For reference purposes the website carries here the following tenders: 8Tender for work of operation and maintenance of PLC based complete ash handling plant Details 8Tender for repairing and HP-HVOF coating on needle tips and seating rings for power station Details 8Tender for procurement of OIP bushing for transformer Details 8Tender for repair and HP-HVOF coating of francis runner Details 8Tender for re-rubber lining and mastic lining of DM plant Details 8Tender for the supply of tongue rail for railway track Details 8Tender for retrofit & upgrade the existing GPS system with a GPS system compatible with the DCS system Details 8Tender for turnkey construction of 132kV railway traction bay at 132kV Details 8Tender for conversion of existing single phase and 3 phase LT lines on bare conductor to AB cable Details 8Tender for partial height raising of 11 KV feeder with covered conductor and conversion of LT 3 ph bare conductor Details 8Tender for fabrication, testing and supply of 400kV and 765KV SC/DC tower parts Details 8Design, engineering, manufacture, supply, construction, erection, testing & commissioning works for the EPC package for thermal power project Details 8Tender for construction of new 33/11 KV indoor type AIS substation Details 8Tender for construction model store within the premises of 33/11 KV substation Details 8Tender for biennial service contract for cleaning pre-crusher house zone from track hopper tunnel to crusher house Details 8Tender for AMC for maintenance of electrical instrumentation part of total dry ash system Details 8Tender for unloading of coal from wagons of railway rake, track clearance and shifting in stacking the same at gas plant coal storage yard Details 8Tender for leftover structural steel and their associated works of main plant Details 8Tender for deployment of excavator for loading, excavation of pond ash from ash dykes Details 8Tender for contract for the balance structure work (fabrication erection) at CHP Details 8Tender for work of shifting of 11KV OH line Details 8Tender for procurement of various sizes of armoured copper control cables Details 8Tender for work for annual plant maintenanceof generating units and auxiliaries Details 8Tender for BRC for operation /attending running repairs scheduled preventive and breakdown maintenance with overhauling of earth movers and mobile coal sampling Details 8Tender for AMC for maintenance activities in plan outage and emergency outages at various EHV substations Details 8Tender for AMC of servicing & overhauling of 33kV vacuum circuit breakers Details 8Tender for supply, installation and commissioning of DM water plant Details 8Tender for work of providing & fixing of 200W LED flood lights for maintenance of LMTs in switchyards Details 8Tender for the work of stub strengthening of towers of various 220 kV / 100 kV EHV line Details 8Tender for supply, installation & commissioning of 250KVA DG set at 400 kV substation Details You can also click on Tenders for more For reference purposes the website carries here the following newsclips: 8Lt Governor Chairs Review Meeting Of Power Development Department Details 8Discoms' Outstanding Dues Dip To Rs 113,269 Crore In Last 6 Months: Power Ministry Details 8Britain's energy watchdog proposes power price controls Details 8IIT Mandi researchers generate power from artificial light sources Details 8Tatas set up EV charging station in Guwahati Details 8Competitors chip away at Tesla's U.S. electric vehicle share Details 8Mainstream Renewable Power and Maple Power to Partner for Upcoming Celtic Sea Floating Offshore Wind Tender Details 8Chhattisgarh mulls to set up five pump storage hydel plants to generate 7,700 MW power Details 8Andhra Pradesh boosts to have highest number of energy efficient projects: Report Details 8TN eyes key role in offshore wind energy, may mop up $30 bn investments Details 8India’s Power consumption to grow at a moderate level: Report Details 8Haryana govt committed to resolving all issues in power sector: Minister Ranjit Singh Details 8Tata Power is evolving into a power solutions provider. What exactly does that mean? Details 8LG calls for strengthening monitoring mechanism of power projects in J-K Details 8Transition refers to minimising greenhouse gas emissions Coal India chief Details 8Inox Wind, Inox Green Energy Services reduce debt by Rs 411 crore Details 8India to pitch for international biofuel alliance at G20: Hardeep Puri Details 8COP27 was disappointing, but 2022 remains an historic year for international climate policy Details 8CEA projects 9pc jump in peak power demand to 235GW in April 2023 Details 8Privatisation is not the only solution to discoms woes say NTPC CMD Gurdeep Singh Details You can also click on Newsclips for moreDetails
8Find out an update on installation of the flue gas desulphurisation (FGD) system 8Also get an update on the Samalkot power project Click on Reports for moreDetails
8A wind generator had sought the extension of WBA for five years 8But this request has been denied due to a specific terms of state's wind policy 8Find out what specific term is? Click on Details for moreDetails
8The Central Transmission Utility (CTU) plans to implement transmission expansion schemes under ISTS 8Know more about this expansion scheme Click on Details for moreDetails
8Government plans to create a national portal where temporary allocation of power from a surplus entity to a deficit entity would be made online. 8The high cost of power would be reduced by this scheme Click on Details for moreDetails
For reference purposes the website carries here the following reports: 8Reliance Infrastructure to appoint an independent director. Click on Reports for more 8Siemens Ltd plan to appoint two new director. Click on Reports for more 8Inox Group pays Rs 411 crore to reduce debt of its operating entities. Click on Reports for more 8Gokulananda Sahu resigns from a switchgear firm. Click on Reports for more 8Reliance power plans to appoint a new director. Click on Reports for more 8Adani power seeks approval to appoint independent directors. Click on Reports for more 8Delhi gets 150 MW power from unallocated quota Click on Reports for more 8State electricity supplier to appoint a director. Click on Reports for more 8Indian EPC firm involved in the power sector gets CII-EXIM Bank award. Click on Reports for more 8IndiGrid Investment Managers Ltd gets chief executive officer. Click on Reports for more 8Investor conclave to boost participation in commercial mine auctions. Click on Reports for more 8Andhra Pradesh gets hydro power at Rs 3.73 per unit. Click on Reports for more 8Get the tariff review of Singrauli Super Thermal Power Station (2000 MW) Click on Reports for more 8JSW to expand its capacity: Find out capex plan of this generator Click on Reports for more 8India expects to raise Rs 16,000 crore through Sovereign Climate Bonds Click on Reports for moreDetails
8Adani discom has been allowed for procurement of power upto 250 MW + 250 MW under green shoe option on RTC basis 8This power shall be counted towards its Renewable Purchase Obligation (RPO) targets 8Find out the bidding guidelines for this procurement Click on Reports for moreDetails
8India will witness rising temperatures and heat stress due to climate change and will require massive cooling infrastructure to mitigate negative impacts on health and roductivity. 8Get an analysis on investment opportunities in India’s cooling sector Click on Reports for moreDetails
8Jindal Steel & Power Ltd (JSPL) does not have any coal on account of the prevalent coal shortage in the market 8So there is no generation from its captive power plants 8JSPL plans to enter into long-term Power Purchase Agreements (PPAs) to meet its requirement Click on Reports for moreDetails
8Rajasthan discoms do not have any guidelines in place for the preparation of Merit Order Dispatch (MoD) schedule 8The discoms have sought some changes in the guidelines 8But the request has been rejected 8Find out why? Click on Reports for moreDetails
8A remarkable improvement has been seen in recovery of outstanding dues with the implementation of LPS Rules, 2022. 8This rule has not only ensured that the outstanding dues are liquidated but is also enabling current dues to be paid on time. Click on Reports for moreDetails
8Mahatma Phule Renewable Energy and Infrastructure Technology Ltd (MAHAPREIT) has floated an RFQ for an alternate investment fund (AIF) 8Two amendment has however being made in the RFQ document 8Find out what amendment has been made Click on Reports for moreDetails
8PMC has been selected but the project is marred by protests 8But protests have delayed the project 8But even so, further RFQs are expected going ahead Click here for more detailsDetails
8Forest clearance stage 1 has been granted but stage 2 is pending at DFO 8The private land owner of the three villages didn't accept the proposal for the land acquisition and the negotiation with the land owner is in progress 8RFQ for the civil works (Lot -1) is likely to be floated in Q1 2023. Click here for more detailsDetails
8Construction of the approach road has been completed. 8Indian prime minister lays the foundation stone for this project. 8Tender has been floated for the civil and hydro-mechanical works. 8RFQ for the Electro-mechanical works package is likely to be floated in Q1 2023. Click here for more detailsDetails
For reference purposes the website carries here the following tenders: 8Tender for repair of underwater civil structures of power house Details 8Tender for maintenance of the coffer dams by providing sand filled poly bags Details 8Tender for the supply of journal bearings upper and lower for HP 803 bowl mills Details 8Tender for construction of 220kV GIS substation Details 8Tender for work of overhauling, servicing & repairing of coal & oil burners for boiler Details 8Tender for rate contract for rewinding, repairing and overhauling work of LT motors Details 8Tender for procurement of 1200 mm width conveyor belt Details 8Tender for empanelment of electrical contractors for identification of fault preparation of work site including excavation of earth for providing straight joint and cable box etc Details 8Tender for repairing and overhauling of PA system and point to point communication system and overhauling of HT and LT motors transformers Details 8Tender for round the clock and breakdown maintenance of generator seal oil system and hydrogen gas system Details 8Tender for outsourcing of O&M of 33/11 kV substation Details 8Tender for work of shifting of the 33 KV feeder Details 8Tender for augmentation of 220 KV substation. Details 8Tender for construction of foundation for installation of 132 KV bus differential scheme Details 8Tender for construction of foundation for erection of lighting mast at 400/220/132/33 KV substation Details 8Tender for manufacture, testing, supply and delivery of 33 KV 400 A isolator Details 8Tender for the supply of steel materials for crusher house Details 8Tender for EPC of 220 kV cables and accessories for interconnection Details 8Tender for the supply of 33KV single-core 630Sqmm copper XLPE power cable Details 8Tender for work of construction of 11kV incomer bay, 11kV feeder bay and station transformer bay Details 8Tender for repair of one wheel rollers of penstock intake Details 8Tender for procurement of LT distribution box Details 8Tender for annual civil maintenance and misc works Details 8Tender for ARC of water package of TPS(1X500MW) Details 8Tender for repair and modification of reclaim hopper Details 8Tender for work of PCC and metal laying / spreading in bay of 220/132/33KV GSS Details 8Tender for procurement of gland sheet HP and IP casing LP rotor fins and turbine Details 8Tender for providing & fixing of towers against replacement of rusted existing towers Details 8Tender for work of providing & fixing of spike of guard at various of 220/132/110KV EHV line towers Details 8Tender for providing and fixing of 33kV VCB at various substations Details 8Tender for up-gradation of existing HVDC control & protection of HVDC Bi-pole link Details 8Tender for work of complete repairs/overhauling/servicing/alignment of 245KV & 145KV various bus & line isolators at 220KV substation Details 8Tender for work of AMC for various work related to all ICTs reactors & transformer under 400kV Details You can also click on Tenders for more For reference purposes the website carries here the following newsclips: 8Powering health sector with greener energy in India Details 8Switch Mobility partners with JSW to introduce electric buses for employee transportation Details 8Hyundai Motor, SK on Sign EV Battery Supply Pact for N. America Details 8Oil minister bats for green hydrogen viability amid global energy crisis Details 8Investor conclave in Mumbai on Thursday to boost bidders' participation in commercial coal auction Details 8Special camps to link Aadhaar number with electricity connection begin in Tamil Details 8Faraday Future appoints Xuefeng Chen as global CEO Details 8Govt to set up demo wind power plants Details 8Rolls-Royce and easyJet test aircraft engine running on hydrogen Details 8Bangladesh promoting renewable energy in power generation mix: Power Secretary Details 8Yadadri Power Project Will Bring Laurels To Entire Country: KCR Details 8Policy implementation took center stage at Mint EnergyScape powered by Amplus Solar Details 8Focus on clean coal for now, not zero coal Details 8Indian power sector on verge of major energy transition, with increasing proportion of renewable energy: HPX Details 8How India eyes to achieve ambitious renewable energy targets Details 8India to develop small modular reactors with up to 300 MW capacity: Jitendra Singh Details 8Govt offers Coal India flexibility to levy mine closure costs Details 8Skoda Auto Volkswagen India's Aurangabad plant switches to 100% green energy Details 8IISER, IIT researchers develop new artificial photosynthetic system to capture solar energy Details 8Power Min launches schemes to procure 4,500 MW electricity supply for 5 yrs Details 8IIT Jodhpur researchers develop catalytic materials to produce high-purity hydrogen Details 8Ola Electric on track to open 200 experience centres by end of 2022 Details You can also click on Newsclips for moreDetails
For reference purposes the website carries here the following tenders: 8Tender for the supply of solenoid coil for fly ash material handling valve of ash plant Details 8Tender for repair and maintenance of bund and other miscellaneous work Details 8Tender for drawl of 33KV feeder from existing 132/33KV substation Details 8Tender for the supply of LT line spacer Details 8Tender for construction of foundation for equipment structures for 110kV UG cable feeder, bus coupler, transformer bays and allied works Details 8Tender for construction of foundation for equipment structures for 110kV UG cable feeder, bus coupler, transformer bays and allied works Details 8Tender for supply and ETC of nitrogen injection fire protection system (NIFPS) for power transformers/ ICT Details 8Tender for work of providing & fixing of tower earthing for various 220/132/100 kV lines Details 8Tender for rate contract for work of preliminary & detailed survey of various EHV lines Details 8Tender for preventive and breakdown maintenance of turbine & auxiliaries Details 8Tender for the supply of vacuum circuit breaker Details 8Tender for annual contract for the work of loading, transportation and unloading of various capacity substation equipments Details 8Tender for procurement of LT motors for different conveyors, sump pumps Details 8Tender for construction of 66 kV composite transmission line Details 8Tender for procurement of air pre heater tube Details 8Tender for rate contract for mechanical maintenance work of CHP system and crusher Details 8Tender for work of assistance carrying out miscellaneous routine work and preventive maintenance work Details 8Tender for supply, erection, testing and commissioning of 22 KV feeder Details 8Tender for lifting of 510000 MT coal Details 8Tender for supply of 220 KV underground XLPE cable line Details 8Tender for construction of 220 kV bay including supply of hardware, clamp and connector, extension of 220 kV bus Details 8Tender for procurement of injector set and LPR kit for 700 HP Details 8Design, engineering, manufacture, procurement, installation, testing, commissioning and O & M of 10MW ground mounted Solar PV Plant Details 8Tender for laying of 11 kv 3C 300 sq mm XLPE UG cable Details 8Tender for laying of 11 kV 3C XLPE cable 11kV HT feeder emanating from substation and installation of 315 KVA DTR Details 8Tender for laying of 11 kV 3C XLPE cable and laying of 1.1 kV PVC cables Details 8Tender for annual rate contract for coal cleaning and housekeeping at all routes of post crusher zone under conveyor Details 8Tender for overhauling of different HT motors Details 8Tender for the supply of LED luminaries Details 8Tender for overhauling of coal burner, wind box, SADC and coal pipe Details 8Tender for protective anti-wear coating on boiler tubes Details 8Design, manufacturing and supply of hot reheater tubes and bends Details 8Tender for procurement of consumable and running spares for IAC installed Details 8Tender for procurement of spares of various pumps of 210MW Details 8Tender for leftover structural steel and their associated works of main plant Details 8Tender for procurement of 5kV digital insulation tester for relay Details 8Design, supply, installation and commissioning of 600 KW On-Grid Ground Mounted SPV Power Plant Details 8Tender for replacement of existing battery sets & battery chargers by new battery sets & battery chargers in various substations Details You can also click on Tenders for more For reference purposes the website carries here the following newsclips: 8Renault Trucks help Coca-Cola beat Pepsi and Tesla Details 8INSIGHT-Who's next? Chinese EVs drive Stellantis' Jeep off the road Details 8Kyushu, Chugoku Electric say they will cooperate with Japan probe Details 8Hyundai Motor, LGES consider building two JV battery plants in the U.S. Details 8IIT Madras students' team Raftar launches first electric formula racing car Details 8Adani arm seeks licence to expand power distribution in parts of Mumbai Details 8Three Wheels United and Zyngo join hands to drive EV adoption for last-mile delivery Details 8India Faces A Unique Opportunity To Reduce Dependence On Imported Coal; Here's Why Details 8Soon, prepaid power meters at Punjab govt offices Details 8BPDB’s financial loss likely to cross Tk 48,000cr in 2022-23 fiscal Details 8Philippine leader hopes court will reconsider Manila power deal Details 895% households to get zero electricity bill in coming months, says Punjab CM Bhagwant Mann Details 8Port of Rotterdam to house Battolyser plant for the production of green hydrogen Details 8India taking steps for development to fulfil clean energy transition commitment, says Union MoS Jitendra Singh Details 8IIT Madras, Australian varsities to launch ‘Australia-India Centre for Energy’ to work on SDGs Details 8Rs 2 lakh cr to be invested in renewable energy sector: Karnataka CM Details 8Google, Microsoft announce new pacts to use renewable energy in data centre Details 8Truss & Johnson join voices against Sunak over onshore wind farms Details 8Electricity amendment bill unlikely to be tabled in Winter Session Details 8Festive season not over for EV makers as sales hit top gear Details 8Western, central UP to be developed as hub for EVs, ancillary industries Details 8Telangana’s Yadadri thermal plant to be commissioned next year Details 8India eyes smaller nuclear reactors for clean energy transition: Union Minister Jitendra Singh Details You can also click on Newsclips for moreDetails
8PG test is yet to be conducted for BTG 8Railway sliding works are in the initial phase of their construction 8RFQ for the limestone and gypsum handling plant package is likely to be floated in December 2022. Click here for more detailsDetails
8TOR of the project has been granted. 8Bid evaluation is in progress for the EIA consultant 8RFQ for the SIA consultant is likely to be floated in Q1 2023. Click here for more detailsDetails
8DPR and EIA report is yet to be approved by MoEF. 8The project got delayed as the villagers and environmentalists raised concerns over submerged and cultivated land. 8Forest clearance stage 2 is pending at the nodal office 8RFQ for the civil works package is likely to float in Q1 2023 Click here for more detailsDetails
European demand-supply factors during winter will critically determine Indian gas prices as of now 8Asian prices are lower than European prices and Europe will trigger price movements as of now 8Where exactly is Europe placed as of now, and what are the dynamics at work 8This is important to understand for Indian gas stakeholders Click on Reports for more
Details
With the quorum back, gas sector reforms are now on the fast track 8Find out what their impact will be on the Indian gas industry Click on Reports for moreDetails
Replacing 2.5 MMTPA of Gazprom supplies will be next to impossible, according to analysts 8LNG imports may eventually go lower than what it was five years ago Click on Reportsfor moreDetails
Get a perspective here on the Indian ammonia industry 8The urea segment is the largest consumer. 8What is the possibility of this segment going green. 8What kind of cost-economics are we talking about here? Click on Reports for moreDetails
8Climate change activists are now directly linking exact capacity expansion in LNG to the world's inability to meet climate change targets 8Find out how they are doing it Click on Reports for moreDetails
8The Uttarakhand Electricity Regulatory Commission has come up with a set of performance indices for itself 8On the face of them, they look exhaustive enough 8But there is more to it than meets the eye Click on Details for moreDetails
For reference purposes the website carries here the following reports: 8IEX to explore the business opportunities in the Carbon Market Click on Reports for more 8Waaree Renewable Technologies Ltd gets LoA to implement a solar power project Click on Reports for more 8Hindalco Industries Ltd v/s Maharashtra Electricity Distribution Co Ltd (MSEDCL): MSEDCL gets relief. Click on Reports for more 8Vineet Valentine Davis resigns from a wind power firm. Click on Reports for more 8A regulatory body is looking for consultants but low pay may come in the way of hiring them. Click on Reports for more 8Can the finance ministry act as a key catalyst to bring about climate change friendly policies? Click on Reports for more 8A case is being made out for rich country researchers to link up with those from developing countries on climate research. Click on Reports for more 8Accelerating hydrogen deployment in G-7: How to do it. Click on Reports for more 8Coal India Ltd breaches new production benchmark. Click on Reports for moreDetails
8Tata Power (Distribution) gets approval to procure 225 MW power from grid connected Wind-Solar Hybrid Power Projects for meeting its RPO targets 8Find out more Click on Reports for moreDetails
8Balaji Energy gets approval to terminate the PPA with a discom under a unique set of terms 8Find out what terms they were under which the company was able to extricate itself from the PPA. Click on Reports for moreDetails
8The trader has been granted category “III” licence for inter-State trading in electricity 8Find out the requirements to get a category 'III' trading licence Click on Reports for moreDetails
8Mahatma Phule Renewable Energy and Infrastructure Technology Ltd (MAHAPREIT) plans to engage an agency to ensure active project participation and engagement with Europe, being at the forefront of green technologies, innovative solutions and sustainable finance Click on Reports for moreDetails
8The cost of power procurement accounts for around 75-80% of the total cost of delivery of electricity to the consumers. 8The need of the hour is to assess resource adequacy of the licensees becomes paramount to address the dynamics of demand-supply mismatch and the need to ensure secure and stable power system operation. 8And a new more dynamic regulatory setting is needed Click on Reports for moreDetails
8State solar policies will require a big doze of reforms 8The earlier policies, for example the UP Solar Policy, 2017 targeted 4300 MW for solar rooftop by 2022, whereas, only 258.7 MW was achieved till July, 2022. 8This highlights the need to identify policy gaps and plug them. UP's draft new solar policy is nothing but old wine in a new bottle. Click on Reports for moreDetails
For reference purposes the website carries here the following tenders: 8Tender for construction of protection measures work for providing safe passage to exit water from auxiliary spilway Details 8Tender for purchase of inter cooler for HP air compressor Details 8Tender for biennial maintenance contract of ash dyke Details 8Tender for AMC of electricals at coal handling plant and furnace oil station Details 8Tender for protection work along the water pipe corridor Details 8Tender for replacement of existing 33 KV ACSR DOG conductor with 33 KV AAAC covered conductor Details 8Tender for supply and erection of towers and stringing of ACSR panther conductor Details 8Tender for procurement of spares of spares of oil centrifuge Details 8Tender for AMC for maintenance assistance carrying out routine work for preventive and conditional bays maintenance of 400/220/132 KV sub-station Details 8Tender for providing and laying of concertina coil for fencing of proposed stg III Details 8Tender for annual contract for preventive, periodic, running & breakdown maintenance of cranes Details 8Tender for contract for complete re-tubing of AC evaporator Details 8Tender for the supply of spares of bowl mill Details 8Tender for work of assistance carrying out miscellaneous routine work and preventive maintenance work of 400KV line Details 8Tender for procurement of single phase and three phase fully automatic smart energy meter Details 8Tender for the supply of various size of copper control cable Details 8Tender for procurement of spare parts for replacement of pulse jetting modules Details 8Tender for procurement of spare parts of 6.6 KV, 225 KW coal mill motor Details 8Tender for selection of consultant for transnet project Details 8Tender for the supply of spares for turbine shaft seal system Details 8Tender for procurement of digital weighing machines Details 8Tender for reconditioning of CW chlorination plants Details 8Tender for maintenance of ash slurry and water pipe lines Details 8Tender for capital overhauling of turbine Details 8Tender for supply and installation of automatic three phase potential transformerDetails 8Tender for supply, fabrication, erection of GI steel structures, earthing steels, erection of substation Details 8Tender for supply, installation, testing and commissioning of UPS batteries Details 8Tender for estimate for providing additional T/F at 66 kv sub station Details 8Tender for AMC for the work of maintenance, servicing & repairing of 220/110/48 V battery sets & battery charger Details 8Tender for work for annual plant maintenance of generating units and auxiliaries of hydro power station Details You can also click on Tenders for more For reference purposes the website carries here the following newsclips: 8Colombia has coal for 200 years' Details 8Deep Dive: Renewables key to 'plug the chasm' in energy transition Details 8US$10 mn Indian assistance for solar powered temples Details 8SSE to sell stake in transmission network business for $1.78 bln Details 8Savills : Investing in renewables infrastructure to decarbonise and be defensive Details 8A green-energy boost Details 8SKS Power lenders extend due diligence deadline Details 8Indian Energy Exchange board approves Rs 98 crore share buyback plan Details 8Column-India’s electricity shortage erased by renewables growth: Kemp Details 8Punjab planning to equip all govt buildings with solar panels Details You can also click on Newsclips for moreDetails
8DPR has been completed. 8Forest clearance stage 1 has been approved but stage 2 is pending at the regional office 8RFQ for the civil works package (lot-1&2) is likely to be floated in Q1 2023. Click here for more detailsDetails
8TOR of the project has been approved by the MoEF 8Construction of the approach road has been completed 8Forest clearance stage -1 is pending at thenodal office. 8RFQ for the SIA consultant is likely to be floated in Q1 2023 Click here for more detailsDetails
8TOR of the project has been approved by the MoEF 8Geotechnical investigation and topographical survey work have been completed 8Forest clearance stage -1 is pending at the DFO. 8RFQ for the PMC is likely to be floated in January 2023 Click here for more detailsDetails
For reference purposes the website carries here the following tenders: 8Tender for balance of plant services for distribution type transformers Details 8Tender for works for on line PD testing of 400KV & 245KV XLPE cable joints Details 8Tender for rate contract for the work of preventive & breakdown maintenance for boiler rotary partsDetails 8Tender for the supply of 165KW HT motor of conveyor belt Details 8Tender for work of replacement of old control relay panel Details 8Tender for ARC for servicing & overhauling of VCB with required spares Details 8Tender for the supply of LT single core XLPE PVC insulated cable Details 8Tender for the supply of various size of LT AB cable Details 8Tender for overhauling of turbine HP and LP, generator and auxiliary works Details 8Tender for shifting of 33 KV circuit and 11 KV feeder by laying of 33 KV XLPE cable Details 8Tender for construction of HVDS with 11kV lines Details 8Tender for operation and maintenance of PDFAC system Details 8Tender for the supply of 22 KV polymer pin insulator Details 8Tender for works contract for HT/LT line works Details 8Tender for procurement of gapless type polymer lightening arrestor Details 8Tender for balance work for construction of 33/11 KV s/s Details 8Tender for manufacture, testing, supply and delivery of tubular type lead acid DC batteries Details 8Tender for rate contract for testing, refilling & supply of required spares for existing fire extinguishers Details 8Tender for rock toe strengthening work in 1st raising of V-2 and V-3A ash dyke Details 8Tender for procurement of 220 KV and 132 KV low maintenance isolator Details 8Tender for fabrication, galvanizing, testing, supply and delivery for procurement of different 132 KV substation Details 8Tender for work of laying of 33 kV XLPE cable Details 8Tender for fabrication, installation and commissioning of the ventilation duct Details 8Tender for supply & erection of distribution T/F & 11KV A.B. switch Details 8Tender for procurement of 11KV and 33KV current transformer Details 8Tender for the supply of 33 KV AB switch Details 8Tender for the supply of 11 KV AB switch Details 8Tender for the supply of hydrochloric acid Details 8Tender for the supply of C.S. flakes Details 8Tender for the supply of hydrated lime Details 8Tender for breakdown maintenance of TG auxiliaries Details 8Tender for construction of foundation for equipment structures for 110kV UG cable Details 8Tender for assistance in isolation and chrging Details 8Tender for installation of solar street light Details 8Tender for miscellaneous civil works at DVC towers Details 8Tender for maintenance contract for internal and external CHP electrical Details 8Tender for the supply of caustic soda lye Details 8Tender for provision of earth bores and additional earth mat for 230 KV and 110 KV line Details 8Tender for comprehensive annual maintenance contract of DG sets Details 8Tender for procurement of portable online contamination & aqua sensors with HMI Details 8Tender for balance supply & erection work of 132KV bay at 220 KV SS, including supply & erection of PLCC panels Details You can also click on Tenders for more For reference purposes the website carries here the following newsclips: 8Castrol India to acquire 7.09 pc stake in TVS Automobile Solutions' digital arm Details 8Coal phaseout in SEE: countries have made pledges, but some are still silent Details 8ESG: HCG Commissions 2.25 MW Solar Power Plant to reduce carbon footprint Details 8Coal India to boost production; aims to achieve FY23 output target Details 8Coal India surpasses FY'23 green cover target Details 8Govt looking to sell 5%-10% in Coal India, Hindustan Zinc, RCF: Report Details 8SJVN commissions 75MW solar project in Uttar Pradesh Details 8Tesla may integrate Dolby Atmos in its electric cars Details 8Ultraviolette unveils India-made F77 electric motorcycle for Rs 3.8 lakh Details 8Vietnam's VinFast ships first electric vehicles to U.S. customers Details 8Nippon Steel eyes more stakes in coking coal mines to secure stable supply Details 8Rooftop Solar Capacity Installations Fall 29% to 320 MW in July-September: Mercom Report Details 8EV charging points at Chennai airport Details 8Sustainable energy transition study for the Indian power sector carried out by Wärtsilä and LUT University Details 8Coal minister asks ECL to ramp up production to 50 MT Details 8PTC India net profit more than trebles to Rs 157 cr in Jan-Mar quarter Details You can also click on Newsclips for moreDetails
For reference purposes the website carries here the following reports: 8Kudgi Transmission Ltd violated the Transmission Service Agreement (TSA): Find out why? Click on Reports for more 8UPSLDC to prepare intra-state DSM accounts and bills for implementation of DSM regulation 2022 Click on Reports for more 8A renewable CPSE to appoint a director (Finance) Click on Reports for more 8Get the allocated power through uniform allocation system in Western Region (WR) Click on Reports for more 8An energy audit to be conducted in DISCOMs: Find out key parameters Click on Reports for more 8Find out the fuel cost for Biomass based renewable energy projects in Haryana Click on Reports for more 8Gandhisagar Pumped Storage Project: Get an update on the award of a tender. Click on Reports for more 8Vedanta Limited declares Rs 6500 crore as dividend Click on Reports for more 8Find out capex plans for cogeneration power projects Click on Reports for more 8JSW Energy Ltd to appoint a director Click on Reports for more 8China’s action on climate is highly insufficient: Find out why Click on Reports for more 8Nabha Power Ltd: Rating withdrawn Click on Reports for more 8KSEBL move to do a campaign to educate consumers to use digital platform Click on Reports for more 8Uttar Pradesh Power Corporation Ltd vs Dhampur Suger Mills Ltd: SPPA granted Click on Reports for more 8Nuclear power is exempt from providing force majueure notices. Click on Reports for more 8New green bonds and sustainability-linked bonds are on the decline, and this has serious implications. Click on Reports for more 8Coal India Ltd castigated for causing environmental pollution by the NGT. Click on Reports for more 8Offshore wind energy tender: Last date for comments extended. Click on Reports for more 8HPL Electric and Power Ltd: Riding on smart meters. Click on Reports for more 8Coal fly ash: New ways of using it. Click on Reports for more 8Climate change may impact India and jeopardize the viability of livelihoods in the worst affected regions where temperatures are already close to harmful thresholds and are threatening to regularly reach 50°C+ by 2050. Click on Reports for more 8What is the meaning and scope of the term “premises” as used in the Electricity Act, 2003 and various Regulations and orders of the Commission? Click on Reports for the clarification. 8For banking and withdrawal of power there is no direct correlation between peak and offpeak hours, and this is causing much confusion. Click on Reports for more 8Cleanmax IPP 2 Pvt Ltd cotninues to prove that a captive client base allows for better business. Click on Reports for more 823% and 22% of cars sold in China and Europe, respectively, were electric in 1H 2022, in contrast to 2% in Japan and 7% in North America. This is creating its own dynamics. Click on Reports for moreDetails
8The regulator has rejected the request of DB Power Ltd to take action on TANGEDCO because for non-compliance of the regulator's order 8Find out what order was? Click on Reports for moreDetails
8Find out how upskilling enable young people to equitably access the employment opportunities created by the green transition? Click on Reports for moreDetails
8There is a requirement for 4500 MW power under medium term and 2900 MW under long term by some central/states utilities under SHAKTI B (v). 8But the earmarking of coal linkages may not be possible unless the power drawl schedule for individual states is informed by the Ministry of Power 8So MoP needs to work out the power drawl timelines for all the states whose requirement has been aggregated Click on Reports for moreDetails
8A company is entitled to recover compensation on account of incremental impact due to ‘Change in Law’ even after the occurrence of COD of the project including for O&M expenses Click on Reports for moreDetails
8Construction of transmission assets without firm commitment from RE generators may result in development of redundant transmission network 8So transmission system for RE evacuation should be planned only after finalising the prospective RE generation developer 8Find out what is the opinion of central transmission utility on this? Click on Details for moreDetails
8Annual fixed charge has been allowed for the 2022-24 tariff period for a 400 kV HVDC transmission assets in the Southern Regional Grid Click on Reports for moreDetails