8Project Name: Combined Cycle Power Plant (GT-4) Maintenance Project
8Project Cost: 20 crores
8Project Description: The owner has planned a 10-day scheduled maintenance of Unit-4 Gas Turbine (250 MW) in the 1500 MW ( 4*250 MW GT + 2*250 MW ST) combined gas based power station covering major combustion inspection and overhauling of equipment which includes overhauling of auxiliary parts of the gas turbine set and change out the fuel nozzles and to check out combustion liners and crossfire tubes. Equipment required will be fuel nozzles, combustion liners, crossfire tubes, buckets, transition pieces, casing, spark plug assembly, among others.
8Project Event: RFQ for equipment is expected in mid-January 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: Jan/2018
8Release Date: Feb/2018
8Start Date: 10/Mar/2018
8Completion Date: 19/Mar/2018
Click here for more information
8Project Name: Thermal Power Station - FGD Addition
8Project Cost: 900 crores
8Project Description: The developer is planning the installation of a Flue Gas Desulphurization (FGD) unit and retrofitting it's ESP at it's 1170 MW (3*250 + 2*210 MW) Thermal Power Station. The company is expected to float tenders for the same. Currently the 1170 MW power complex is under shut down due to low schedule and site survey activities are ongoing for a feasibility report for the FGD for submission to CEA for approval. Work on the project is meant to start in early 2021. RFQ for supply of FGD is expected to be out by Q1 2019.
8The major requirements will be FGD, stacker and reclaimer, earthwork, cranes, pipes, installation, gypsum disposal, wet limestone, among others.
8Project Event: RFQ for equipment is expected in mid-January 2018.
8Expenditure Approval: Q2:2018
8RFQ Date: Q1:2019
8Release Date: Q3:2019
8Start Date: Q1:2021
8Completion Date: Q2:2023
Click here for more information Details
For reference purposes the website carries here the following tenders: 
8Tender for manufacture, testing, supply and delivery of EHV Grade Transformer Oil (2900 KL), 11KV 200A TPGO Isolator (Rocking Type- 12714 sets) & Associated Materials Details
8Tender for Supply & Installation of Neutral Displacement relay (Numerical Relay- 105 Nos.) for 11KV APFC Capacitor Banks Details
8Tender for procurement of 27950 Nos. of 11KV 30KN Strain Disc Hardware Details
8Tender for survey,Design,supply,civil works,Installation,Testing & commissioning of 33/11 KV Mayapuri GIS Grid substation on Turnkey basis Details
8Tender for Construction of HT / LT lines,Sub-station and heightening of HT lines due to rerouting of power lines crossing over a River on Turnkey contract under National Waterway-5 Scheme Details
You can also click on Tenders for more. 
For reference purposes the website carries here the following Newsclips:
8Transport Ministry to seek Rs 5,000 crore for electric bus fleets, bus ports Details
8Sterlite Power bags $800 million transmission project in Brazil Details
8NTPC's capacities dwindle after CEA deletes Patratu's 325 MW Details
8Scientists develop floating solar cells that can produce fuel from water Details
8ACME Solar Holdings, HG Infra Engineering get Sebi nod for IPO Details
8Tata Power Renewable Energy commissions solar plant in Karnataka Details
8Tamil Nadu power utility to set up solar park in Ramanathpuram Details
8European Union governments agree renewable energy targets for 2030 Details
8BHP Billiton says likely to quit global coal lobby group WCA Details
8India expects to achieve 1.5 billion tonne of coal output by 2022 Details
8Growth in global coal demand subdued over next five years - IEA Details
You can also click on Newsclips for more Details
8Find out more on how Pakistan can become a big international player in the import of coal as it tries to power its economy Click on Reports for more
8Find out  how Keller completed the ground work for a super thermal power plant in record time. Keller was contracted by the main contractor BGR Energy Systems Ltd for the job. Click on Reports for more
8A business development opportunity has arisen for a 2.2 MW co-generation power plant. Click on Reports for more
8Is it possible to revive the sagging fortunes of the nuclear power industry? At one point in time costs were falling rapidly even as technology advanced but this trend was reversed subsequently. There is still a last chance for nuclear power to stage a dramatic recovery but for that to happen some of the hurdles have to be removed. Click on Reports for more
8Discoms are under pressure these days to perform. The government has prepared a concept note to bring discoms to the forefront in implementation of Roof Top Solar (RTS) systems by providing them financial support which will be linked to their performance in facilitating the deployment of RTS. Click on Reports for more
8Get the latest state-wise energy consumption data here. Click on Reports for more
8What is the overall utilization potential of a building-integrated photovoltaic and wind turbine (BIPvWt) system, which can be applied to a building skin in global urban areas? The findings are positive. Click on Reports for more
811 proposals have been put up for approval for using bio-gas to generate electricity in India. Click on Reports for more
8Find out more on new ways of collectiing of municipal waste and using of low cost incineration techniques to limit pollution and generate power in India. Click on Reports for more
8A majority of India’s energy demand remains unmet. India’s power system needs to almost quadruple in size by 2040 to catch up and keep pace with electricity demand that — boosted by rising incomes and new
connections to the grid — increases at almost 5 percent per annum. In this context, what should India's large mile inclusion strategies be? Click on Reports for more Details
Which are the main reasons why a viable solar manufacturing base has not emerged in India?
8For example, the country does not have a manufacturing base for poly-silicon and ingots/wafers, the upstream stages of solar PV manufacturing chain
8Then again, there are no economies of scale
8There are a whole lot of other factors too which come in the way
8Domestic content requirement caveats are not yielding the desired results.
Click on Reports to know more on what ails the sector and what can be done now.
   Details
What steps can the government take to make big scale solar PV manufacturing in India a viable proposition?
8Is it possible to strengthen the Make in India Program to ensure that Indian companies can take on the muscle power of foreign suppliers?
8Is it possible to insulate the domestic solar power industry from the vicissitudes of international market?
8If so, how?
8The government seems to have a gameplan, including rolling out Rs 11000 crores in direct support while extending indirect support by way of concessions to indigenous manufacturers.
8But will all this work, in the absence of genuine competition?
Click on Reports fro more Details
8Indian pollution rates have climbed even as those around the world are either stabilizing or falling.
Find out where India stands in the following indices
--
CO2 emissions: per country, per capita, per USD of GDP
-- Greenhouse gas emissions: total, CH4, N2O, F-gases
8Also there is more on recent trends in electricity production: fossil, renewable, nuclear; and where India stands.
Click on reports for more Details
How do you handle the new crisis emerging out of state utilities reneging to offtake power from high-tariff solar power plants.
8Until recently, a solar power developer faced the risk limited to payment behaviour, grid curtailment and merit order despatch of the concerned utilities. But now, with the discovery of low prices in each subsequent auction, and often under the pretext of public interest, discoms have started renegotiating the terms of the power purchase agreements (PPAs) including tariffs.
8These developments have created a certain degree of uncertainty, which should be avoided at this juncture as project installations have just started gathering pace and a tall target of achieving 175 GW by 2022 is to be met.
8What is the solution?
Click on Reports  to take part in a discussion Details
How to set up a green financing system in India?
8Systemic changes are needed
8Some of these changes are spelt out here.
Click on Reports for more Details
Solar projects can take up large pieces of land and it therefore makes sense to allocate land for them in uninhabited areas.
8The website carries here a social impact assessment of two solar projects in India where the human footprint in negligible.
8What can local communities gain out of such projects?
8Establishment of a Grievance Redressal Committee (GRC) in every project to ensure that the affected people’s grievances on both environmental and social concerns are adequately addressed, has now become essential.
8Another finding was to ensure employment of as many local people as possible during the construction phase of solar projects
Also find out more on an EOI for conducting Technical & performance evaluation and social-economic impact assessment of Solar Pumps and Solar Home Lighting Systems in India
Click on Reports for more Details
What is the actual outlook for coal demand in India?
8Even as consumption falls elsewhere.
8Coal demand in fact is expected to fall everywhere else except in South East Asia, and, of course, in India
8The big appetite for coal in these areas means that global coal demand increases marginally till 2022 instead of coming down.
8Coal prices are likely to stay volatile as China's demand unpredictability and supply disruptions work through the system over the next five years.
8As far as India is concerned, outside the power sector, growth in thermal coal demand is centred in the industrial sector thanks to robust economic growth, as well as in coking coal, thanks to rising steel consumption, housing, railways and steel-intensive industries such as shipbuilding, defense and vehicle manufacturing.
8The US is likely to emerge as the swing supplier to the rest of the world
Click on Reports for more Details
Find out Hub-based pricing is slowly winning the war over indexed based LNG pricing matrices
8Big traders such as Trifugara, Vitol and Guvnor are now managing exposures towards hubs
8LNG portfolio exposures are being hedged and optimised against hub price signals.
8Flexible LNG contracts are then optimised against regional spot price signals
8In this context, LNG players are rapidly expanding value and risk management capabilities to support portfolio management
8And commodity traders are acting as a catalyst.
8And this is creating a virtuous cycle supporting hub price penetration.
Click on Reports for more Details
India Power Corporation Ltd's proposal to supply electricity in a state in West Bengal has come has been severely opposed by the state utility
8While such opposition from a monopoly supplier is not unusual, some allegations seem to need further investigation.
8Charges by the incumbent utility of cherry picking in the network roll out plan by the new player will have to be taken up seriously.
Click on report for more Details
8China aims to build an advanced liquid biofuel system and put into operation a demonstrative facility that will be able to produce 50,000 tonnes of cellulosic ethanol a year, by 2020.
8Find out why the world’s ‘first’ commercial second-generation bioethanol facility  has shut down
8A business case has been made to build a commercial scale waste-to-renewable-jet fuel plant
8World’s ‘first’ municipal waste-to-ethanol facility starts production
8Find out more on how a US company has got into production of advanced biodiesel in India by processing one million pounds of low-cost waste feedstock unsuitable for use in traditional biodiesel production facilities and achieving high biodiesel yields by utilising its advanced enzymatic biodiesel process.
8Scientists are looking for new algae-based technologies to capture power plant emissions and convert them into a range of products including biofuels and other chemicals.
8Revolutionary progress is being made in the search for perfect algal strain.
8A company has claimed to be the first ever to have successfully converted actual landfill gas (biogas) into drop-in renewable diesel fuel with no fossil fuel additives.
8An Indian scientist is making waves for finding a ‘waterless’ purification process for biodiesel
8Find out more on the  Biofore Concept Car which demonstrates a totally new type of thinking, driving sustainable change and replacing oil-based materials with advanced, renewable biomaterials.
Click on Reports for more Details
The government’s thrust on renewables was the key negative for BHEL in past 1 year.
8However such transition will be slower and tendering for conventional energy would range in 10-12GW (including replacement) in foreseeable future, where BHEL commands significant market share (~65%).
8So things are looking up now for the power equipment contactor
8The executable order book has jumped to 78% from a much lower level earlier.
8Slow moving orders are now fructifying
8A slew of orders is now likely by March.
8The company has to make higher provisioning for default by private sector IPPs but even so, the outlook is getting brighter
Click on Reports for more Details
What are the major issues currently plaguing the power minister
8He seems to have a clear mind on what needs to be done
8On his mind are far reaching distribution reforms, among other issues.
8Floor and ceiling bands for electricity prices is another move that he is contemplating
Click on Reports for more Details
8Project Name: Thermal Power Station - FGD Addition
8Project Cost: 350 crores
8Project Description: The owner is planning the installation of a Flue Gas Desulphurization (FGD) unit at its 630 MW (3*210 MW) unit. The company is expected to float tenders for the same. At present, site survey activities are ongoing for feasibility report to be submitted to the CEA for approval. Work on the project is meant to start in early 2019. RFQ for supply of FGD is expected to be out by Q3 2018.
8The major requirements will be FGD, stacker and reclaimer, earthwork, cranes, pipes, installation, gypsum disposal, wet limestone, among others.
8Project Event: RFQ for supply of FGD is expected to be out by Q3 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Q3:2018
8Release Date: Q1:2019
8Start Date: 2019
8Completion Date: 2021
Click here for more information
8Project Name: Greenfield Hydro Project
8Project Cost: 1100 crores
8Project Description: The owner along with a PFR consultant WAPCOS is carrying out site survey activities for scoping an environment clearance for a 168 MW (4*42 MW) greenfield hydroelectric project. TOR has been granted on 02 December 2015. Currently site survey and investigation activities for baseline data for three seasons are underway which would take a year to complete. The owner after preparation of the DPR will decide either to come up with package wise or an EPC contract. The owner will come out with an EOI for a EIA consultant soon.
8Project Event: RFQ for an EIA consultant is expected by Q2 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Q2:2018
8Release Date: Q4:2018
8Start Date: Q2:2020
8Completion Date: Q3:2024
Click here for more information Details
For reference purposes the website carries here the following tenders: 
8Tender for Supply & Erection of Earthing at 33 location of 11KV substation And 9 locations of 33,66KV Grid Substations Details
8Tender for survey,Design,supply,civil works,Installation,Testing & commissioning of 33/11 KV GIS Grid substation on Turnkey basis Details
8Tender for construction of 220KV Transmission lines for 220KV Substation Details
8Tender for Construction of 110KV D/C line from 220KV Bidri S/s. to LILO point(Total Length- 6Km) Details
8Tender for the supply of 85 Km of LT XLPE Cable Details
You can also click on Tenders for more. 
For reference purposes the website carries here the following Newsclips:
8Mangalore University to go green Details
8Coal prices may rise: Analysts Details
8Adani drops contractor for contentious Australia mega mine Details
8Power ministry may ask discoms not to wait for regulator’s nod Details
8Nuclear, renewables to help French CO2 reduction goals, Macron says Details
8Cial to provide consultancy service for setting up solar power plants in Ghana Details
828 solar power plants on Central Railway generate 924 KWp of electricity Details
8Renewable Energy mini grids can offer power solution, says report Details
You can also click on Newsclips for more Details
8Tata Motors has emerged as the L-1 bidder for the ESSL tender for supply of 10,000 electric cards. Who supplies the electric drive systems for these vehicles, of which some have already been delivered? Click on Reports for more 
8A capacity building programme for officers of electricity regulatory commissions is being undertaken in India and Singapore. Click on Reports for more
8Best practices in the distribution industry. Find out more how the government is trying to roll them out to all parts of the country Click on Reports for more
8The US Department of Commerce wants to collaborate with Indian industry on the distribution sector. A team is coming to India next year and it is interested in the following areas:
-- Transmission and Distribution (T&D) Grid Modernization
-- Distributed Energy Resources (DER)
-- Renewable Energy Integration
-- Demand Response / Load Shifting / Frequency Regulation
-- Advanced Metering Infrastructure (AMI)
-- Electric Vehicle Charging Infrastructure
-- Energy Storage
Click on Reports for more
8The CERC is looking for a solar industry consultant for wide ranging consultations and suggestions on rolling out the next phase of reforms. Click on Reports for more

8There is a conference coming up on Environmental issues, challenges and innovations for thermal power plants in Delhi Click on Reports for more
8Find out more on Tata Projects and how much thrust the new management is giving to this company and the success it has had in diversifying out of its traditional businesses. This includes an interview with the company's managing director. Click on Reports for more
8Small solar units are facing trouble as is evident from the performance of Gemco Energy Limited (GEL). Click on Reports for more
8L&T has handed over yet another fully completed gas based power plant in Bangladesh. It is now in the process of executing two more power plants in the country. Click on Reports for more
8How does the crisis management document in case of a cyber attack look like? Click on Reports for more
8Get the Draft Conduct of Business Rules (CBR} of the Designated Authority (DA) for facilitating Cross Border Trade of Electricity (CBTE), Click on Reports for more
8Find out the power sector exposure of the Oriental Bank of Commerce Click on Reports for more
8BSES Rajdhani Power Limited and BSES Yamuna Power Limited have challenged a CEA report on its dispute with NTPC Ltd. Click on Reports for more
8Wind-Diesel Hybrid power generation is a viable alternative for generating continuous power to isolated power system areas which have inconsistent but potential wind power. An option to deploy a Flywheel Energy storage system (FESS) can be a viable option under this matrix Click on Reports for more
8In a breakthrough, a Japanese company has developed a hydrogen-based autonomous energy supply system. The set-up is housed in a single container and combines a renewable energy unit, storage batteries, hydrogen-producing water electrolysis equipment, hydrogen and water storage tanks, and fuel cells. Power generated with renewable energy is stored in the battery, ready to electrolyze water and produce hydrogen when needed, day or night. The hydrogen is in turn stored in a highly efficient tank, for delivery to fuel cells that produce electricity and hot water. Click on Reports for more
8Solar tenders and auctions saw a steep decline in India last month. The solar capacity tendered in November fell 25 per cent from the previous month to 300 MW, while the amount of solar auctioned dropped 98 per cent to just 5 MW. The tariff rate is hovering at Rs 4/kWh without VGF. Click on Reports for more
8The last date for submission of suggestions on the “Draft Central Electricity Regulatory Commission (Grant of Connectivity and General Network Access to the inter-State transmission system and other related matters) Regulations, 2017” has been extended. Click on Reports for more

Details
What really is going in with the petroleum coke market in India?
8Given India's massive import volumes, coke prices are reacting negatively to news of banning of use of coke in Gujarat and the NCR. What are the current price lines and what are the projections?
8Find out more on how new norms are squeezing out traders from the Indian market
8Find out more on how weak domestic demand is forcing Indian producers to cut prices and look abroad
8Instead of an outright ban on coke imports, Indian policy makers are looking at other ways of curbing imports. Find out more
8Will the government allow petroleum coke use as a feedstock rather than as a fuel?
8Why is there a better prospect for import of coal as a result?
Click on Reports for the underlying analyses and demand dynamics Details
Where is the next wave of LNG supply coming in from?
8It will come from equity capable of taking market risk
8Big balance sheets are going to be important, as low cost of capital will be necessary
8They will require a few other characteristics to survive
Click on Reports for more Details
8Project Name: Greenfield Thermal Power Station
8Project Cost: 11000 crores
8Project Description: The owner is planning to set up a 1320 MW (2*660 MW) greenfield super-critical thermal power plant. EC has been accorded on Feb 2017. Land for the project work has been acquired. The owner has already floated a tender for earthwork involving cutting, filling and leveling of land. The project is getting delayed due to a revised PIB memo for main plant works which is under examination now by the CEA. Work at the site has been slated by Q3 2018. The owner will come out with a main plant award (Boiler and Turbine Generator) soon.
8Project Event: RFQs for main plant works (Boiler and Turbine Generator) are expected by Q2 2018.
8Expenditure Approval: Jul/2013
8RFQ Date: Q2:2018
8Release Date: Q4:2018
8Start Date: Q3:2018
8Completion Date: Q4:2022
Click here for more information
8Project Name: Thermal Power Station - FGD Addition
8Project Cost: 270 crores
8Project Description: The owner is planning the installation of a Wet Flue Gas Desulphurization (WFGD) unit at it's 500 MW (2*250 MW) unit Thermal Power Station. The company is expected to float tenders for the same. At present, site survey activities are ongoing for feasibility report for submission to CEA for approval. Work on the project is meant to start in 2020. RFQ for supply of WFGD is expected to be out by Q4 2018.
8The major requirements will be FGD, stacker and reclaimer, earthwork, cranes, pipes, installation, gypsum disposal, wet limestone, among others.
8Project Event: RFQ for supply of WFGD is expected to be out by the Q4 2018.
8Expenditure Approval: Q2:2018
8RFQ Date: Q4:2018
8Release Date: Q2:2019
8Start Date: 2020
8Completion Date: Q2:2021
Click here for more information
Details
For reference purposes the website carries here the following tenders: 
8Tender for Manufacture & supply of Hi-chrome Grinding Element Set for 8.5 E-9 type coal mills of a Thermal Power Station Details
8Tender for procurement of AHP heating elements (Cold end,Hot end & Intermediated zones) for air pre-Heaters of 2*250 MW Thermal power station Details
8Tender for work of construction of 220 KV Substation on Turnkey basis Details
8Tender for Supply of 220KV Zinc Oxide LA, Pedestal Mounting, Nominal Discharge Current 10KA (Qty.-59 Nos) Details
8Tender for overhauling of Pressure Parts of Boiler of 210 Mw, Unit-6 of a Thermal power Station Details
8Tender for Work of Overhauling with providing & fixing of required spares of 11KV, 22KV & 33KV Alstom/Areva Make VCB at various Substation Details
You can also click on Tenders for more. 
For reference purposes the website carries here the following Newsclips:
8U.S. solar power installations to fall more than expected in 2017 Details
8Govt to provide 2.18 lakh power connections to farmers Details
8Schneider Electric introduces energy efficient EcoStruxure Grid in Hyderabad Details
8South Delhi civic body bags National Energy Conservation Award Details
8Efficient energy availability backbone of economy: President Kovind Details
8Hybrid solar systems to be installed in govt schools of Haryana Details
8India to auction 5,000 Mw offshore wind power projects in 2018 Details
8Captive power producers say facing 'severe coal shortage' Details
You can also click on Newsclips for more Details
8Project Name: Hydroelectric Plant Maintenance Project (Unit- 4)
8Project Cost: 20 crores
8Project Description: The owner has planned a 40-day scheduled maintenance of Unit-4 (115 MW) in the 690 MW (6*115 MW) Hydro Power Station covering annual inspection and overhaul of equipment which includes overhauling of auxiliary parts of the turbo-generator set, bearing sets, seals, governor and oil leakage unit, rotor assembly.
8Equipment required will be turbine guide bearings,vacuum breaking valve, pipes, air seals, water seals, cleaning of field winding, fabrication of platform in the draft tube for inspection of runner, among others.
8Project Event: RFQs for equipment required are expected by fourth week of December 2017.
8Expenditure Approval: Q2:2017
8RFQ Date: 28/Dec/2017
8Release Date: 10/Jan/2017
8Start Date: 29/Jan/2018
8Completion Date: 9/Mar/2018
Click here for more information
8Project Name: Pumped Storage Greenfield Plant
8Project Cost: 1000 crores
8Project Description: A Joint Venture is planning to construct a greenfield 400 MW pumped storage scheme which envisages re-circulating the water between lower and upper reservoirs. TOR is yet to be granted. Currently, the owner is carrying out the project scoping activities with the Government of Maharashtra. The owner will come out with a bid for S&I activities and DPR preparation.
8Project Event: RFQ for S&I and DPR preparation is expected by Q2 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Q2:2018
8Release Date: Q3:2018
8Start Date: Q2:2021
8Completion Date: Q4:2025
Click here for more information Details
For reference purposes the website carries here the following tenders: 
8Tender for Construction of HT, LT line and Sub Station for power supply Details
8Tender for Award of work for Onsite Servicing and Overhauling of oil Filled Power Transformers of Various Ratings 66/33 kV, 66/11 KV,33/11 KV Upto 50 MVA Details
8Tender for Supply, Installation and Commissioning of Solar off-Grid Power Plants 5 Kilowatt & 10 Kilowatt capacities at 110 Nos. of PHCs and 110 Nos. of CHCs Details
8Tender for Rate Contract for Execution of Works involving Construction/Laying of 11KV line, Line DP, Tapping DP, DTR s/s, LT line and Service Lines with LED bulb & Charging Point for Providing Permanent Connection to House Holds on Semi-Turnkey Basis Details
8Tender for the Supply of 25866 mtrs. Of Cast Basalt Lined MS Pipes and all pipe specials such as Sleeve Couplings, Uclamps, fasteners, consumables etc for a Thermal Power Station Details
8Award of work for carrying out DT/HVDS Meter Reading & DT/HVDS Meter Maintenace/AMR Maintenace & DT/HVDS Meter Installation Details
You can also click on Tenders for more. 
For reference purposes the website carries here the following Newsclips:
8No going back on Rs 5 per unit power to industries- Punjab CM Details
8Mizoram villagers object to commissioning of hydro power project by PM Details
8EESL initiatives save 3,700 kWh energy Details
8Steep drop in solar power auctions, tenders in November: Mercom Details
8GST led to 12% rise in cost of solar projects, says AISIA Details
8ICICI Lombard offers solar panel warranty insurance policy Details
8Green panel nod to SECL's Rs 11,816 cr expansion project Details
You can also click on Newsclips for more Details
The government is looking at the possibility of research driven quantification of the "co-benefits" of green energy
8Job creation is one of them
8As also a host of other parameters
Click on Reports to know more Details
8Kalpataru Power Transmission Ltd has picked up two orders totaling Rs 278 croree in India and three orders worth Rs 600 crore in Afghanistan, Ivory Coast and Bangladesh.Click on Reports for more
8Labyrinth gravity ventilators: Find out more on who provides the best Click on Reports for more
8A captive producer of electricity for the industrial sector has reaffirmed that its business model is still working fine despite problems with its creditors. Find out more about what is behind this confidence Click on Reports for more
8Find out how one of India's largest manufacturers of electrical components and systems and power distribution products is planning to create 100 business leaders within the next two years. It has hired dozens of GMs from companies such as Schneider, Philips, Airtel, Voltas, Dover, HCL, Samsung, LG, Cargill, Dalmia Bharat and Reliance in order to be able to do so Click on Reports for more
8The power sector attracted much lower FDI than many other sectors. Click on Reports for more 
8What kind of a deal has Ostro Kutch Power Private Ltd struck with its EPC contractor for a 250 MW wind power project in Rajasthan. Click on Reports for more
8Seminar on emerging energy scenarios in India: Paper submissions sought Click on Reports for more
8At present no energy storage approach has been established as the most promising, for reasons such as storage duration or response time as well as because of their environmental impact. Get a comparative analysis Click on Reports for more
8NLC is planning to raise its mining capacity and attendant power capacity creation as well. Click on Reports for more
8Coal producers have continued to project high profit margins for 2018. Click on Reports for more
8China's  Belt and Road Initiative has been criticised for not promoting green technology. Chinese banks have been accused of not doing enough due diligence on their investments. Is that changing now? Case histories illustrate the point better. Click on Reports  for more
8Get the new tariff based competitive bid guidelines for grid connected wind power projects Click on Reports for more
8R
eNew Power may buy Ostro Energy in Rs10,000 crore deal. How has the deal been structured. Click on Reports for more
8A new coal allocation methodology to states has been prepared by the CEA and approved by the power ministry Click on Reports for more
8Is there a scope in India for a specific green investment bank. Are there lessons to be learnt from similar banks elsewhere? Click on Reports for more
8Get the latest transmission line and sub-station commissioning data here Click on Reports for more
8What has been the latest gas offtake for power projects in India? Click on Reports for more
8Bharat Heavy Electricals Limited (BHEL) has successful commissioned its 54 MW coal-fired captive power project in Indonesia.Click on Reports for more Details
Big financial investors, particularly the largest insurance companies in the world, are under pressure from the climate change lobby, are now forced to work not just on relative parameters but on absolute volumes when it comes to curtailing their investments in dirtier fuels.
8Funds are being denied not just on current coal holdings but on future plans of coal companies as well
8It is not just coal, other fossil fuels are also targeted
8Will this trend catch on in India?
8It is not that all coal companies are targeted.
8Now norms and threshold limits have been set for such investments.
Click on Reports for more Details
Hydro power development is never an easy proposition in India
8A host of issues hinder project implementation
8In many cases it is not just environmental clearances but also technical problems with dam and tunnel building that come in the way
8Get a full understanding of the issues involved in dams across India.
Click on Reports for more Details
Nepal seems to be facing a crisis of confidence with its hydro electric power plans. The Chinese are not willing to help out and there is uncertainty over Indian demand.
8In some quarters there is an extreme amount of urgency to bring the proposed and long delayed large-scale projects on track (and eventually on line) before the Indian government follows through with its announcements to substantially increase its solar and nuclear power generation.
8There is an increasing feeling Katmandu that this would effectively erase Nepal’s ability to profit from the harvest of hydropower, and would dismiss the electricity-export-driven development model Nepalese have been working on for decades.
8There are other fears too
Click on Reports for more Details
8Project Name: Gas Power Station Maintenance Project (GT-4)
8Project Cost: 14 crores
8Project Description: The owner has planned a 35-day scheduled maintenance of GT-4 (130.19 MW) in the 817 MW (4x130.19 MW GT + 2x154.51 MW ST) Gas Based Power Station covering boiler license renewal of 8000 equivalent operating hours, flame tube inspection, inspection of air-fuel ratio and compressor washing.
8Equipment required will be valves, filters, casings, furnace tubes, seals, among others.
8Project Event: RFQ for equipment is expected by third week of December 2017.
8Expenditure Approval: Q2:2017
8RFQ Date: 21/Dec/2017
8Release Date: 5/Jan/2018
8Start Date: 15/Jan/2018
8Completion Date: 18/Feb/2017
Click here for more information
8Project Name: Procurement of a Generator rotor in Thermal Power Station - O&M supply
8Project Cost: 25 crores
8Project Description: The developer is planning to replace the existing generator rotor in the generator at a 600 MW Thermal Power Station in Salem district of Chennai, Tamil Nadu. The generator was supplied by BGR Energy Systems Ltd. The owner will procure a new generator rotor in case of failure of existing generator rotor, as repair of the rotor will take a long time. Administrative approval is awaited, subsequently after which the procurement team of the owner will come out with a bid for the new rotor.
8Project Event: RFQ for purchase of a new generator rotor is expected by Feb 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: Feb/2018
8Release Date: Feb/2018
8Start Date: Mar/2018
8Completion Date: May/2018
Click here for more information
Details
For reference purposes the website carries here the following tenders: 
8Tender for Supply of 132KV Zinc Oxide LA, Pedestal Mounting, Nominal Discharge Current 10KA Details
8Tender for work of Slope Stabilization Studies of a Hydro Electric Project Details
8Tender for Supply of battery chargers & DCDB for various Sub-Stations Details
8Tender for procurement GI Stay set complete, GI HT V-X arm 5' feet, GI HT V-X arm 3½' feet , GI HT TI fitting Details
8Tender for work of Operation & Maintenance contract for Water Chemical Treatment Plant in TPS-II Expansion for two years Details
8Tender for supply and installation of 33 KV, 10/20 MVAR Capacitor bank including construction of 33KV bay for capacitor bank at different substaion and allied work on turnkey basis Details
You can also click on Tenders for more. 
For reference purposes the website carries here the following Newsclips:
8Uttarakhand CM Rawat discusses hydro projects with Nitin Gadkari Details
8Electric vehicle battery prices to steady by 2020: Hyundai Motor Co Details
8OPINION: E-Vehicle challenge and opportunity Details
8Thermal power plants’ capacity utilisation on the rise after 7 years of downtrend Details
8Government issues guidelines for tariff-based wind power auction Details
8Private power firms expect supply delay as CIL consults agency on bidding Details
8BHEL commissions coal-fired power plant in Indonesia Details
8Adani says will 'adjust to constraints' after Australia coal loan veto Details
You can also click on Newsclips for more Details
8Indian grid continues to work in low frequencies due to overdrawal by states. Here is some tracking data about Click on Reports for more
8New web based scheduling and reporting software have now been put into effect. Check it out.Click on Reports for more
8Installation of Low Voltage Ride Through systems will be compulsory for wind, and now solar generators. From now on, this will be incorporated into fresh solar and wind tenders as well.Click on Reports for more
8Get a detailed note on the total and disaggregated transfer capacity of the Indian grid by March, 2018. Click on Reports for more
8Find out more on why some of India's largest distribution companies fall into the "distressed" category. Click on Reports for more
8Continuing the trend set in October, the day-ahead power market at IEX witnessed the convergence of market prices all over India for all hours in a day for the entire month of November realizing the One Grid, One Price aspiration. Click on Reports for more
8Two new transmission networks are being launched by PGCIL. Click on Reports for more
8China is gradually subduing coal price volatility via regulating market mechanism. Monthly coal imports by China are slowing down: how will that impact the Indian market? Click on Reports for more Details
Find out more on how integrating the South Asian market can unleash huge benefits for all member countries
8What are the incremental steps which can be taken to unlock the potential
8What can be their implications for the power sector?
Click on Reports for more Details
As the world transits to a new paradigm, it has become essential for a power company to go for Decarbonisation, Digitalisation and Decentralisation.
8A company should be above the circumstances it can find itself in.
8Benchmark yourself with the best in the business.
8It is possible that a company may not be able to tick all the boxes which their peers could be doing but moving ahead has become important
Click on Reports for more Details
Pressure is mounting from all directions to reduce bank and financial institution funding not just for coal but for all fossil fuels.
8There is also increasing pressure on the government to reduce subsidies on fossil fuels production and consumption.
8Where are the pressures coming from?
Click on Reports to find out more Details
Does coal shortage lead to the gaming of the merit order dispatch system
8Utilities are saying, "yes".
8This is because a generator has multiple LTA contracts
8And there is no guarantee that he is not taking advantage of shortage situation to despatch coal against the contracts which give him higher rates.
8A proposal is afoot for a pro rata reduction now in case of a step down in generation due to coal shortage
8There is a pro rate provision only for outages now.
Click on Reports for more Details
Detailed procedures for compensation of low operating thermal power plants are in the process of being worked out.
8With increasing penetration of variable and intermittent RE generation, there is a need for more flexibility in the operation of conventional generation plants.
8The flexibility needs to be quantified, measured and duly compensated for.
8ThHe CERC notified regulatory provisions in April 2016 for the technical minimum for operation of Inter-State Generating Stations at 55% of Maximum Continuous Rating (MCR) installed capacity.
8The compensation mechanism is linked to station heat rate and the detailed procedure is under discussion stage still
Click on Reports for more Details
Pressure is mounting on the coal industry and finding a bank to loan to a coal mine is getting to be all that much more difficult.
8A list of "Dirty 30" top global financial institutions have been identified along with their shareholding or loans in coal companies
8LIC figures high up
8But the list is lead by some surprising names
8Then again a ranking system has been introduced from A to F, for banks and financial institutions invested in coal.
8All of this makes for interesting reading 
Click on Reports for more Details
For reference purposes the website carries here the following tenders: 
8Tender for work of Geophysical Investigation for a Hydro Electric Project Details
8Tender for work of Construction of LILO of 132kV S/C Beholi-Chhajpur Line at proposed 132kV S/Stn.Pasina Khurd with 0.4sq ACSR Zebra Conductor Details
8Tender for Construction of 220kV & 66 kV Transmission Lines on turnkey basis Details
8Tender for supply of Power & Control Cables of 1.1 kV Class for Various Substation under PSDF Details
8Biennial rate contract for reclamation of used/burnt Transformer oil including collection from different units and delivery of transformer oil after satisfactory reclamation to different units Details
8Diversion/reloaction of 132 KV D/C Line to eastablish D/C connectivity of 132 kV SS with BTPs and 220 Kv SS including construction of 2 Nos. 132 KV AIS Feeder bay at 132 KV SS & other associated works Details
You can also click on Tenders for more. 
For reference purposes the website carries here the following Newsclips:
8HC notice to Centre on plea alleging over-invoicing by power firms Details
8Toshiba's turbine shipments reach 200,000 Megawatt milestone Details
8Global wind power output could shift south under climate change -study Details
8Chinese solar panels cloud prospects of $2 billion investment in domestic units Details
8Global banks undermining Paris climate agreement goals, say reports Details
8Wind energy auction guidelines set minimum plant size at 25 Mw Details
8Netherlands firm to invest 200 million Euros to set up solar manufacturing plant in Assam Details
8Talaipalli coal block likely to start commercial production in 2019 Details
You can also click on Newsclips for more Details
8Greentech Power Private Ltd's (GPPL) 6 MW solar power plant is pegged on to NTPC Vidyut Vyapar Nigam Ltd, at a price of Rs 11.70/Kwh. Profit margins are good. As of now, because of a strong counter party, its rating is high but with others of its ilk where the cost of power is high, there are always attendant risks Click on Reports for more
8Compressed air energy storage (CAES) is a proven technology in grid-scale applications. It has been found that a micro-scale AA-CAES, when optimized with an appropriate configuration, could deliver energy input to output efficiency of up to 70%. What is the current state of micro scale CAES technology? Click on Reports for more
8A business opportunity is available for a 20 MW captive waste heat recovery power plant. Click on Reports for more.
8The government plans to modify the Standard Bidding Documents for UMPPs. Click on Reports for more
8If you are a government company with an allocated coal mine you can pass on the specified end use plants to others now in a relatively hassle free manner. Click on Reports for more
8Here are more details on a market leader in Valve Actuation. Find out more on how it has reached that position. Click on Reports for more
8BIS standards are to be reviewed for the power distribution sector. Click on Reports for more
8Pemmasani Solar Power Private Lts's 10 MW plant has a PPA at 6.84 per unit (kWh) for the next 25 years with the TSSPDCL The risk profile is slated to be "comfortable" for now. Click on Reports for more
8The website carries here the latest update on smart grid pilot projects in India. Click on Reports for more
8Genus Power Infrastructure is one of the largest players in the domestic electric metering market. Strong demand drivers are pushing up the market. Then again, the company is in T&D EPC segment, where too the traction is good. Click on Reports for more
8Coal production is sustained by demand from the power sector on the back of renewed electricity offtake. The upswing is expected to continue for the coming quarters though production targets are unlikely to be met. Click on Reports for more
8Lab testing, standardization and certification of solar equipment is coming in. It can be doubled edged sword. Click on Reports for more
8Kalpataru Power Transmission Ltd: Find out more about the ingredients which have made the company so strong.Click on Reports for more
8FluentGrid's smart grid offering: Click on Reports for more Details
Lifecycle greenhouse gas emissions are now increasingly used as a tool to fight the case against the use of gas.
8While gas is relatively cleaner fuel than coal, it is not clean enough to fight emissions, is the new argument.
8Fossil fuel technologies are way more carbon emitting than fossil fuel based fuels
8All renewable technology fuels are 1,000 g CO2eq/kWh lower than their fossil-fuelled counterparts (without CCS).
8Increasingly, this is going to be an important component of future conversations.
Click on Reports to know more Details
Worldwide, in 2020, large parts of the world will be able to produce renewable power at the cost of 2 to 3 US cents per kWh through solar cells placed in the deserts
8By about 2040,this cost to drop to less than 1 US cent per kWh.
8By this same year, it should also be possible to have floating wind turbines in the ocean produce electricity at a cost of 1 US cent per kwh
8The electricity to people will be brought in in the form of hydrogen.
8By means of electrolysis, the electricity and water will converted into hydrogen and oxygen.
8The world can then transport this hydrogen – compressed or liquefied– anywhere in the world, and store and use it whenever it wants.
8From hydrogen (electricity), carbon (biomass), oxygen (electricity) and nitrogen (air), the world can make all of  its chemical products in bulk.
8Moreover, with hydrogen and electricity we can also make all of our metals.
Read up more about how all of this is slowly but inexorably moving from fantasy to reality and how experimental projects have already taken off. Click on Reports for more Details
 In our ongoing series on dramatic new way of making fertilizers, the website carries here a blueprint of how ammonia and urea is going to produced from extremely cheap renewable energy in hot spots such as India, Africa, Australia and the Middle East, where solar radiation levels are expected to be high and price of electricity really cheap.
8The cost of electricity can sink very low levels and this will help in the transition. Already solar power bids in Mexico fetched a price of a little over Rs 1/kwh.
8The cost of electrolysis of water to produce hydrogen and ammonia has been falling rapidly too
8And they will soon reach viable levels
8Large volumes of nitrogen is likely to be produced not just for use as fertilizers but as a means of storing energy and transporting it from cheaper locations to other parts of the world
8How quickly will this technology take roots? Click on Reports for more Details
Find out how all of world's metals and its petrochemicals and chemicals will be delivered by cheap renewable energy using new technology
8All of the fresh water supply will also come from renewable energy as also the water to supply agriculture and industrial units.
8Hydrogen driven or battery operated cars will work as producers and generators of power
8Self driven cars and ships will revolutionize transportation entirely. In the future the world will be driving, sailing and flying autonomously and electrically, using electric motors, batteries and hydrogen fuel cells.
8Power production will move away from less irradiation to higher irradiation areas around the world.
8The first steps towards this dramatic by inexorable change have already been taken.
Click on Reports for more Details
Kiran Energy Solar Power Private Ltd was set up in the days when solar power projects were the flavor of the season and before prices went into precipitous decline.
8The company was promoted by two high powered professionals: Alan Rosling, former Executive Director of Tata Sons Ltd, and Mr. Ardeshir Contractor, former Managing
 Director of KPMG India. They were backed by support from renowned PE players such as Bessemer Venture Partners, New Silk Route and Argonaut Ventures.
8One solar project was signed at Rs 11.89 per unit, another at Rs 9.34 per unit. Yet another at Rs 15 for the first 12 years of its life. Then again there is agreement at Rs 6.95 with a 2% escalation every year.
8The counterparties are apparently very strong and promoters can bank on their 25-year old PPAs
8But can they, when prices are today at new lows ? A recent auction in Mexico saw solar prices dip to a little over Rs 1/kwh.
8Nothing can be taken for granted in the solar sector any more and no distribution company, however strong, will take a loss beyond a point no matter how watertight the PPA is
8The shine on Kiran Energy has clearly worn off for now.
Click on Reports for more   Details
Higher carbon prices -- which are likely to kick in hard by 2025 --  are inevitable and eventually it is this which is going to bring about real changes on the ground.
8A lot of coal based power units will shut down and the rest will be retrofitted with Carbon Capture and Storage (CSS) facilities.
8To be able to transition to a low emission environment not just for the power sector but for all industrial segments, a template has been evolved, involving short term, medium term and long term goals.
8Find out more on how the regulatory matrix is going to look going ahead.
Click on Reports for more Details
Eliminating methane emission is the only way gas-based power or industries are going to survive in a low carbon environment.
8Methane emissions from oil and gas operations were estimated at 76 Mt in 2016.
875% reduction from current methane emission levels seems feasible if all available technologies were to be deployed
8The problem is that at lower gas prices, the level of possible emissions reductions globally with measures that have positive net present values would drop from 50% to 40%.
8That is not good enough.
8Targeted regulations, such as requiring uptake of specific technologies and implementation of specific practices and standards, in addition to reporting requirements, will be needed.
Click on Reports for more Details
Energy efficiency labeling in India has so far not been a success
8The system is full of holes
8How can effective verification, monitoring and implementation rules be enforced?
8What should policy makers do?
Find out more Details
For reference purposes the website carries here the following tenders: 
8Tender for Supply,Erection,Testing and commissioning of 220KV equipments & materials on EPC basis excluding civil works for creation of 02 Nos. of 220KV Feeder bay at TPS S/Stn. for LILO of One circuit of 220KV Line Details
8Tender for Construction of 2x40 MVA, 132/33KV GIS S/S Fathepur Sikari with SAS on turn-key basis including supply, erection, testing & commissioning of all equipments/materials and all civil works Details
8Tender for work of Creation of Electrical infrastructure and providing new house hold service connection in left out locations in a district Details
8Tender for Construction of 132 KV S/C line on D/C tower from 132 KV Aundh to 132 KV Ambheri Substation.(Total Length-14 km) Details
8Tender for Major overhaul works of HP Turbine, IP/LP Turbine and Generator in Unit-1 & Optional works at TPS I Expansion Details
You can also click on Tenders for more. 
For reference purposes the website carries here the following Newsclips:
8Interconnected power market a clear win for South Asia: ADB Details
8India faces painful move to cleaner energy Details
8India's ultra-mega solar project to be discussed at France Summit: World Bank Details
8ArtificiaI Intelligence, big data impacting power sector: Tata Power Details
8There is no need to import coal: Power ministry tells High Court Details
8Trichy heavy engineering firm fabricates vital part for thermal plant Details
8Industrial, commercial power tariff likely to come down on states' resolve to cut cross-subsidies Details
8Tamil Nadu needs urgent policy on green energy, say experts Details
You can also click on Newsclips for more Details
8Project Name: Thermal Power Station Maintenance Project (Unit-4)
8Project Cost: 18 crores
8Project Description: The owner has planned a 21 day scheduled maintenance of Unit-4 (250 MW) in the 1500 MW Thermal Power Station covering an annual maintenance of equipment which includes overhauling of auxiliary parts of turbine, boiler, generator comprising HP, IP, LP cylinders gas testing, testing and cleaning of condenser parts, Residual Life Assessment of boiler pressure parts, assessing performance and condition monitoring of furnace, mills, APH and associated ducts.
8Equipment required will be air filters, nozzle, boiler tubes, valves, buckstays, chevron blades, generator relay, condenser tube banks, thrust bearing, journal bearings, pipes, turbine blades, turbine casing among others.
8Project Event: RFQs for equipment required are expected by fourth week of December 2017.
8Expenditure Approval: Q3:2016
8RFQ Date: 27/Dec/2017
8Release Date: Jan/2018
8Start Date: 1/Feb/2018
8Completion Date: 21/Feb/2018
Click here for more information
8Project Name: Greenfield Supercritical Thermal Power Plant
8Project Cost: 16000 crores
8Project Description: The developer is planning to set up a 2400 MW (3*800 MW) thermal power plant near it's captive coal mines. The STPP is currently awaiting TOR from MoEF. Feasibility report of the project will be done in-house only. Site visit was done by MoEF officers in month of October. The proponent is expected to float an RFQ for a consultant for the preparation of an EIA. RFQs for main plant award (EPC package) are expected by Q1 2019 after getting approval from requisite departments. Also, its note worthy that for the FGD, a separate RFQ shall be floated for an EPC contractor.
8Project Event: RFQ for an EIA consultant is expected to be out in Q1 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: Q1:2018
8Release Date: Q2:2018
8Start Date: Q1:2020
8Completion Date: Q3:2024
Click here for more information Details