All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


Oct 2021

8RFQ for the EIA consultant is likely to be floated in the second half of Q4 2021.
Click here for more details
Details
8RFQ for supply, design, engineering, erection, installation, testing, and commissioning of switchyard is likely to be floated in December 2021.
Click here for more details
Details
8Bids are invited for Design, engineering, manufacture, erection, supervision, pre-commissioning, commissioning and performance testing of equipment of FGD System
8Also including all associated Electrical, Control & Instrumentation, Civil, Structural and Architecture works in the package
8Know more date details with contacts
Click on Reports for more
Details
8Renewable energy (RE) with 101,532 MW of capacity is the second largest in terms of capacity share
8It accounted for less than 10 percent of power generation in 2020-21, equaling hydro-power generation that has only half the capacity as RE
8Coal that accounted for 54 percent of capacity contributed over 79 percent of generation in 2020-21
8In terms of power generated per unit of capacity that represents economic efficiency, RE power is the least efficient in 2020-21
Click on Reports for more
Details
8The Merchant rates increased significantly by 300% YoY to INR10.9/kWh in Oct’21 due to rise in power demand and shortage in power supply, given the coal crisis
8State as Punjab, Gujarat and Maharashtra have agreed to procure power from Tata’s Mundra station at INR4.5-5.5/unit, which will lower their purchases from the exchange
8So the prices are expected to normalise by the end of Oct’21
8Also, with improved coal dispatches by CIL, the power generation across coal-based stations is expected to improve, going ahead
Click on Reports for more
Details
8Rajasthan Vidyut Utpadan Nigam Ltd (RVUNL) has run out of cash to pay for coal and keep running the state’s power plants
8RVUNL owes INR27.00 bn to Coal companies
8The coal suppliers had sounded out RVUNL that supply would be disrupted if dues are not paid
8Company paid INR1.25 bn to coal supplier to resume the supplies. But supplier has decided to supply only 3 rakes
8All the government power plants require 16 rakes of coal per day
8It shut down 600 MW unit of a thermal power plant
8Another 1500 MW thermal power station could be next in line
Click on Reports for more
Details
8Damodar Valley Corporation (DVC) will clear dues to the tune of INR12 bn to the different CIL subsidiaries, which will augment the coal supply to different plants of DVC
8This would ramp up the power generation from DVC plants from the current level of 61 percent to a PLF (plant load factor) of 90 percent
Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for work of overhauling & servicing of 33kV circuit breaker Details
8Tender for AMC for work of servicing/maintenance of battery sets & charger Details
8Tender for routine, preventive and breakdown maintenance work of water treatment plant tower and cooling water system Details
8Tender for supply, erection, testing & commissioning of 245kV Hybrid Switchgear Details
8Tender for supply and retrofitting of LT switchgear Details
8Tender for Designing, erecting precast staircase for cooling tower Details
8Tender for Supply, transport and erection of QD+6m tower Details
8Tender for Supply, transport and erection of various types of towers for erection of 110 KV DC line Details
8Tender for Earthwork excavation, stub setting, Supply, Transport and erection of 9m tower Details
8Tender for work of complete operation and maintenance of coal handling plant Details
8Tender for Procurement of 3000 KL LVFO for Operational support Details
8Tender for annual contract for routine, breakdown & capital maintenance of C&I equipments Details
8Tender for Augmentation of Substation by Addition of 220/33kV 50MVA Power Transformer Details
8Tender for Biennial Rate Contract for services of JCB-3D Machine at Feeder breaker & Apron Feeder Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Time to plan coal exit Details
8Monsoon-Led Coal Crisis Exposes Vulnerability of India’s Energy Systems! Time to Promote Alternatives? Details
8BluSmart Plans to Expand its EV Fleet to Six Cities in India: Interview Details
8India ask world leaders to de-carbonize energy sector using renewable energy sources Details
8BHEL completes renovation of Baira Siul hydro project, commissions third unit Details
8India’s 450GW renewable energy goal by 2030 doable, says John Kerry Details
8Making sense of the power crisis debate Details
8Maharashtra govt refused to lift additional coal, claims Union minister Danve Details
8Power crisis: Govt looks to revise coal stocking norms for thermal plants Details
8India considering strategic stockpiling of gas and imported coal Details
Click on Newsclips for more
Details
8RFQ for the design, supply, engineering, erection, installation, testing, and commissioning of 400kV 2x D/C line s/s is likely to be floated in December 2021.
Click here for more details
Details
8RFQ for supply, erection, installation, testing and commissioning of ACSR moose conductor package and its auxiliary is likely to be floated in December 2021.
Click here for more details
Details
8Company has successfully raised a USD 75 million, 5-year Secured Overnight Financing Rate (SOFR) linked Syndicated Term Loan with Sumitomo Mitsui Banking Corporation (SMBC)
8REC has also entered into interest rate swap referencing SOFR tohedge the interest rate risk on this facility, which is the first such deal by any Corporate in India
8The proceeds from this facility shall be utilized to fund infrastructure power sector projects as permittedunder the ECB guidelines of the Reserve Bank of India
Click on Reports for more
Details
8China's thermal coal prices have surged over 200% this year to record highs as mining safety inspections, anti-corruption probes and floods at major mining regions hurt supplies
8China's major coal producers have vowed to cap thermal coal prices this winter and next spring, after the government asked state-backed firms to ensure stable coal and power supply "regardless of costs"
Click on Reports for more
Details
8The company seeking for grant of registration to establish and operate a Power Exchange and permit it to commence the operation of Power Exchange
8Know more about regulator's order
Click on Reports for more
Details
 AFC allowed for 2019-24 tariff period for following transmission assets under under the scheme “Provision of Bus Reactors in the Northern Region”
8400 kV, 125 MVAR Bus Reactor at Gorakhpur
8400 kV, 125 MVAR Bus Reactor at Allahabad
8400 kV, 125 MVAR Bus Reactor at Manipuri
8400 kV, 125 MVAR Bus Reactor at Kankroli
8400 kV, 125 MVAR Bus Reactor-I at Vindhyachal
Click on Reports for more
Details
8An average of Rs 59.50 crore is allowed as AFC for the 2021-24 tariff period for 400 kV Transmission System associated with Farakka-I and II STPS in Eastern Region
8Know more about the trued-up AFC allowed in respect of the transmission asset for the 2014-19 tariff period
Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for work of operation and mechanical maintenance of coal handling plant Details
8Tender for supply of grinding rolls & bull ring segments Details
8Tender for the supply of economizer coils Details
8EOI for transportation of coal via Road Mode from various mines to power station Details
8EOI for transportation of coal via Rail-cum-Road (RCR) mode for power station Details
8Tender for work of coal transportation by Road mode from mines to thermal power station Details
8Tender for TG bearing inspection and generator mechanical works Details
8Tender for Supply of 5.0 Lakh Metric Tonnes of Imported coal to TPS Details
8Tender for Construction of foundation for equipment/ structures and cable trench at 110 kV Substation Details
8Tender for Supply, Installation, Testing and Commissioning of Modular Clean Agent Systems Details
8Tender for supply of 400kV XLPE cable & accessories Details
8Tender for Round the clock running, preventive and breakdown maintenance of MAX-DCS system Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Energy crunch hits global recovery as winter approaches: Report Details
8EV Energy Firm Sùn Mobility Nets $50 Million In Funding From Vitol Details
8Indian Energy Exchange jumps to all-time high on bonus share plan Details
8State-run NTPC looks to pick up around 5% stake in PXIL Details
8Coal supply prioritised temporarily to power sector to top up dwindling stock: CIL Details
8Rains could play party spoiler for power sector Details
8EDF Renewables UK sells 49% of the Blyth wind farm to Malaysian TNB Details
8India aluminium producers draw costly power from grid Details
Click on Newsclips for more
Details
8RFQ for design, supply, fabrication. erection, installation, testing, and commissioning of lattice tower is likely to be floated in December 2021
Click here for more details
Details
8RFQ for design, supply, fabrication, erection, installation, testing, and commissioning of 220 Kv GIS s/s works is likely to be floated in Q1 2022.
Click here for more details
Details
8The FGD cost is expected to be in the range of Rs.0.30 crore/MW to Rs.0.70 crore/MW having corresponding varying scale of impact on power procurement cost for the Discoms
8GoI increased the cess levied on coal for thermal power plants from Rs.50/tonne in June 2010 to Rs.400/tonne at present which is already costing around Rs.0.18/kWh to the consumers
8These consumers would be additionally burdened to the tune of around Rs.0.05/kWh if the entire cost of FGD capex is passed on in the retail tariff
Click on Reports for more
Details
8The GoI has identified 442 thermal power plants for FGD implementation with an aggregate capacity of around 170 GW
8There has been little progress in FGD installations with only six plants having an aggregate capacity of 2.2 GW, representing only 1% of identified capacity completing FGD installation as of August 2021.
8In the central sector, FGD implementation is progressing at a faster pace wherein bids have been awarded for around 87% of the identified capacity whereas, the progress is very sluggish with only 8% and 28% in the state and the private sector respectively
Click on Reports for more
Details
 An average of Rs 132.55 crore is allowed as AFC for the 2021-24 tariff period for followig transmission assets in Northern Region
8400 kV D/C Baspa-Nathpa Jhakri Transmission Line at Wangtoo
8400 kV D/C Karcham-Wangtoo-Abdullapur Transmission Line
Click on Reports for more
Details
AFC allowed for 2019-24 tariff period for following transmission assets under under ‘Unchahar-III Transmission System’ in Northern Region
8220 kV S/C Unchahar- Raibareilly Transmission Line along with associated bays
8100 MVA, 220/132 kV ICT-III at Raibareilly along with associated bays
8100 MVA, 220/132 kV ICT-II at Raibareilly Sub-station along with associated bays
8Know more about the trued-up AFC allowed in respect of the transmission asset for the 2014-19 tariff period
Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for design, engineering, manufacturing, erection, testing and commissioning of 33 kV GIS Indoor Panels Details
8Tender for retrofitting of LT Modules of higher KW motor feeders with draw out type air circuit breaker Details
8Tender for Design, Manufacturing, Supply, installation, Erection and Commissioning of 245KV Isolator Details
8Tender for routine, preventive & breakdown mechanical maintenance works of AHP Details
8Tender for Procurement of LVFO transported by one full BTPN Oil Rake Details
8Tender for Erection & Commissioning of overhead 11kv line Details
8Tender for Annual Overhauling of Power transformers Details
8Tender for Civil Structural Works, Erection, Testing & Commissioning for Installation of Dry Sorbent Injection technology Flue Gas Desulphurization (FGD) System Details
8Tender for Providing & fixing of digital communicable Transformer Auxiliary Monitoring system Details
8Tender for the Supply of 5KV High Voltage Digital Insulator Tester Details
8Tender for Works of Overhauling and servicing of 6.6 KV VCB breakers Details
8Tender for overhauling of PA, FD, IF fans and flue gas ducting of boiler Details
8Tender for the supply of HT XLPE power cable Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8GIS-based Geospatial Energy Map of India launched Details
8Higher coal prices to impact Vedanta's profitability in third quarter: Report Details
8NTPC eyes slice of power exchange, may buy 7-10% stake Details
8Coal India arm MCL dispatches over 5.47 lakh tonnes of dry fuel Details
8Coal crisis: Power projects with less than 4-day coal stock dips to 61 Details
8Running out of time': Asia struggles to kick coal addiction Details
8Coal, railway, power ministers discuss coal supply situation at power plants Details
8China coal hits record high amid tight supplies Details
8Delhi, TN lead India's switch to electric cooking with 17% adoption: CEEW Details
8Indian Energy Exchange jumps to all-time high on bonus share plan Details
8Siemens-Backed Energy Storage Firm Fluence Eyes $744 Million U.S. IPO Details
Click on Newsclips for more
Details
8RFQ for 220/22 kV GIS S/S is likely to be floated in November 2021.
Click here for more details
Details
8Regulator allowed to a trader to establish and operate Power Exchange
8The commencement of operation of the Power Exchange is subject to approval of the Bye-Laws, Rules, and Business Rules and the technology including trading software
Click on Reports for more
Details
8A trader has sought approval of the Commission to introduce Integrated Day Ahead Market (IDAM) for providing exclusive trading in renewable energy (RE)
8The Commission approves the proposal of trader to introduce IDAM consisting of Day Ahead Contract in RE segment and Day Ahead Contract in the existing conventional segment
Click on Reports for more
Details
8An average of Rs 29.34 crore is allowed as AFC for the 2021-24 tariff period for Transmission System for URI Hydroelectric Project (4x120 MW) in the Northern Region
Click on Reports for more
Details
8Coal consumption is surging in gas-abundant United States and in gas-importing Europe.
8In both these mature energy markets, increase in the price of natural gas has forced some power generators to shift to coal driving up the price of coal
8Fossil fuel-based electricity is set to cover 45 percent of additional demand in 2021 and 40 percent in 2022.
8Coal-fired electricity generation, after declining by 4.6 percent in 2020, is expected to increase by almost 5 percent in 2021 to exceed pre-pandemic levels and grow by a further 3 percent in 2022
Click on Reports for more
Details
8A Trader has sought approval of the Commission to introduce Green Day Ahead Contract (GDAC) in Day Ahead Market (DAM) on its platform to provide avenues to existing and prospective RE generators for sale of RE through the Power Exchange
8The Commission approves the proposal of the trader to introduce GDAC in Day Ahead Market (DAM)
Click on Reports for more
Details
8Distribution is the most important link in the entire power sector value chain
8As the connecting thread between consumers and Discoms, it is the revenue-generating, breathing organ of the power sector
8However, over the years, the depleting financial health of the discoms has left the sector bleeding
8The distribution sector choked while aiming to fulfil the goal of providing reliable, clean, affordable and quality power to all
8The discoms are unable to invest in T&D infrastructure, augment investment to enhance renewable energy deployment and provide good quality power to all
8The poor financial health of discoms further hampers the ability of power producers to sell power in the market, thereby incurring losses and defaulting on their loan obligation
Click on Reports for more
Details
AFC allowed for 2019-24 tariff period for following transmission assets under “Transmission Schemes for enabling import of NER/ER surplus power
 by NR” in Eastern Region
8400 kV line bays at Biharshariff Sub-station along with 1x80 MVAR Switchable Line Reactor
8400 kV line bays at Purnea Sub-station
8400 kV line bays along with 02 numbers 80 MVAR Switchable Line Reactors
8Know more about the trued-up AFC allowed in respect of the transmission asset for the 2014-19 tariff period
Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for repair / reclamation of 14 MVA, 11/132 KV power transformer Details
8Tender for Supply of cable joining kit suitable for 11kV XLPE insulated armoured power cable Details
8Tender for the supply of galvanised steel flange Details
8Tender for BMC for preventive/breakdown service maintenance works for Compressors Details
8Tender for Procurement of 1800mm width Nylon/Nylon conveyor belt Details
8Tender for procurement of 9 Meter long PCC poles Details
8Tender for Construction of 66KV GIS Substation Details
8Tender for Construction of 220KV AIS Substation Details
8Tender for Protective coating on spillway gates & HR gates Details
8Tender for Procurement of portable testing equipments Details
8Tender for work of Replacement of 66 KV Line Details
8Tender for Biennial Contract for Maintenance of Railway Siding at TPS Details
8Tender for design, manufacture, supply, testing and commissioning of electrical drives Details
8Tender for the Supply of 230 KV, 2000 Amps AB Switches With and Without earth Details
8Tender for the Supply of 22/33KV DBCR AB switches Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Coal India, the fall guy for power crisis Details
8Mukesh Ambani’s next target in solar play: battery technology company Details
8Sterlite Power bags Rs 324 crore transmission project Details
8Coal India Official Says Supply To Non-Power Sector Regulated, Not Stopped Details
8India introduces draft resolution in UNGA to grant Observer Status to International Solar Alliance Details
8India's coal import dropped in August despite higher fuel demand from power sector Details
8NLC India Talabira project starts coal supply to NTPC's Darlipali power station Details
8Power Global to invest $25 million to set up battery infrastructure facility in India over next 2-3 years Details
8Coal ministry to augment fuel supply to power sector from captive mines Details
8500MW Coal-Fired Power Plant In Madhya Pradesh Trips Adding To Power Crisis Details
8Centre Committed To Providing All Possible Support To Make J&K Power Surplus: Singh Details
8India's electricity demand picks up in October as coal shortage lingers Details
8All you need to know about 'power crisis' in India Details
8India raises concern over climate financing, technology transfer Details
Click on Newsclips for more
Details
For reference purposes the website carries here the following tenders:
8Tender for procurement of 3 Phase, 4 wire CT/PT operated fully static and AMR compatible HT Tri-vector feeder energy meters Details
8Tender for annual rate contract for maintenance of electrical systems & equipments Details
8Tender for the work of annual maintenance of Hydro- Generators Details
8Tender for routine operation and preventive/ breakdown maintenance of Soot blower system Details
8Tender for operation and maintenance of PDFAC system and wet sluice system Details
8Tender for biennial job contract for running, breakdown and overhauling maintenance of XRP-1003 Coal mills Details
8Tender for design, manufacture, testing, and delivery of 11KV XLPE insulated PVC sheathed, screened armoured cable Details
8Tender for supply, installation, testing and commissioning for vibration monitoring system Details
8Tender for Overhauling job of 250MW Unit ESP Details
8Tender for operation and maintenance of Flue gas desulfurization (FGD) Details
8Tender for Supply and Installation of Seals for Hot Air Gate (HAG) Details
8Tender for balance work of Electrostatic precipitator (ESP) Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Coal availability to power plants likely to improve gradually in Oct: ICRA Details
8Rising global oil and coal prices pose macro risks to India: Morgan Stanley Details
8Coal crisis forces power-deficit states to go for costly buys Details
8Power ministry says no outage due to power shortage in Delhi Details
8Coal dispatches to power plants being enhanced: Joshi Details
8NLC India advances for second day; adds over 44% in one month Details
8Coal supplies to non-power sector plants may be kept suspended Details
8Rajasthan authorities ignored warning by Centre on coal crisis, reveals letter Details
875GW of excess fossil fuel capacity can be retired in South Asia: Report Details
8India commissions 7,701 MW rooftop solar capacity on 30 June 2021: Report Details
8India's October power supply deficit worst since March 2016 Details
8Delhi government floats tenders for inducting 140 electric buses Details
Click on Newsclips for more
Details
AFC allowed for 2019-24 tariff period for following transmission assets under “System Strengthening-XXIII” in Southern Region
8400 kV Bus Reactor at Hassan along with associated Bays and equipment
8400/220 kV transformer at Madurai Sub-station along with associated bays and equipment
81x125 MVAR 400 kV Bus Reactor at Trivandrum along with associated bays and equipment;
81x125 MVAR 400 kV Bus Reactor at Narendra (New) along with associated bays and equipment
Click on Reports for more
Details
Make money from following Cogeneration Power Plant
815 MW Cogeneration Power Plant
89 MW Cogeneration Power Plant
82.7 MW Cogeneration Plant
86 MW Cogeneration Power Plant
84 MW Cogeneration power plant
8Cogeneration Power Plant from 3 MW to 13 MW
Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for overhauling of HP Turbine, IP Turbine, Turbine Bearing, Turbine Valves & its Servomotors Details
8Tender for procurement of spares for Conveying Air Compressor Details
8Tender for work contract for operation and maintenance of HVAC System Details
8Tender for supply, erection, testing & commissioning of Battery banks Details
8Tender for dismantling of 220KV (GlS) and construction of 220KV (GlS) Details
8Tender for the work of repair, overhauling & servicing, maintenance, alignment of 220/ 132/33KV Isolator Details
8Tender for round the clock routine / preventive / breakdown / emergency minor mechanical maintenance of various auxiliaries and equipments Details
8Tender for two years CAMC of AAQMS system Details
8Tender for Installation and commissioning of 5.0 MW/6.5MWp (DC) Solar Plant Details
8Tender for AMC for maintenance work of electrical equipment Details
8Tender for Supply of Spares of CW & CEP Pumps for TPS Details
8Tender for installation, commissioning and testing of 80MVAr shunt reactor Details
8Tender for the Supply of Caustic Soda Lye Details
8Tender for turbine minor OH works along with Generator capital overhaul, optional works and complete OH of TDBFP Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Coal and Power shortage: How is the situation in Assam? Details
8Govt to ramp up per day coal production to 2 million tonnes in next 5 days: Sources Details
8Adani vs Reliance: Stage is set for India's Green Energy Revolution Details
8Modi government responsible for current shortage of coal in country: NCP Details
8Minister says Maha facing 4,000 MW power shortage, blames Coal India for fuel crunch Details
8Beset by coal shortages, India's power grid struggles to meet demand Details
8NTPC says Delhi discoms scheduling only 70 pc of power available with them Details
8Power Min asks NTPC, DVC to supply as much power as available to Delhi discoms under PPAs Details
8Reliance New Energy Solar to invest in NexWafe as strategic lead investor Details
Click on Newsclips for more
Details
8Ministry of Coal has launched the auction process of 40 new coal mines (21 new mines under CM(SP) Act and 19 new mines under the Tranche 3 of MMDR Act).
 8With coal mines rolling over from previous tranche, there shall be a total of 88 coal mines on offer
8These mines will help in generating Rs. 29,240 crores of annual revenue at peak rated capacities (PRC).
8It will also facilitate a capital investment of Rs. 42,304 crores for operationalising the coal mines and will provide employment to 3.81 lakh people
Click on Reports for more
Details
8Govt. of India accorded ‘Maharatna’ status to the state-owned Power Finance Corporation Ltd (PFC), thus giving PFC greater operational and financial autonomy
8This new recognition will enable PFC to offer competitive financing for the power sector, which will go a long way in making available affordable & reliable ‘Power For All 24x7’
Click on Reports for more
Details
8As spike in power generation has triggered the increased appetite for coal, supplies from Coal India have increased drastically
8Coal India believes that imported coal-based plants worked at low capacity as global coal and freight prices have shot up lately, which is resulting in demand shifting towards domestic coal fired plants
Click on Reports for more
Details
8The responsibility to supply power to the consumers is of the distribution companies and they should first serve their
8The distribution companies should not sell the power in the power exchange and starve their own consumers.
8 In case any state is found that they are not serving their consumers and selling power in the power exchanges at higher rate, the unallocated power of such states shall be withdrawn and allocated to other needy states
Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Tender for AMC for work of servicing/maintenance of Battery Sets Details
8Tender for AMC for work of overhauling & servicing of 33kV circuit breaker Details
8Tender for ARC of electrical system of Ash Handling Plant Details
8Tender for supply, installation, testing and commissioning of 11kV AB cable Details
8Tender for Overhauling of Boiler Pressure Parts Details
8Tender for Life enhancement of entire boiler structure and Mill Structure along and its associated structures Details
8Tender for supply & delivery of 220kV normal tower material Details
8Tender for balance work of civil, architectural, mechanical, electrical, control and instrumentation works for NDCT Details
8Tender for 220 kV bay shifting work at 220/132/22 kV Substation Details
8Tender for Work of Upgradation of SDH multiplexer System Details
8Tender for Supply, Installation and commissioning of UPS Batteries Details
8Tender for Work contract for online, routine, preventive & breakdown maintenance work in TG & BOP area Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8REC says coal shortage temporary; does not expect NPAs to increase Details
8Govt asks CIL to raise coal supply to power plants during Puja, augment it further after Oct 20 Details
8India working on an ‘Energy Storage’ policy Details
8SECL agrees to supply 29,500 metric tonnes of coal per day to Chhattisgarh Details
8Power Min asks states to utilise unallocated power from central plants Details
8Power situation grim in Punjab, long hours of power cuts Details
8Amid concern over ‘electricity crisis’, Shah meets Power and Coal ministers Details
8Tata Power Solar bags Rs 538-cr order from EESL to set up 100 MW projects Details
8India will need over 5,600 GW solar power capacity to reach net-zero by 2070: Report Details
8Centre issues guidelines on unallocated power to prevent misuse by states Details
8Power ministry mandates energy accounting for discoms to curb electricity losses Details
8Clean, alternative energy sources 'save the light' Details
8Coal shortage: Worried industry urges govt to buy power from other states Details
8CIL scales up coal supply to 1.51 MT per day amid power crisis scare Details
Click on Newsclips for more
Details
8RFQ for the design, engineering, manufacturer, supply, install testing, and commissioning of the ball mill is likely to be floated in Q1 2022.
Click here for more details
Details
8In order to promote use of biomass pellets in coal based thermal power plants, the previous policy is further modified
8Know more about the modification in the previous policy
Click on Reports for more
Details
8Due to high international prices of coal, supply of power even under PPAs by import based power plants has reduced by almost 30 % while domestic based power supply has gone up nearly 24 % in H1 of thisyear.
8The imported coal based power plants have generated about 25.6 BU against a program of 45.7BU
Click on Reports for more
Details
 < 1 2 3 > 

Showing 51–100 of 146 items