8Swelect Energy Systems Limited is a solar power systems company with presence in solar PV module manufacturing, EPC services for solar power plants and solar power generation. 8Why is it refusing to cooperate with its rating agency Click on Reports for moreDetails
8In some parts of the world, including India, coal-based hydrogen production using carbon capture and storage (CCS) could well play a role. Click on Reports for moreDetails
8Launched in September 2020, the AIIB - Amundi Climate Change Investment Framework (CCIF) equips investors with a benchmark for assessing investments against climate change-related financial risks and opportunities. 8Find out how it works. Click on Reports for moreDetails
For reference purposes the website carries here the following tenders: 8Tender for ARC for electrical O and M support service for HT and LT switch gear, HT and LT motors, HT and LT cables, LT bus duct, distribution transformers Details 8Tender for annual rate contract for operational support / maintenance assistance for 400/220/33kV switchyard Details 8Tender for procurement of spares for crusher tripper paddle feeder Details 8Tender for supply of 33 KV 800 AMP and 11 KV 400 AMP isolator Details 8Tender for construction of water harvesting system and drain works at 220 KV GSS Details 8Tender for completion of balance civil foundation work of separation of group controlled transformer Details 8Tender for R&M of 33 KV yard at 132 KV GSS Details 8Tender for civil foundation work of separation of group controlled 2/10/12.5 MVA 132/33 KV power transformer Details 8Tender for supply of hoses assly for BH100 dumper Details 8Tender for salvaging / repairing of worn out components of dozer transmissions Details 8Tender for laying of 33 kv 3C 400 sq mm XLPE UG cable Details 8Tender for supply with installation and commissioning of high mast tower Details 8Tender for procurement of 22KV polymer composite pin insulators Details 8Tender for routine, preventive and breakdown maintenance of counter flow induced draft cooling towers Details 8Tender for civil maintenance and repair works of tower Details 8Tender for work of making of cable trench cover of different areas and replacement of damaged AC sheet Details 8Tender for balance work construction of fire station Details 8Tender for maintenance works & deployment of manpower for O&M of various 400KV, 220KV & 132KV s/s Details 8Tender for supply, erection ,testing and commissioning of air handling unit Details 8Tender for supply erection testing and comming of battery charger Details 8Tender for the supply of coal mill Details 8Tender for purchase of skate rollers for the repair works of 6 x 68.67MW generating Details 8Tender for supply, installation, testing and commissioning of new 11 KV lines, LT line Details 8Tender for procurement of spares for make oil gun, flame scanner and igniter installed at boiler Details 8Tender for procurement of spares of thermal power equipments make oil gun assembly for boiler Details 8Tender for inspection of PV modules of 5.5 MW solar power project Details 8Tender for construction of nos.4 of 132 KV DCSS transmission line Details 8Tender for design, supply and installation of 300 Wp capacity of standalone Off-grid solar PV power Details 8Tender for hiring of one number 250MT hydraulic crawler crane Details 8Tender for construction of additional raw water res Details 8Tender for supply, transportation, erection. and commissioning of high mast lighting system Details 8Tender for procurement of spares for stage-1 and 2 crusher house spares Details 8Tender for providing and fixing of HV equipments viz. 36kV CT at various substations Details 8Tender for supply and supervision of erection, testing & commissioning of EOT cranes Details You can also click on Tendersfor more For reference purposes the website carries here the following newsclips: 8Qatar inaugurates solar plant to help power World Cup Details 8Foxconn looking to make Tesla's electric vehicles in future: Report Details 8Involve DMs in the work of setting up EV charging stations: Delhi chief secy to officials Details 8Tesla Tops Battery-Electric Vehicle Registrations in Germany, Beating Volkswagen Details 8Ker students develop electric car win laurels at global competition Details 8India needs a balanced energy portfolio Details 8Whitehaven Coal output slumps 23% as floods sweep New South Wales Details 8Coal India will continue to be dominant player in coal sector, despite competition: Chairman Details 8Corporate funding in global solar sector falls 18% to $18.7 bn: Report Details 8India-led Alliance Bats for Diverse Solar Energy Market Details 8Commercial, industrial consumers have opportunity get green tag says official Details 8ISA identifies 3 barriers to global solar adoption Details 8Dependency on fossil fuel unhealthy: Power Minister RK Singh Details 8Regulator can’t revise power tariff payable to discom in the guise of prudence check: SC Details 8Ather Energy raises $50 million in new funding round Details 8Do not bow to political pressures to check illegal coal mining : Meghalaya HC to CS, DGP Details You can also click on Newsclips for moreDetails
8S/S site has been changed as suggested by the MOP and CEA. 8Approval from PTCC, railway, civil aviation, and defense is yet to be granted. 8Rerouting of the transmission line to avoid an eco-sensitive zone with minimum use of forest area has been completed 8RFQ for the 400KV GIS s/s works package is likely to be floated in December 2022. Click here for more detailsDetails
8Construction of the approach road has been completed. 8Hydrology report has been approved by the CWC. 8PMC has been selected for the same project. 8Pre-bid meeting is yet to be conducted for the civil works package(lot-1). 8RFQ for the Civil package(lot-2) is likely to be floated in December 2022. Click here for more detailsDetails
8Forest clearance stage 1 is pending at the DFO and stage 2 is pending at the nodal office. 8Drilling and drifting works are in progress at the site. 8Geological investigation and topographical survey at the site have been completed and it was approved by GSI 8PMC has been selected for the project. 8RFQ for the EPC package for main plant works is likely to be floated in Q1 2023 Click here for more detailsDetails
8Land acquisition and resettlement have been completed. 8Forest clearance stage 1 and stage 2 have been granted by the DFO 8Contractor has been selected for the civil works package. 8Pre-bid meetings have been completed for HM works. 8RFQ for the EM works packages likely to be floated in January 2023 Click here for more detailsDetails
For reference purposes the website carries here the following reports: 8Get the outage programme of generating units and transmission lines for the coming three months: Maintenance is when business opportunities will be available for vendors Click on Reports for more 8Solar Industries India Ltd appoints a director Click on Reports for more 8Barra Coal Block gets bidder: Find out bidder details here Click on Reports for more 8K.P. Energy Ltd gets order for erection and commissioning of a wind power project Click on Reports for more 8Electric motor manufacturer plans to double manufacturing capacity. Click on Reports for more 8Find out what was the pooled power purchase price of Gujarat utilities for the year 2021-22. Click on Reports for more 8The website carries here a case history on how Chinese investments in Latin American has made the all-important difference on the ground. Click on Reports for more 8L&T Technology Services: The outlook is not all that bright for the moment, says analysts. Click on Reports for moreDetails
8The company will provide power transformers to upcoming renewable energy park in Gujarat enabling sustainable energy system for a clean energy transition 8Find out more Click on Reports for moreDetails
8Annual fixed charges has been allowed for 2022-24 tariff period for following transmission asset 8400 kV Pugalur (HVDC Station)-Pugalur (Existing) (Quad) D/C Transmission Line along with associated bays 8400 kV Pugalur (HVDC Station)- Arasur D/C Transmission Line along with associated bays Click on Reports for moreDetails
8The company has sought a Category 'III' trading licence for inter-State trading in electricity in the whole of India 8Find out what the regulator said Click on Reports for moreDetails
8A Memorandum of Loan Agreement (MoA) has been signed with SJVN Thermal Pvt Ltd for financing a 2x660MW green field project 8Find out more Click on Reports for moreDetails
8The regulator has approved the banking transaction with the trader M/s Arunachal Pradesh Power Corporation Pvt Ltd and M/s. Kreate Energy (I) Pvt Ltd for managing the power deficit 8Find out more Click on Reports for moreDetails
8A sick solar power company has been taken over by another outfit, and the the buyer of power is seeking a review of the tariff, claiming that the new owner has taken over the company for cheap. 8Also the buyer seems to also have objections to replacement of damaged solar panels in the power complex 8It is an interesting case with all-round implications. Click on Reports for moreDetails
8This solar O&M company has a portfolio of 7.2 gigawatts 8The focus now is on increasing international O&M portfolio through organic and inorganic growth. With more and more processes and procedures digitized in O&M, we are unlocking the value of predictive maintenance and making increased use of it, which results in improvement in efficiencies and general reduction of our levelized cost of electricity. 8On the battery storage front too, the company is moving fast, and it has added a team of battery experts, sales and execution team to capture the global market 8There are big opportunities ahead. Click on Reports for moreDetails
8Here is a company that does third party sale business in Gujarat. 8It develops and maintains grid-connected IPP solar power projects 8Revenue is generated by supplying the power, generated from its solar power plants to reputed business houses Click on Reports to find out more on the robustness of this modelDetails
8The truing up exercise cannot be used set right original tariff determination covenants retrospectively, the Supreme Court has ruled 8This has all-round implications. Click on Reports for moreDetails
8This solar power project is "permitted" for up to 50% of the contract demand of the consumers. 8The wheeling of energy is also permitted to 50%. 8These caveats are now under challenge and they pose some interesting questions around the idea of promissory estoppel Click on Reports for moreDetails
8Forest clearance stage 1 has been approved by DFO but forest clearance stage -2 is pending at the regional office. 8Public hearing has been completed. 8EIA/ EMP study report has been prepared by Vimta Labs and it has been approved by the MoEF 8Preparation of DPR has been completed and it was approved by CEA. 8EPC has been selected for the project. 8RFQ for the civil works package (lot-1) is likely to be floated in Q1 2023 Click here for more detailsDetails
8TOR has been granted by the MoEF. 8Construction of the approach road is in progress it is in the final stage of completion. 8FC stage-1 is pending at the nodal office. 8Hydrology report has been completed and it is yet to be approved by the CEA 8RFQ for the drilling and drifting works is likely to be floated in November 2022. Click here for more detailsDetails
For reference purposes the website carries here the following tenders: 8Tender for supply of 7000 nos GI earth pipe Details 8Tender for construction of CT PT VCB plinths and cable Details 8Tender for rate contract for annual maintenance of MGR track Details 8Tender for upkeeping of coal, east and west 33kV substation Details 8Tender for manual transportation of heavy duty steel cogs Details 8Tender for shifting and re-routine of HT XLPE cable and LT PVC cable Details 8Tender for transportation of coal Details 8Tender for construction of 220/132/33 kV GSS and 220 kV DC transmission line Details 8Tender for procurement of PA fan impeller with shaft assembly Details 8Tender for construction of 132kV substation Details 8Tender for overhauling, servicing, repair & maintenance of of 33kV circuit breakers Details 8Tender for breakdown and shutdown maintenance works in ash slurry disposal pumps Details 8Tender for civil works for increase capacity (form 2x63 to 3x63) MVA and 1 No 132/33 KV bay at 132 KV s/s Details 8Tender for estimate for proposed seprate / independent 33 KV feeder Details 8Tender for supply of LT robust fuse Details 8Tender for work of construction of control room and chain link mesh fencing other civil work at 33/11 kV Substation Details 8Design, manufacture, supply, erection, testing and commissioning in supervison of approved OEM make for different types of RMUs, SF6 insulated Details 8Tender for work for maint.works and deployment of manpower for O and M of various 220 KV and 132 Kv s/s Details 8Tender for procurement of complete jacking oil pump jop assembly without motor Details 8Tender for procurement of spares for HFO LDO pressuring pumps make pumps of oil pump house Details 8Tender for procurement of galvanised plain and galvanised corrugated sheets for various thermal power stations Details 8Tender for manufacture and supply of ERW steel tubes for air preheaters Details 8Tender for manufacture and supply of M.S. straight pipe, centre feed pipe, carbon steel pipe Details 8Tender for modificatioin/shifting work of 04 nos. 220/132 kV line Details 8Tender for procurement of PT distribution panel for 400kV and 220kV substation Details 8Tender for supply, erection, commissioning of modified (double sealing) air pre-heater Details 8Tender for construction of HT/LT lines Details 8Tender for supply/installation and rectification/replacement of outstanding works of monitoring instruments and data acquisition system Details 8Tender for transformer oil filtration and testing at 132KV substation Details 8Tender for supply of spares for substations and transmission lines under 220KV Details 8Tender for purchase of dial type thermometer (DTT) for power station Details 8Tender for covering crusher house Details 8Tender for transportation of 7.0 LMT coal Details 8Tender for renovation works to AB wing, PMU, RAO and IT sub unit under electrical Details 8Tender for supply of caustic soda lye for all three power generating station Details 8Tender for annual maintenance contract for the works related to protection & control system of power house Details 8Tender for supply of master controllers for 02 nos. of 165/30 ton EOT cranes Details 8Tender for replacement of IPT rotor and IPT inner casing, replacement of LPT rotor, LPT inner-inner casing Details 8Tender for SOP to proposed 250 KVA, 11/0.4KV, s/stn Details 8Tender for offline vibration measurement and analysis of rotary Details 8Tender for ASC towards co-ordination with coal Details 8Tender for providing plinths for enhancement of power transformer Details 8Tender for overhauling/servicing of 400KV circuit breaker Details 8Tender for fixing of earth wire alongwith P & F accessories against missing earth wire of EHV lines Details You can also click on Tenders for more For reference purposes the website carries here the following newsclips: 8Delhi to get 100 electric vehicle charging stations in two months, says CM Arvind Kejriwal Details 8200 electric buses to be deployed in JK’s twin capital cities: Officials Details 8Mangaluru: MIA adds third EV to its motor pool as it marches to ‘Net Zero’ goal Details 8Mercedes-Benz in Preliminary Offshore Wind Deal for Electricity From 2027 Details 8EKI launches Rs 1,000 cr Climate Impact Fund Details 8Suzlon wins order for 48.3 MW wind power project from Adani Green Details 8India’s Airports Adopting Green Energy Fast Details 8Mexican president outlines renewable energy plan ahead of Kerry visit Details 8Repsol, Engie in race for renewable power company Asterion -sources Details 8India’s Tata Power confirms Cyberattack on its IT Infrastructure Details 8SJVN unit, Assam discom to form JV to set up 1kMW floating solar projects Details 8Rajasthan govt leases barren land to power solar energy plants Details 8Bidding for Rs 19.5k crore Round II of solar module PLI in a week Details 8Must keep inexperienced power provide chain in India, says Minister Piyush Goyal Details 8Excel Realty N Infra to foray into domestic solar industry Details 8MG Motor to launch affordable EV car in bid to compete with Tata in Indian market Details 8DY Chandrachud to head panel for appointment of electricity tribunal Details 8HC stays case against CoalMin’s ex-official; setback for ED Details 8CIL didn't hike domestic coal price despite unprecedented rate hike globally: Govt Details You can also click on Newsclips for moreDetails
8In Uttar Pradesh, the wheels turn slowly indeed 8The super critical power plants of this state utility is about to be commissioned 8But production from a linked coal mine is unlikely to start for a very long time indeed. Click on Reports for moreDetails
8Vedanta plans to contract renewable energy capacity of 3-4 GW by 2030 to fulfill the low carbon Aluminium requirement 8So company seeks to allow import of RE power through the already existing 400kV D/C line with no charges Click on Details for moreDetails
8There was all-round scepticism over whether anyone will be able to stand up to the demands of the Draft Central Electricity Authority (Flexible Operation of Thermal Power Plants) Regulations, 2022 8But in start-stop manner, some plants and generators seem to be making progress Click on Details for moreDetails
For reference purposes the website carries here the following reports: 8Electric vehicles in India: Filling the gaps in awareness and policy. Click on Reports for more 8How will wind farms fare in Bangladesh? Click on Reports for more 8Here is an update on capex plans for small power projects Click on Reports for moreDetails
8EKI Energy Services Ltd has announced a tie-up with Singapore based fund management company for launching a Rs 1,000 Crores Climate Impact Fund to develop climate change mitigation projects 8The projects would generate high quality carbon credits for its investors by delivering significant emission reductions 8The projects will be deployed across remote locations in India Click on Reports for moreDetails
8GMDC is the largest lignite seller in the country 8Revenues from operations were reported at Rs 1694 crores in H1FY23 as compared to Rs 950 crores in H1FY22 Click on Reports for moreDetails
8This Company continuously thrives to deliver quality products and services and over a period of time has become a leading manufacturer of transformers in the country 8Find out more Click on Reports for moreDetails
8A new wind power policy has gone through a round of iteration based on feedback from stakeholders 8The policy has been modified significantly as a result 8But needs to be done is the consensus Click on Reports for moreDetails
For reference purposes the website carries here the following tenders: 8Tender for structural fabrication,erection works of FGD including LHP & GFP project Details 8Tender for supply of spares blocking capacitors for numerical generator Details 8Tender for construction of civil foundation and other misc civil works in yard at 132 KV GSS Details 8Tender for procurement of armoured copper control cable Details 8Tender for supply of upgraded generating units energy meters Details 8Tender for balance of system package including 03 years comprehensive operation & maintenance for 100 MW grid connected SPV power plant Details 8Tender for electrification works in HRDC and WRI for CEFC establishment Details 8Tender for fabrication, installation and commissioning of cyclone separators of double discharge Details 8Tender for repairing of boiler Details 8Tender for transportation of coal by tippers Details 8Tender for biennial service contract for picking of stone and foreign materials from running conveyor belt Details 8Tender for procurement of iso kinetic coal sampler kit Details 8Tender for replacement of insulation underneath the retaining rings Details 8Tender for routine maintenance of electrical system of soot blowers and breakdown maintenance of soot blowers Details 8Tender for supply of 33KV polymer AB switches Details 8Tender for work contract for routine maintenance of boiler pressure parts and fuel oil handling system Details 8Tender for procurement of AR/GR/exceller grade ammonia solution for 2x600 MW Details 8Tender for annual work contract of day to day routine maintenance of electrical control lighting Details 8Tender for construction of transformer platform at 33 kv S/S Details 8Tender for erection, testing, commissioning, trial operation and handing over of mechanical systems for FGD Details 8Tender for design, engineering, procurement, fabrication, assembly, inspection, erection over berth conveyor Details 8Tender for stringing of ACSR panther conductor and 1 No. earth wire in the existing 110 KV DC towers Details 8Tender for procurement of 1100V LT UG PVC aluminium power cable Details 8Tender for renovation of LT line Details 8Tender for replacement of ACSR conductor by arial bunch cable Details 8Tender for supply of different ratio 11KV Epoxy Resin Cast C.T. Details 8Tender for ARC for operation and maintenance of ash handling plant Details 8Tender for day to day operation of pumps and motors Details 8Tender for biennial rate contract for coal liasioning and supervision at mine Details 8Tender for supply of 11kV AB C with accessories Details 8Tender for construction of earthen raw water reservoir, raw water pump house, pipeline Details 8Tender for capital overhauling of genrator, generator revival, general overhauling of TG set & auxiliary works Details 8Tender for deposition & corrosion meter,portable liquid sampler and integral dissolved oxygen meter Details 8Tender for ARC for regular pumping out of ash water from ash dyke Details 8Tender for supply installation testing commissioning Of electrical lines upto 11 Kv voltage level distribution transformers Details 8Tender for work of chemical washing of disc insulators strings by using high insulating cleaner & protector on various 220kV & 132kV lines Details 8Tender for work of providing retaining structure to tower of 132 kv Details 8Tender for erection, testing and commissioning of power cycle piping and all associated piping & insulation works Details 8Tender for restoration of 36.15 MW bhel make STG unit Details 8Tender for dismantling of overhead line and laying of cable for power supply Details 8Tender for procurement of spares for TRF makes crushers and VGFs Details You can also click on Tenders for more For reference purposes the website carries here the following newsclips: 8Nuclear energy can unshackle the chains of coal geopolitics Details 8Conference of power and new & renewable energy ministers of states and UTs held in Udaipur Details 8Portugal bets all on renewables after abandoning coal Details 8Andhra Pradesh decides to roll out smart meters project introduced by the Centre Details 8EVs, hybrids to make up 40% of Renault's annual Europe gross sales Details 8Tax the rich for more EVs? California Democrats split Details 8Wind Energy in India: Tailwinds and Headwinds Details 8India to have over 65% power generation capacity from non-fossil fuels by 2030: RK Singh Details 8Nagaland discoms see maximum aggregate loss of 60.39% in 2020-21: Report Details 8WBSEDCL invites bids to install 205 EV charging and battery swapping stations in PPP Details 8Turkish prosecutors launch probe into mine blast in Turkey Details 8Why is India opposing G-7's energy transition plan to phase out coal Details 8Power utilities to roll out smart meters to conserve energy Details 8ReNew Power to invest Rs 30,000 cr to scale up green capacities: Chairman Details 8Altigreen plans to raise up to Rs 1k cr next year to fund next phase of growth Details 8Can Bhavish Aggarwal become India’s answer to Musk or will he collapse? Details 8Coal to be back again as gas becoming unaffordable: FM Nirmala Sitharaman Details You can also click on Newsclips for moreDetails
8An average energy consumption per day of Northern Region was 1435.92 Mus and it was 18.5 % higher than Sep 2021 8Find out the NR grid highlights for September 2022 Click on Details for moreDetails
8NTPC plans to implement Advanced Process Control (APC) in the Simhadri Super Thermal Power Station 8Find out the advantage of this feature Click on Details for moreDetails
8Powergrid has been appointed as the Nodal agency for implementation of Dynamic Line Rating (it is a pilot project) in 400 kV Madurai-Tuticorin D/C line Click on Details for moreDetails
8The demand of south states is projected to increase slightly in October compared to September 8So the advisory to the states is to take precautionary measures like staggering loads, etc. especially when solar power switches off 8All states have been told to maintain LGBR by planning for adequate purchases Click on Details for moreDetails
8Forest clearance stage-1 is pending at DFO and stage-2 is pending at the regional office. 8Land acquisitions are in progress at the upper reservoir site. 8Drilling works have been completed and drifting works are in progress. 8RFQ for the PMC works is likely to be floated in January 2023. 8Find out who the DPR consultant was. Click here for more detailsDetails
8Forest clearance stage 1 has been approved by DFO but forest clearance stage -2 is pending at the nodal office. 8Public hearing phase -1 has been conducted and stage -2 is yet to be conducted. 8GSI has approved the geotechnical investigation and topographical survey report 8PMC has been selected for the project. Find out who it is. 8RFQ for the civil works package is likely to be floated in Q1 2023 Click here for more detailsDetails
8Civil works are in progress for SG and it is in an advanced stage of completion. 8Erection and installation of the DeNOx system are yet to be started. 8Slow work progress by the BOP sub-contractor for CHP, DM plant work. 8RFQ for the Chlorine dosing system package is likely to be floated by December 2022. Click here for more detailsDetails
8A contractor has been selected for S/S works. Find out who it is. 8Approval from PTCC, railway, civil aviation, and defense is in progress. 8EPC selected for T/L works. 8Site preparation has been completed for the P/S works and erection works are yet to be started for the 8RFQ for the ACSR moose conductor package is likely to be floated in November 2022. Click here for more detailsDetails
8Indian EPC firm gets a director Click on Reports for more 8This is one small solar company that gets its payments on time, while maintaining a P-90 benchmark. Click on Reports for more 8SWELECT incorporates a Wholly Owned Subsidiary (WOS) to set up solar power project Click on Reports for more 8The war in Ukraine will not alter the energy transition matrices in the long run, and the transition will be rapid going ahead. Click on Reports for more 8CERC has come up with new Deviation Settlement Mechanism Regulations, 2022, so this state government is seeking comments. Click on Reports for moreDetails
8Concentrated solar power plants have not really taken off in India? 8What kind of barriers do they face? 8And how can they be overcome? Click on Reports for moreDetails
8A Memorandum of Understanding (MoU) has been signed between the generator and Mitsubishi for demonstrating hydrogen co-firing in a gas-based power plant 8Find out more Click on Reports for moreDetails