra (New Kudgi)-Narendra (Existing) 400 kV D/C Quad Transmission Line along with associated bays
8One Circuit of Narendra (New Kudgi)-Kolhapur (New) 765 kV D/C Transmission Line along with new 765/400 kV GIS sub-station
8Second Circuit of Narendra (New Kudgi)-Kolhapur (New) 765 kV D/C Transmission Line along with associated bays
Click on Reports for more
Details
An average of Rs 185 crore is allowed as AFC for the 2021-24 tariff period for the following transmission assets under Northern Region System Strengthening Scheme-I in Northern Region
8400 kV D/C Kanpur-Auraiya transmission line along with bays at Auraiya
8400 kV Bareilly–Moradabad transmission line along with associated bays
Click on Reports for more
Details
8IREDA completed the FY 2020-21 on second highest loan disbursements amounting to Rs. 8,827 Crore
8Also registered highest ever Profit Before Tax of Rs.569.52 Crore with an increase of 136.20% over the amount of Rs. 241.11 Crore in the previous year
8The company plans to increase the revenue per employee from Rs. 17 Crore (approx.) in FY2020-21 to Rs. 55 Crore ending FY 2025-26
Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for erection, testing, commissioning, trial operation and handing over of mechanical systems for FGD System Details
8Tender for the supply of armored cables Details
8Tender for procurement of Rotor assembly of LP Turbine Details
8Tender for works of overhauling and servicing of 6.6 kV VCB breakers Details
8Tender for biennial maintenance of ESP system Details
8Tender for work of overhauling & servicing of Circuit Breakers Details
8Tender for work of Belt Jointing by Hot & Cold Vulcanizing process and patching/repairs by Cold Vulcanizing process to the Nylon conveyor belt in CHP Details
8Tender for biennial service contract for Dozer operation under CHP Details
8Tender for procurement of three Phase LT CT operated static consumer meters Details
8Tender for the Supply, Installation, testing and Commissioning for rectification works of G9 compartment of bus coupler bay of GIS Details
8Tender for annual operation & maintenance work of Hydro Mechanical Equipment Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8NTPC hits 52-week high on winning 1.9 GW solar projects under CPSU scheme Details
8Coal shortage deepens in India amid plunging plant inventories Details
8Commercial mining: Govt launches '2nd attempt' of auction process for 11 coal mines Details
8JSPL gains after credit ratings upgrade Details
8NTPC revises its RE targets to 60 GW by 2030 Details
8CPSE index hits over 3-year high; REC, PFC, CIL, Power Grid up 5% each Details
8BPCL planning to set up 1,000 EV charging stations Details
8Sop time for Electric Vehicles users: Subsidy scheme to be extended Details
8Why aren’t energy PSUs at the forefront of India’s energy transition? Details
8Ford announces $11.4 billion investment for electric vehicle production Details
8Low tariffs for solar-wind hybrid project prone to price fluctuations: Amit Kumar, PwC Details
8Vedanta Aluminium shines at the Perform, Achieve & Trade (PAT) Cycle-II scheme by Power Ministry Details
8Govt working on plan to spend Rs 1.5 lakh crore on smart metering: Atul Bali, NSGM Details
Click on Newsclips for more
Details
8RFQ for design, engineering, supply, manufacture, installation, testing, and commissioning of ball mill package is likely to be floated in Q4 2021.
Click here for more details Details
8The annual fixed charge approved for the 2014-19 tariff period for the generating station
8Also know the total expenses allowed during the 2014-19 tariff period
8Know more bout allowed amount
Click on Reports for more
Details
An average of Rs 24.32 crore is allowed as AFC for the 2021-24 tariff period for the following transmission assets under System Strengthening-III in Southern Region
8Neelamangala-Somanahally 400 kV D/C line along with bays
8Gooty-Raichur 400 kV D/C transmission line with bays
Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for repairing of faulty rotor poles of Hydro Generator Details
8Tender for biennial maintenance contract of bottom ash system and ash disposal system Details
8Tender for annual maintenance contract for internal & external CHP electrical Details
8Tender for CHP electrical E&C works of TPP Details
8Tender for biennial service contract for removal of coal, coal dust & scrap materials from CHP area Details
8Tender for Raising of Ash Dyke over existing Ash Pond with ash & blanketing with earth at TPS Details
8Tender for annual work contract for routine, breakdown and capital maintenance work of Air preheater Details
8Tender for routine, breakdown and capital maintenance work of 400kV switchyard Details
8Tender for operation of railway yard, maintenance of railway track and electrical & mechanical maintenance Details
8Tender for routine, breakdown and capital maintenance work of boiler pressure part Details
8Tender for replacement of LT distribution panel box Details
8Tender for Preventive and Routine Maintenance works in SCR machine, lighting systems and other Electrical equipments Details
8Tender for Work of coal supervision, liasioning with coal companies and Railways at loading end of different collieries for TPS Details
8Tender for supply, installation, testing and commissioning of backup busbar protection system Details
8Tender for designing, erecting precast staircase for cooling tower Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Patel Engineering bags Rs 1,251 crore order for 500 MW Teesta-VI hydro power project Details
8SJVN bags 1000 MW Solar PV Power Project; Stock rises 2% Details
8NTPC wins 1.9 GW solar power project contract Details
8Tata Power CEO Praveer Sinha on India's transition to renewable energy Details
8Is India’s solar power sector prepared for its innovation-driven transformation? Details
8Fuel supply by Coal India to power sector rises 11% in August Details
8Rs 7,000 crore for electrification of Jagananna colonies Details
8Many nations join call for no new coal plants ahead of COP26 Details
8AAI urges CIL to reconsider coal supply halt by its arms Details
8India on track to achieve Paris Agreement's NDC limit: Minister Details
Click on Newsclips for more
Details
For reference purposes the website carries here the following tenders:
8Tender for design, engineering, procurement & construction/erection of complete augmentation of Coal Handling Plant Details
8Tender for a biennial maintenance contract for HT/LT transformers Details
8Tender for job contract for complete control and instrumentation system of TPP Details
8Tender for providing additional 33/11kV Transformer Details
8Tender for design, manufacture, testing and delivery of indoor switchgear panels Details
8Tender for design, manufacture, testing and supply of power transformers Details
8Tender for work of Day to Day maintenance of Lighting Fixtures installed at CHP Details
8Tender for procurement, erection, testing and commissioning of CO analyzer instruments Details
8Tender for procurement of distribution transformer Details
8Tender for Operation and Maintenance of pressurized dense fly ash collection system (PDFACS) Details
8Tender for Rectification and replacement including Re-insulation of defective stator coils, erection, testing and Commissioning of 100 MW Generator Details
8Tender for Supply of HS Straight joint kits for XLPE cable Details
8Tender for Supply, Erection, Testing and Commissioning of 48 volt Battery set for switchyard Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8NHPC's 510 MW Teesta-V Power Station conferred with 'Blue Planet Prize' by IHA Details
8SC confirms Rs32,156.04cr Pachhwara Central coal block mine to Dilip Buildcon-VPR consort; Stock jumps 9% so far today Details
8Vedanta Jharsuguda’s power plants awarded as ‘Best Water-Efficient Plants’ Details
8REI Expo 2021 enables the renewables industry to rebound; Witnessed a footfall of 12,987 buyers Details
8Electric vehicle industry - one of India's significant upcoming sectors; here's how to set up charging station Details
8GEF Capital Partners to pump in Rs 200 cr in Hyderabad-based Premier Energies Details
8UltraTech Cement commits to 100% renewable energy usage by 2050 Details
8Discom reforms: All states on board, says Union power minister RK Singh Details
8Coal India arm NCL joins hands with NTPC to install solar power project in MP Details
8Next round of coal mines auction for commercial mining in Oct or Nov: Joshi Details
8Thermal plants to buy 20 MT 'parali' to help keep air pollution in check Details
8PM Modi discusses India's renewable energy landscape with CEO of First Solar Details
8Government will mandate 'flex-fuel' vehicles in the next 3-4 months, says Nitin Gadkari Details
Click on newsclips for more
Details
8The country’s largest power exchange, IEX has reported a 37 per cent growth in the volume of electricity traded at the exchange in July 2021
8The total volume of electricity traded at the exchange stood at 7322 million kWh in July 2021, 37 per cent higher than the same month last year
Click on Reports for more
Details
8PV module recycling is still not commercially viable
8Recycling costs are US$20 to US$30 per solar panel
8All stakeholders including policymakers, regulators, manufacturers, assemblers, EPC players and consumers need to reduce recycling costs
Click on Reports for more
Details
8The company has long-term PPAs for only 810 MW capacity providing limited long-term revenue
8Lack of adequate power tie-up under long term PPAs poses a challenge for JPL to achieve optimum capacity utilization
8JPL has been declared preferred bidder for 420 MW under the Pilot II scheme which if materialized shall lead to an increase in tied up capacity by an estimated additional 12%
Click on Reports for more
Details
8A generator seeking permission of the Commission for interchange of power including drawl of start-up power into the grid of Unit-III of 1980 MW (3X660 MW) Thermal Power Plant
8Know more about regulator's order
Click on Reports for more
Details
8A circular economy holds the power to utilise the growing RE investment efficiently by reducing wastage and converting the produced waste to wealth
Click on Reports for more
Details
8RFQ for the ball mill package is likely to be floated dm in Q4 2021 and limestone and gypsum handling plant package is likely to be floated in Q1 2022.
Click here for more details
Details
8RFQ for the EPC package for main plant works is likely to be floated in Q1 2022.
Click here for more details
Details
8RFQ for the civil works package(lot-1) is likely to be floated in Q3 2022.
Click here for more details
Details
8RFQ for the civil works package(lot-1) is likely to be floated in Q2 2022.
Click here for more details
Details
8RFQ for the design, supply, engineering, erection, installation, testing, and commissioning of the NDTC package is likely to be floated in Q4 2021.
Click here for more details
Details
8RFQ for the EPC package for the installation of FGD is likely to be floated in Q1 2022.
Click here for more details
Details
8REC Limited and the Abdul Latif Jameel Poverty Action Lab (J-PAL) South Asia are partnering to create an annual data-based assessment of 79 public and private power distribution companies (DISCOMS) across the country to improve consumer service delivery and ensure reliable electricity supply to consumers
 8REC and J-PAL South Asia will address the challenges faced by DISCOMS that emerge from this yearly assessment as well as pilot and test potential solutions using randomised evaluations
 Click on Reports for more
Details
8Due to an increase in the power purchase cost in FY21, the company reported operating losses of Rs. 274.34 Crs in FY21 as against an operating profit of Rs.1062.01 Crs during FY20
8The increase in the power purchase cost was on account of an increase in the allocation of power procurement by the regulators during FY21 from 33% to 41%.
8The financial profile continues to remain weak due to negative net-worth, which was on account of accumulated losses over the years
Click on Reports for more
Details
8The Union Cabinet is likely to offer a PLI scheme for the auto sector as well, with a focus on promoting manufacture and export of EVs and cars running on hydrogen-fuel cells
8PLI will help automobile sectors by focusing on giving a push to manufacture of new energy vehicles and of components requiring the use of advanced technologies, much of which is imported
8It will also help India’s commitment in lowering its GHG emission by 33% and have 40% of installed power capacity based on non-fossil fuel sources
Click on Reports for more
Details
An average of Rs 15.95 crore is allowed as AFC for the 2021-24 tariff period for the following Transmission Asset under the Eastern Region Strengthening Scheme VIII in the Eastern Region
8125 MVAR Bus Reactor I Muzaffarpur Sub-station along with bays
8125 MVAR Bus Reactor II at Muzaffarpur along with bays
8125 MVAR Bus Reactor and associated bays at 400 kV Rourkela Sub-station
81x125 MVAR Bus Reactor and associated bay at 400 kV Indravati Sub-station
Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for design, manufacture, supply, installation, testing & commissioning of DCS based SCADA system Details
8Tender for comprehensive contract for operation & maintenance of Mill Reject Handling system Details
8Tender for procurement of material, service and mandatory spares for Up-Gradation of ASLD System Details
8Tender for reconductoring of 400 kV S/C (Twin Moose) transmission line with HTLS conductor Details
8Tender for the Laying of 33kV UG Cable circuit Details
8Tender for Supply, Installation, Testing and Commissioning of 11 KV Medium Voltage Covered Conductor of HRT feeder Details
8Tender for supply and installation of phasor measurement units Details
8Tender for Procurement of ACW, DMCW (TG) Spare LT Motors Details
8Tender for Supply of Condenser Tube for TPS Details
8Tender for ARC for Day to Day and Preventive Maintenance of 220KV/132KV/33KV/11KV Switchyards Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8CESL’s new online electric two-wheeler marketplace aims sale of 10,000 units this year Details
8Coal India hits 52-week high; stock rallies 27% in one month Details
8Hero Electric to increase production capacity to over 5 lakh units by March 2022 Details
8Rajasthan leading state in country in solar energy production: CM Gehlot Details
8Govt asks power plants to auction fly ash through transparent bidding process Details
8Coal supply shortage hurts top metals, cement makers Details
8Kalpataru Power wins arbitration award of $32 million against Rwanda Energy Group Details
8Ford invests in electric vehicle battery recycling company Details
8Temporary reduction in import duties to help build volumes for manufacturing electric vehicles: Audi Details
8OPINION: National charging strategy must for India's EV transition Details
Click on Newsclips for more
Details
8RFQ for SG package for both WHRB unit and CFBC unit is likely to be floated in Q4 2021.
Click here for more details
Details
8RFQ for EPC package for Civil and HM works is likely to be floated in Q2 2022.
Click here for more details
Details
8AFC allowed for 2019-24 tariff period for the LILO of 400 kV D/C Bonaigaon-Malda Transmission line at Purnea and Sub-station Purnea in Eastern Region
Click on Reports for more
Details
Make money from following captive power projects
8WHRB based Power Plant– 66 MW
8CFBC based Power Plant– 40 MW
8WHRB based Power Plant– 16 MW
8AFBC based Power Plant– 9 MW
8WHRB based Power Plant– 22 MW
8CFBC based Power Plant– 16 MW
8Captive Power Plant- 125 MW
Click on Reports for more
Details
 1 2 3 >  Last ›

Showing 1–50 of 166 items